2) In the handling of equipment before to confirm the work tied to build the sling and lifting tools to meet the requirements, such as tied to the correct method, tied to whether the firm, lifting tools have no damage.
3) In the handling of heavy equipment in the process of diagonal lifting equipment, the wire rope is easy to get out of the groove, and when it is serious, the rope will be pulled out of the ropes and cause overturning accidents. At the same time, the heavy equipment will swing quickly after leaving the ground, and it is easy to hurt people and surrounding objects during the swinging process.
4) heavy equipment handling lifting operations to ensure that the wind speed is less than four. Suddenly encountered more than four wind or rain should stop the operation in time to do emergency precautions.
5) Heavy equipment handling is best one-time handling and installation in place, avoid multiple handling.
6) Arrange two warning lines around the handling area, hang warning signs, and prohibit unrelated personnel from entering the work area.
7) Heavy equipment handling is completed by professional personnel.
7) The whole process of heavy equipment handling is done by professional personnel.