Two, this standard of charges by the state council department in charge of survey and design organization of the state council departments concerned to prepare, by the state price bureau in conjunction with the state council department in charge of survey and design approved the issuance. Engineering design unit to undertake the task of the nature of the project, respectively, the implementation of this standard in the relevant industry charges. Each construction unit, work design unit, design review department and construction bank and other units should be mastered accordingly and supervise the implementation.
Three, this fee standard *** divided into three volumes. The first volume includes: petroleum, iron and steel, gold, non-ferrous metallurgy, building materials, machinery, chemical and petrochemical, medicine, textiles, light industry, transportation, radio and television, commerce, food, forestry, civil construction, municipal, water conservancy and hydropower, human defense, railway and other twenty-one industries; the second volume includes: nuclear industry, aviation, electronics, weapons, ships, space and other six industries (84 years of the book); the third volume is the "engineering survey, Engineering Design Fee Work Day Quota" trial version, including coal, electric power, post and telecommunications three industries.
Four, this fee is in the former State Planning Commission in 84 years, 85 years issued on the basis of the fee standard, the fixed charges in the unreasonable part of the revised version of the adjustment, still reflects the principle of low fees. That is to say, this fee is based on the comprehensive design capacity of the engineering design units of various industries and based on the expenditure level of the utility fee system for calculation, while taking into account the necessary technology development, business construction, personnel training and other costs required, as well as the industrial and commercial taxes that must be paid.
Fifth, the tariffs to the physical fixed charges, supplemented by a single project estimates for the calculation of the basis of the charges, in addition to coal, electricity, post and telecommunications three industries on a trial basis for the fixed charges for the work day.
Six, the main content of the tariff:
1. engineering design fees: generally include preliminary design and budget estimates, construction drawings, according to the contract with the construction, design and technical submission, participate in the commissioning and acceptance of the completion of the project, and other work costs. This fee does not include the cost of doing construction budget.
2. Preliminary design before the work of fees: is the preparation of feasibility study reports, on behalf of the design task book, to participate in site selection and planning, environmental pre-evaluation and other work required fees.
3. Non-standard equipment design fees: refers to the design of non-stereotyped equipment. Some industry engineering design itself includes equipment design, not another non-standard equipment design fees. Because of the different characteristics of the industry, the scope of non-standard equipment design, by the industry to make separate provisions.
4. Software preparation costs: refers to the factory production process computer control programs and other preparation costs. Industry has a software preparation fees, the implementation of industry standards; industry does not have standards, according to the value of the use of software, the degree of sophistication, and take into account the preparation of the actual workload of the software agreed by the two sides. In addition to the above work other than work, such as separate technical information, drawings, translations, electrical calculations, etc., the charges by the competent department or engineering design unit to develop a separate standard.
Seven, if only commissioned to do process design or civil and public works design, according to the industry division of the design workload in proportion to the calculation of fees. Only commissioned to do preliminary design or construction drawings design, according to the industry division of the proportion of the design workload and multiplied by a factor of 1.1 to calculate the charges. If the preparation of the construction drawing budget is added, the fee is calculated by multiplying the engineering design fee by a factor of 1.1. The engineering design fee in this fee standard is considered according to the design of new projects, if it is an expansion project, except for the industry has clear regulations, it can be charged according to the same kind of new projects multiplied by a factor of 1.1; technical transformation projects, according to the complexity of the design technology, it can be multiplied by a factor of 1.2-1.4 to calculate the fee. Projects that require seismic defense, calculated by the quota, according to the increase in design workload, can be multiplied by a factor not exceeding 1.2.
VIII, engineering design units to provide design documents, must comply with the depth and quality standards set by the state and the competent authorities to provide the number of copies in accordance with the provisions of the implementation of the industry, the commissioning unit to request an increase in the number of copies of the sun printing labor costs.
Nine, engineering design using standard design (except for standard components map), reuse design, according to the same type of new design projects, 20% of the charges. Need to match the foundation or local conditions to make local modifications, according to the same type of new design projects, 30% of the charges. Non-standard equipment design reuse, since the completion of the design of the year after the beginning of the annual reduction of 20% charge, after the reduction of the charge is less than the cost of drawings, can be charged according to the standard drawings and information charges.
Ten, engineering and technical consulting services, to participate in planning surveys, inquiries, quotations, external negotiations and other technical services, as well as the work of not formulating a specific fee, can be used to calculate the fee according to the direct production of man-days, the fee standard is 85 yuan per workday. Calculation of man-days can be carried out on the basis of man-days quota or negotiated between the designer and the commissioner at the time of signing the contract according to the task. Need to travel to the outskirts of the task, the duration of sixty days or less, the travel costs borne by the commissioning unit.
Eleven, according to undertake the design task of a single project estimates for the basis of fees, the calculation of the base should be deducted from the cost of temporary works, construction technology and equipment costs and construction machinery purchase costs, to join the joint commissioning costs. The estimate for a single project shall be based on the preliminary design estimate approved by the competent authority.
Twelve, with the introduction of equipment for the project, according to the estimated cost of a single project as the basis for fees, engineering design is borne entirely by us, the design fee, the price of the equipment should be calculated according to the price of similar equipment. If there is no reference price in China, the original price of the equipment shall be calculated by converting it into RMB according to the national license price. There is the introduction of equipment, according to the estimated cost of a single project based on the project, if the process design undertaken by foreign countries, the calculation base should not include the price of process equipment; according to the physical fixed fee, should be divided into the design workload according to the industry as a proportion of the corresponding design fees deducted. Domestic corresponding process design with the work of the charges, can be designed and commissioned by the actual workload negotiation to determine.
Thirteen, such as the need for international design procedures and depth of the design of domestic projects, because of more than the current domestic design depth, may be appropriate to increase the design fees, specifically according to the actual increase in the workload, determined by the designer and the commissioning party negotiations.
Fourteenth, when undertaking design tasks in remote areas such as Xinjiang, if the charge is calculated according to the fixed amount, the original fixed amount can be multiplied by a factor of 1.1, and the task of undertaking tasks in Tibet can be multiplied by a factor of 1.2 according to the original fixed amount.
Fifteen, engineering design units due to the needs of the task undertaken by the need to go abroad, in addition to the cost of production and installation by the design unit to pay, other costs abroad (including foreign exchange amount) should be paid by the commissioning unit, such as the design unit itself in order to improve the level of reasons such as studying abroad, study, the cost of its overseas by the design unit to take care of their own.
After the engineering design unit undertakes the task, if scientific tests are required for the project, the equipment, materials and labor costs shall be the responsibility of the commissioning unit.
Sixteen, this fee takes into account a variety of factors affecting the design of the workload adjustment factor, if more than two factors in the same project at the same time, the project by the total adjustment factor should be the single adjustment factor after the decimal point of the number of digits of the sum and then add 1, but the total adjustment factor shall not be greater than the maximum value of 1.5. In-kind or working day fixed design fee, where the investment of more than 300 million yuan of projects, the fee shall not be the maximum value of 1.5. For projects with an investment of more than 300 million yuan, the maximum fee shall not be greater than 1.5% of the proportion of the proposed budget.
Seventeen, engineering design units in the design of advanced technology, and have better economic efficiency, confirmed by the design review, can be higher competent review department decided to increase the design fee, generally controlled within 10% of the design fee. If the design quality and technical level fail to meet the contract requirements, the design fee shall be deducted according to the contract.
Eighteen, the design fee according to the design progress in installments. After the design contract comes into effect, the commissioning party shall pay twenty percent of the design fee to the design unit in advance as a deposit; thirty percent after the completion of the preliminary design; fifty percent after the completion of the construction drawings. According to the "construction engineering survey and design contract regulations", design contract fulfillment, deposit against the design fee. After the design fee is paid, the design unit of the design task of the construction project should be coordinated with the construction, to participate in the test test and acceptance of the completion of the project, etc., should not be charged for technical services and travel expenses.
Nineteen, this fee applies to the design unit above the municipal design unit to undertake domestic investment in construction projects design fees, counties and counties below the design unit, to undertake the design task, according to this fee multiplied by the coefficient of 0.85-0.9 billing. Engineering design charges for special economic zones (except for national key construction projects and investment projects within the state budget) may be market-adjusted and negotiated between the design unit and the commissioning unit. Design charges for foreign-funded and Sino-foreign joint venture construction projects, can refer to the relevant design charges abroad, by the designer and the commissioning party **** with the negotiation to determine.
Twentieth, the charges are not included in the project, the design charges by the design unit and the commissioning unit with reference to the negotiation to determine the charges.
Contents of survey and design work
Survey:
Quick-growing and productive timber forest base: small class zoning mapping, land type and professional survey, socio-economic survey, road and other ancillary works survey.
Nursery seed garden: site selection, transfer (survey) mapping, professional survey, determination of the location of structures.
Fly-seeding afforestation: sowing area treadmill, land type and professional survey, sowing area route and navigation point location survey.
Design:
Fast-growing and productive timber forest base: management area planning, determination of afforestation type, tree species planning and design, afforestation technology design, planning and design of auxiliary works such as road fire line, preparation of design manual and planning map, and design estimate.
Nursery Seed Garden: general layout design, technical design, road drainage and irrigation works and auxiliary works design, manuals and budget estimates.
Flying sowing afforestation: sowing area afforestation tree species, sowing amount calculation, design, route, navigation point design instructions and budget estimates.
Civil building design fee schedule
I. This fee schedule includes the design fee fixing and rate charging standard for various types of civil building projects.
Second, civil construction according to its complexity *** divided into six levels, the main features of each level and the scope of application are as follows:
The main features of the engineering level engineering scope of the project examples
Specialized as a national key projects or international activities based on the special high-level large-scale public **** building.
Small and medium-sized public **** buildings of national historical significance or with particularly complex technical requirements.
Buildings of 30 floors or more.
Buildings with sound, light and other special requirements for tall spaces.
State Guesthouse, State Assembly Hall, International Convention Center, International Sports Center, International Trade Center, International Large Airports, International Comprehensive Clubs, Important Historical Memorial Buildings, National Libraries, Museums and Art Galleries, Theaters, Concert Halls, and above three levels of human defense.
1 high-level large-scale public **** building.
Medium and small public **** buildings with regional historical significance or complex technical requirements.
Public **** buildings with more than 16 floors and less than 29 floors or more than 50 meters high.
Superior hotels, tourist hotels, senior guest houses, villas, provincial exhibition halls, museums, libraries, scientific experiments and research buildings (including institutions of higher learning), senior halls, senior clubs, ≥ 300 beds hospitals, sanatoriums, medical and technical buildings, large outpatient clinic buildings, large and medium-sized gymnasiums, indoor swimming pools, indoor ice skating rinks, railway stations in large cities, shipping station, terminal buildings, photo studios, Post and telecommunications building, comprehensive commercial buildings, high-grade restaurants, four levels of human defense, five levels of leveling and combining human defense.
Middle and high level, large and medium-sized public **** building.
Small and medium-sized buildings with high technical requirements.
Residential buildings with more than 16 floors and less than 29 floors.
Teaching buildings of universities and colleges, archive buildings, auditoriums, movie theaters, office buildings of ministries and provincial-level organs, hospitals with less than 300 beds (excluding 300 beds), sanatoriums, prefectural and municipal libraries, cultural centers, children's palaces, clubs, rehearsal halls, lecture halls, rain and wind playgrounds, bus terminals of large and medium-sized cities, railway stations of medium-sized cities, post and telegraph bureaus, multistory comprehensive shopping malls, restaurants with flavors and high-level small Residence and so on.
3 Intermediate, intermediate public **** building.
Buildings of more than 7 floors (including 7 floors) and less than 15 floors with elevator residences or frame structures.
Key secondary schools, secondary specialized schools, teaching, experimental buildings, tele-education buildings, social hotels, restaurants, guesthouses, baths, post and telegraph offices, door clinics, department store buildings, nurseries, kindergartens, comprehensive service buildings, one- and two-story shopping malls, multi-storey canteens, small stations, and so on.
4 general small and medium-sized public **** building.
Residential houses, dormitories and brick buildings without elevators below 7 floors.
General office buildings, primary and secondary school buildings, single-story canteens, single-story car garages, fire garages, fire stations, vegetable stores, grain stations, grocery stores, reading rooms, barber shops, flush public **** toilets.
5 one or two-story single-function, generally small-span structure building. The same characteristics
3, need to put forward a separate architectural design program, special, first-class engineering architectural design program plus 10% of the project design fee; second-class engineering architectural design program plus 6% of the design fee of the project; third-class engineering architectural design program plus 3% of the project design fee; four level (including four) projects do not charge a separate fee for the architectural design program.
Fourth, the charges have included the corresponding general fire system and building decoration design charges, if any special requirements to be negotiated. Specialized decorative design of existing buildings, according to the complexity of the decorative design, according to the decorative cost of 3-5% of the charges.
Fifth, the charges are based on a single project as the basic unit, excluding gas, water, purification, sewage treatment, roads and bridges, boiler houses, gas stations, power substations, pump houses, cooling towers, chimneys and other single buildings and structures, the charges should be in accordance with the standards of municipal and other industries, respectively.
Sixth, undertake the planning and layout of the district, in more than 3 hectares of 700 yuan per hectare charges, 3 hectares of the following charges, but the district's pipeline, greening, earthwork and other design regardless of the size of the proposed budget of 1.5% of the charges.
Seven, to undertake multi-functional buildings, according to the main building function of the calculation of fees, which is more complex than the main function of the part of the phase VIII, civil building engineering grade table "large" generally refers to more than 10,000 square meters of buildings; "medium" refers to 3,000 ~ 10,000 square meters of buildings; "medium" refers to 3,000 ~ 10,000 square meters of buildings; "medium" refers to 3,000 ~ 10,000 square meters of buildings. The "large-scale" in the civil building engineering grade table generally refers to buildings of more than 10,000 square meters; "medium-scale" refers to buildings of 3,000~10,000 square meters; "small-scale" refers to buildings of less than 3,000 square meters. This classification is limited to the use of this table.
nine, only the preliminary design of civil buildings or construction drawings phased design, the proportion of its workload is 40% and 60%.
X. The number of copies of documents to be provided in accordance with this tariff is 6 for preliminary design drawings and 8 for construction drawings.
Reference: