Feasibility study report

Feasibility demonstration report is for the project demonstration and decision-making to achieve the basic requirements of the project construction, and finalize the project specific content outline. The following is my compilation of feasibility demonstration report, welcome to refer to.

Part 1: the feasibility study report of the institutions institutions

First, the reason for the project application

A unit is located in a certain area of the city in a certain location of a certain animal a certain park. The a certain venue is not only a venue nature nature of environmental protection science unit, but also biodiversity conservation and species protection of scientific research units, but also a city city of foreign cooperation for environmental protection projects, academic exchanges, an important window.

A unit managed by a certain animal a park international exchanges a venue (hereinafter referred to as: a building) designed by Tsinghua University Architectural Design Institute, with a floor area of 5400 square meters, the design concept is to carry out science education, academic exchanges place. A building was built in 1997, built and used for 13 years, successfully organized more than 300 domestic and international large and medium-sized nature of a meeting, received nearly 1,000 nature of the world's nature of a worker, for the protection of biodiversity and species protection research provides a platform for exchange, for the development of a nature of a cause has played an important role. Especially in recent years, a certain animal a certain nature venues actively respond to the call of the municipal government, free of charge to the public, receiving more than 300,000 domestic and foreign tourists to visit this place every year. With the deepening of the action plan of a city city south of the city, with a certain animal a park as the core of a certain location a park construction, a certain building will assume a more heavy a certain nature of work and cooperation and exchange of tasks.

But a building since the completion of the building, I have a venue self-financing only its simple painting and the purchase of necessary equipment. Years of use and natural wear and tear has made a building roof leakage, exterior wall siding off, large areas of indoor wall damage; ground cracking potholes uneven; fire protection facilities are simple, can not meet the requirements of the current fire protection facilities regulations; electrical pipeline aging; heating, water supply and drainage facilities decay serious, dripping, leakage, the phenomenon of serious; no air-conditioning and refrigeration facilities in the summer, the winter windows inside and outside of the wind, insulation performance is poor; no network, Communication, media and other modern office facilities. A building's supporting facilities backward, the load of the power distribution room is difficult to meet the future transformation of the power needs; sewage treatment equipment after years of use, equipment aging, accessories are difficult to find, maintenance is difficult to increase the sewage treatment task, the performance of sewage treatment equipment is limited, the sewage treatment capacity can not meet the current situation; at this stage of a building is used in a coal-fired heating system, old and dilapidated, difficult to sustain, and there is a serious Pollution of the environment. Above the use of a building problems and safety hazards, become a venue for me to carry out a certain nature of the work of the larger obstacles.

With the further deepening of the international cooperation of my venue, the deepening of the work of a certain nature, as well as the depth of openness to the public to increase the current situation of a building is difficult to meet the needs of the work. Therefore, I a certain venue declared a certain building for renovation and remodeling.

Second, the content of the project

1, a building renovation and transformation of the main building

1-1, a building's internal and external renovation 1-2, the installation of electrical equipment and modern office systems 1-3, update the water supply and drainage and firefighting piping, the installation of automatic sprinkler system, automatic alarm system 1-4, re-doing the waterproofing of the roof 1-5, updating of furniture and installation of refrigeration equipment

2, a building supporting facilities renovation

2-1, power distribution room and distribution facilities system renovation 2-2, sewage treatment system renovation 2-3, boiler room and heating system renovation

Part 2: security system project project demonstration report

I. Basic information

1.

Unit name: a unit

Address and zip code: a city in a certain location, a certain animal a certain park a certain number

Name of the legal representative: a leader

A unit is directly under a higher unit of a certain nature of the institution. Located in the southern outskirts of a certain location of a certain animal a certain park, managed by a certain unit, and the establishment of a certain city biodiversity conservation research a certain venue and a certain city a certain animal a certain park a certain venue nature, covers an area of nearly 1,000 acres, the existing national level of rare a certain animal as well as other endangered species more than 300. An animal a park is not only a venue nature nature of environmental protection unit, but also biodiversity conservation and species protection of scientific research units, it not only has the protection of endangered wildlife and their habitat (wetland ecosystem), to carry out research on biodiversity conservation and improve public awareness of nature conservation and other functions; but also a city of foreign cooperation in environmental protection projects and academic exchanges of an important window. A certain animal a certain park as a large outdoor a certain nature of the venue in a certain city, in a certain city and even the country enjoys a considerable reputation, admirers come to the tourists and students in schools and colleges and universities are endless.

2. Basic information of the project leader

3. Basic information of the project:

Project name: a building renovation and reconstruction project Project type: special funds category Project attributes: new projects

4. Main work content:

(1), a building of the internal and external decoration

After thirteen years of use, a building building The outer wall is seriously damaged,, indoor siding of large areas of shedding, doors and windows inside and outside the leakage of wind, the ground is cracked in large areas, this situation on the one hand, there is a security risk, on the other hand, a certain animal a certain nature of the venue as a certain nature of the unit, to undertake a large number of scientific research projects, to undertake the reception of scientific researchers from all over the country and countries around the world, the current status quo, it is necessary to carry out renovations to show the capital of the nature of the unit of the good image of the unit

(2), the installation of electrical equipment and modern office systems Currently a building power distribution room using GDD switchgear, power distribution facilities can only meet the basic requirements of the building lighting, switchgear, instrumentation cabinets and stand into the cabinets with unreasonable. The building line wire aging, wire specification is small, serious power consumption, there are a lot of potential safety hazards, energy to cause a great waste. Information technology, digital office facilities are necessary equipment for modern office systems. A building is now no network, communication media and other modern office systems, become a venue for me a certain nature of work to carry out the obstacles.

(3), update the water supply and drainage and firefighting pipeline, the installation of automatic sprinkler system, automatic alarm system

Now a building inside the drainage pipe material is cast iron, many corrosion, dripping, leaking, bubbling phenomenon is serious. A building as a public **** building, there is currently no automatic sprinkler system and automatic alarm system, does not comply with the national building fire regulations.

(4), redo roof waterproofing

A building now roof waterproofing material is SBS modified bitumen, the practice of two sticky three oil, after 13 years of use, has long exceeded the use of the waterproofing life, so there are varying degrees of leakage, in recent years this situation is particularly prominent, some areas have ceased to office.

(5), update furniture and installation of refrigeration equipment

A building of some of the existing office furniture is a venue self-funded purchases, due to my venue funds are stretched, furniture materials are the original sawdust plywood, on the one hand, not environmentally friendly, formaldehyde flavor is very heavy, on the other hand, when the moisture on the pine, water on the chemical, all furniture have been more than two repairs, most of which have been at this stage. Most of the furniture has been repaired for more than two times, and at this stage, most of it is already rotten and cannot be used. There is no air-conditioning refrigeration equipment in the building, in the hot summer, the heat is unbearable, not only can not come to a certain park for a certain nature of the activities of the guests to receive, at the same time, I have a great impact on the efficiency of the staff of a venue also exists.

(6), power distribution room and power distribution facilities system transformation

With the smooth development of a certain nature of my venue work, the role of a building is increasingly improved, as well as the gradual improvement of the infrastructure within the venue, the venue's overall power consumption is gradually increased, the current load of the distribution room is difficult to meet the venue's power consumption, the future of a certain building renovation and transformation is completed, the power consumption will be The future renovation of a building is completed, the power consumption will be greatly increased. With a long-term perspective on the development of my venue, the power distribution room and power distribution facilities system transformation is imminent.

(7), sewage treatment system renovation

With the continuous development of my venue over the years, the number of people to visit my park increased dramatically year by year, in the past three years, the annual net growth of more than 100,000 people, the amount of wastewater discharged has also increased, the current sewage treatment equipment has been overloaded, the original design of the power can not meet the current demand. The main components of the current sewage treatment equipment for many repairs, in recent years, due to the long service life, equipment replacement rate is relatively fast, many of the components of our sewage treatment equipment has been damaged, out of the market has been difficult to purchase its matching components, maintenance costs increase year by year, but the equipment operation is struggling. Drainage lines exist in varying degrees of breakage and leakage, sewage treatment system can not complete the sewage treatment task, the leakage of sewage for the survival of the animals caused harm, according to my ecological room of an arena researchers found that, due to the poor treatment of sewage within an arena, resulting in a lot of young animals disease, death.

(8), the boiler room and heating system renovation

I have a venue boiler room has two boilers, tonnage were 1 ton and 2 tons, its maximum heating area of 7500 square meters, has been used for ten years, equipment is old, pipeline corrosion is serious, the performance of the radiators is relatively poor, the cost of maintenance has increased year by year, has been inconsistent with the country's environmental and energy-saving indicators, as well as the future location of the overall requirements of the planning of a park. Park planning overall requirements. The current heating area is far from the theoretical heating area. Due to the gradual increase of facilities of a certain nature in a certain venue over the years, the heating area has actually increased by 7,000 square meters of heating area. A building now heating equipment installation time is relatively early, the current boiler heating equipment has been far from meeting a city city winter indoor minimum temperature of 18 ℃ heating standards.

5, the expected general objectives and milestones of the situation:

The expected general objectives of the project are: to respond positively to the municipal party committee of a city, the municipal government of a certain location in the planning of a certain park ? Humanities a city, science and technology a city, green a city ? the slogan of the city government. To transform a building into a safe, energy-saving, environmentally friendly building to spread the spirit of science and carry out ecological science education.

6, the main expected economic or social benefit indicators:

This project is a public welfare project to save energy, protect the environment and suitable for a certain location of a certain park for the purpose of planning, so as to achieve the nature of a certain nature of the work to promote the smooth implementation of the protection of a certain animal and other endangered species.

7, the total investment in the project:

This project *** counted 26,429,170,999 yuan.

Second, the necessity and feasibility

1. Project background

(1) a building there is a great safety hazard, and the decoration is old, energy waste is serious, and become an obstacle to the work of a certain nature of a certain venue of my.

(2) to a certain animal a certain park as the core of a certain site a certain park construction as scheduled, a certain building renovation to adapt to the municipal government? Humanities a city, science and technology a city, green a city? The guiding spirit.

2. The need for the implementation of the project

A certain animal a park is a biodiversity protection, especially animal protection of a certain nature of the place, national science and education bases, 20XX years since I have a venue in a certain city in China and even the world's popularity is rapidly increasing to a certain park for academic exchanges, a certain nature of the staff is more and more, and I have a certain venue since a certain building. Built and put into use since 13 years without a wide range of maintenance, backward equipment, decoration is old, it is difficult to meet the current requirements for use.

3. Feasibility of project implementation

I have a venue as a certain nature of the work unit, the industry in the new products of the new equipment, safety, reliability of a better understanding of the introduction of advanced equipment, and scientific management and use.

Article 3: Marketing Argumentative Report

As a marketer, the first thing to understand is the change of the market, to understand the competition changes, the future market changes, the potential market relations, the reality of the composition of the market, how to open the market, the market, the development of their own market, the transformation of the market relations, increase market share. . For businesses and companies to increase market profit margins.

With the continuous development of the technology market, technology products have become the mainstream of the market. Among them, the cell phone market is the most active. Not only reflected in the competition in the cell phone market, but also, in the competition of the cell phone operating system. Due to the need for communication, cell phones were created and have been popularized. However, this does not meet the needs of the market, and thus produced a smart phone, and has become today's mainstream, the development of smart phones, mainly depending on the development of cell phone systems. And this year, the cell phone operating system market is really a little hot and heavy. Whether it is the Nokia Symbian system which has the advantage of users, or the Apple Ios system or Microsoft Windows system which is now growing like crazy, or Google's Android system, there are some cold systems which are constantly developing, trying to attract consumers through their respective advantages. New operating systems are also in development, whether it's Samsung's Bada or Nokia's Meego. every operating system manufacturer is using a variety of eye-catching ways to actively in the fight for customers, and strive to occupy a place in the mobile field, the current view of the mainstream cell phone operating system is still Apple, Android, Microsoft and Symbian.

I. Research Overview

1 Purpose of the research

Potential market

To understand the potential changes in the market, according to the survey to predict the development trend, and to find out the potential pattern of change in the market.

Reality Market

In terms of the cell phone market, it was originally a competition in the cell phone handset market, but it has led to a competition in the cell phone operating system.

2 Research Time

XXXX.XX.XX-XXXX.XX.XX

3 Basic Overview

The mainstream operating system market is still occupied by the old brand of cell phones , GARTNER Research recently released a report on the global sales of cell phones in the third quarter of 20XX, which showed that global cell phone sales in 20XX reached 417 million, an increase of 35% over the same period last year, of which smartphones accounted for 19.3% (80 million), up 96% year-on-year. The report shows that IPONE and Android phones were the main reasons for the significant increase in promotions this quarter, with Android becoming the biggest winner in the third quarter. Its market share jumped to 25.5 percent from 3.5 percent last year, making it the world's second largest smartphone OS. Ios' market share fell to 16.7 percent from 17.1 percent, and Symbian's market share dropped to 36.6 percent from 44.6 percent, a very significant drop of eight percentage points. Look at the situation of the emerging operating systems: Windowsphone 7 has just come out, and despite the imperfections of the operating system, it has made a first impression on customers enough to buy more time for upgrading to the next generation. BlackBerry?BlackBerry is the number one smartphone in the U.S. market share, and it can be said that BlackBerry's influence in China is almost nil.Meego and Bada are in a more delicate situation, and in 20XX, they may have more than enough to wait for next year's battle.Palm is almost impossible to find.

Second, the research overview

1 development situation

From the current point of view, the mainstream cell phone operating system market, can be said to be the three-legged tripod, can also be said to be the four kings of the struggle, mainly Nokia, Google, Microsoft and the cold system. Due to the cold system market is blocked, so the formation of a three-legged situation. The development of the system is mainly in three aspects, UI interface, software and hardware.

2 Market situation

I divided the cell phone market, mainstream and non-mainstream operating system division, intelligent and non-intelligent, touch and non-touch and so on. The situation of the cell phone market is constantly changing, the domestic market situation is developing well, foreign brand manufacturers are also trying to enter the Chinese market. The competition in the cell phone system market is fierce, and new operating systems are constantly emerging and developing rapidly. Domestic Tencent and Baidu and so on want to get a share in this field. However, whether they will enter the market, but also depends on the future development of the situation.

3 Future situation

Each operating system vendors are trying to change their own development situation, like Nokia, due to the future situation is not clear, resulting in today's market share of the situation of the overall decline, although in the development of new systems, but in the short term there will be no new changes. Apple, Google, Microsoft, in the future market, in order to maintain and improve the share, the only way to continue to innovate, change and develop.