Yaogangxian town's three-year plan

In accordance with the county party committee, the county government to coordinate the development of towns and promote the overall requirements of the new socialist countryside construction, in order to improve the production and living environment of the town's people, and to further strengthen the town's planning, construction and management, to promote the economic and social development of the town, and to further improve the town's people's current situation of production and life, and to build a first-class Chenzhou municipal level townships, based on the township, in accordance with the state's relevant policies and regulations, and hereby formulate This plan.

Chapter I Overview of the planning area

I, the basic situation

Yaogangxian Town is located in the eastern part of Yizhang County, east of Rucheng County civilization town is connected to the west and south of the town of Rietian junction, the north of Zixing City, Qingjiang Town, Chukou Town adjacent. The government site is 56 kilometers from the county, 10 kilometers from the provincial highway 324, Riyao highway and Changqing highway through the whole territory, has a good traffic advantage. Town jurisdiction over 14 administrative villages, 3 neighborhood committees, 99 village groups, with a total population of 22,745 people, including 8,978 urban population. The total land area is 101.9 square kilometers, including 10,479 acres of arable land and 90,000 acres of forest land. The area is very rich in mineral resources, water resources, forest resources, including coal, gold, silver, tungsten, lead and zinc and other minerals in mineral resources. State-owned enterprise Yaogangxian mining limited liability company is located in the territory.

Two, socio-economic conditions

Gross Domestic Product (GDP) amounted to 245.29 million yuan, of which the primary industry GDP of 59.2987 million yuan, the secondary industry GDP of 135.9598 million yuan, the tertiary industry GDP of 500.03 million yuan, the total investment in social fixed assets amounted to 55.973 million yuan, the completion of the task of tax revenue from minerals in 2011 120.37 million yuan. Completion of the national tax collection task 273,200 yuan.

The enterprises in the area are mainly concentrated in the minerals and hydropower two blocks, minerals, China Minmetals Yaogangxian Mining Limited Liability Company, Ouhuaren Coal Mine, Yixin silver mine, the lower ping plant, the upper ping plant, Ruijin Mineral Products Company Limited, Yuanda Mineral Products Company Limited, Jiaxing Mineral Products Company Limited, Wanyuan Mining Company Limited (Ruijin, Yuanda, Jiaxing, Wanyuan four are 1 plus 1 model of mineral products (Ruijin, Yuanda, Jiaxing, Wanyuan four is a 1 plus 1 model of mineral processing enterprises), Wangfa Quarry, Xinya Quarry, Leifa Quarry; hydroelectricity, there are Xiaping Power Station, Red Flag Power Station, Tail Water Power Station (these three for the town's collective enterprises), Dashanli Power Station, Yangtan Power Station, Laoya Power Station (these three for the private sector); and there are also two large-scale breeding farms: one is the Green Glory Beef Cattle Breeding Farm (in the village of Yangtan), and the second is the Longshui Wild Boar Breeding Specialized Co-operative Society (in the village of Xiaping).

Chapter II favorable conditions and problems

I, favorable conditions

(a) industrial resources superior obviously. After the merger of Yaogangxian town resources advantage is obvious, is the non-ferrous metal township of Yizhang County, coal township, hydropower township, known as Yizhang's "Pearl of the Orient". Yaogangxian Township People's Government in Changxing Street, less than 10 kilometers from the opening of the Xialong Expressway, the traffic is further convenient, conducive to promoting further economic development, improve the standard of living of the township.

(2) better infrastructure conditions, the masses to build a new countryside is highly motivated. After a long period of poverty alleviation and development of the town, the economic foundation is better, coupled with the launch of Liu Zhenmao typical and expanding domestic demand favorable opportunity, the masses of construction of a better home, improve the production and living conditions have a high degree of enthusiasm.

(3) Yuxin multi-metal technology reform project to build a comprehensive construction, to create the world's tungsten brings a rare historical development opportunities. Yaogang Xian Yuxin multi-metal technical transformation project with a total investment of 670 million yuan, after the commissioning of the annual output of 4500 tons of scheelite concentrate, molybdenum metal 166 tons, bismuth metal 577 tons, according to the current price and later price forecasts for the comprehensive consideration of the projected annual sales revenue of 600 million yuan to achieve a total of 200 million yuan in profits and taxes (taxes and fees of about 85 million per year). The completion of the project will comprehensively drive the development of mass employment as well as the service industry.

Two, there are difficulties and problems

(a) infrastructure is in urgent need of further improvement. Yaogangxian township existing infrastructure, although there is a certain scale and foundation, but from the construction of municipal first-class township requirements there is still a certain distance, especially pingxiang piece, forward village, back to the field of village infrastructure is not perfect, but also need to be actively coordinated by the government departments at all levels and vigorously invested.

(ii) funding is more difficult. Due to the long-term lack of local financial resources, financial transfers are limited, coupled with the town's mass economic income is generally not high, and the current infrastructure and industrial projects require a large amount of money, resulting in the construction of municipal first-class townships invested in a limited amount of funds, the township government rely on their own strength to raise funds is more difficult.

Chapter III guiding ideology, principles and overall objectives of the plan

I, the basic principles of planning

(a) optimize the structure, across the development. To actively carry out investment, the introduction of large-scale enterprises, improve the level of management; continuous integration of social and natural resources, extend the industrial chain, bigger and stronger mining economy, laying a solid foundation for the development of the township's economy; to actively seek support for industrial policy, as soon as possible on the recycling economy industrial park project, reduce land costs, improve product value-added plant, and to achieve the economic leapfrog development.

(2) people-oriented, focus on results. To safeguard the interests of the masses as the fundamental purpose, to improve people's livelihood as the focus, from the solution of the most urgent practical problems in the production and life of the masses, focusing on roads, integrated farmers' markets, running water, electricity, housing, education, medical and health care and other infrastructure construction and village improvement.

(3) According to local conditions, scientific planning. Project construction can not be achieved overnight, according to the wishes of the masses and the actual local development, based on the current, focusing on the long term, the development of milestones and implementation of the program, step by step implementation, and promote the construction of new villages in a solid and orderly manner.

(4) government-led, the main body of the villagers. The town government should take the construction of the villages as a new rural construction work to grasp the major events, the villagers are willing or not, in favor or not in favor as an important criterion for measuring the effectiveness of the construction. Give full play to the main role of the town's masses, guiding the villagers to overcome the "wait and see" thinking, learning from Liu Zhenmao, relying on their own hands to build a better home with the town's characteristics.

(V) to innovate and explore experience. Around the overall requirements of the municipal first-class township construction, innovation, bold practice, and actively explore new ideas and new initiatives to promote the construction of township projects.

Two, the overall goal

(a) grasp the pillar industries, to achieve good and fast development of industry. Solid development of large-scale enterprises: strengthen the Ou Huaren coal mine, Changze silver mine, four small hydroelectric power station (Hongqi, Tailwater, Xiaping, Dashanli), four quarries (Xinya, Xingwang, Changsheng, Leifa) management and skills transformation, improve the policy support for the four mineral processing and trading enterprises (Jiaxing, Yuanda, Ruijin, Wanyuan) and the two selective plant (Yangtan, Wo Sheng); steadily advancing the leading industries in agriculture: bigger three scale baking tobacco bases (Xinya Village, Laoya Village, Qianjin Village), implementing the expansion of three pollution-free vegetable bases (Xiaping, Xinping, Qianjin) and strengthening four specialty farms (wild boar farming, Qinghui beef cattle farming, Xinya flying swan farming and black goat farming).

(2) planning and construction of new villages, improve rural material conditions. In accordance with the new rural construction "production development, living well" goal, in the project planning and construction of rural construction to improve the characteristics of the rural material conditions, improve the production and living conditions of farmers. Through the "one issue at a time", combined with the village environmental health improvement style, drive the rural areas to change the kitchen, circle, toilet, water. Through the help and support of the relevant departments, the construction of village cultural rooms, health rooms and other public welfare facilities. In grasping the courtyard renovation, kitchen renovation and biogas digester construction based on the further grasp of rural garbage disposal, sewage and animal manure treatment, water supply and drainage and fire fighting facilities, and grasp the surrounding environment greening, to achieve the goal of "clean village, unique", a new breakthrough in social development.

(3) planning and development of leisure tourism, growing modern service industry. To advance planning, reasonable advancement, through investment, tourism development, tourism is a green industry, driven by strong, for this reason, we must synchronize the infrastructure construction, vigorously afforestation, landscaping. Timely development of modern service industry, optimize the industrial structure, broaden the way of the industry, to start the private capital vigorously develop modern service industry.

(D) training and creating new farmers, improve rural civilization. To achieve the "town style civilization" as the goal, the prosperity of rural cultural undertakings, strengthen the comprehensive management of social security in rural areas, improve the population family planning work, advocate a new civilized and healthy style, training and creating new farmers.

Chapter IV, the main construction content and budget

(a) water diversion project construction.

Drinking water problem is the people of Yaogangxian an urgent solution to a big problem, but also constraints on the local economic development of a big problem, but also the town party committee, the government is urgently needed to solve the people's livelihood problem. To speed up the pace of planning projects, a new water company. The project is expected to invest 25 million yuan, covers an area of 10 acres, the construction of the main line 8.5 kilometers, the water plant daily capacity of 2,000 tons, to solve the drinking water difficulties of 8,000 people. To actively strive for Yaogangxian Mining Company and the community's strong support, we must raise funds in a timely manner, and strive for early start, early construction, early production.

(ii) comprehensive agricultural market project.

The former Changze Township more than 12,000 people in the government seat Changxing Street currently does not have a specialized comprehensive market. "Dashan guardian" Liu Zhenmao this major typical set up to promote, there will be more people from all corners of the world to visit, study, travel, and even investment in business, in order to speed up the construction of agricultural and sideline products as the main circulation of the farmers' market. The project plans to invest 4.5 million yuan, covers an area of 40 acres, operating area of 13,000 square meters, supporting parking lots and so on.

(C) recycling industrial park project.

Yaogangxian is located at the junction of four counties, there is a wealth of non-ferrous metal resources, years of mining left a large number of recyclable waste ore. We must fully seize the two townships merged resource integration and utilization of advantages, planning a good park, apply for a project in advance, and make every effort to strive for policy support, to solve the current bottleneck in the development of my town's waste enterprises. Make bigger and stronger non-ferrous industry, extend the industrial chain, enhance the added value of products. Through the construction of circular economy industrial park, drive the legal healthy and sustainable development of mineral processing and trading enterprises (Jiaxing, Yuanda, Ruijin, Wanyuan) and the selection of plants (Yangtan, and Sheng). Thereby completing the financial and tax tasks issued by the county. The project plans to invest 4.2 million yuan.

(D) Changze Yixin mine Yangtan processing plant project.

The project investment of 110 million yuan, the current completion of the investment of 60 million yuan, is carrying out the installation of equipment, the construction of the daily amount of 300 tons of ore production line a production line, plans to trial production in June. After reaching production, the annual tax payment can reach 20 million yuan.

(E) Yao and Sheng plant project.

The project covers an area of 30 acres, with an investment of 20 million yuan, and is currently completing the construction of the plant, tailing dam construction, and is carrying out equipment installation and commissioning. Mainly deal with lead-zinc ore, can be 150 tons per day, the annual output value of up to 20 million yuan, taxes and fees of 2.6 million yuan.

(F) new rural construction projects

One is the road hardening project. Involving 13 villages village road hardening, project size of about 18 kilometers, estimated investment of 9 million yuan. The second is the sewage project and garbage disposal project. 15 villages (neighborhoods) each village to build drainage ditches, covers, project scale 7649m, garbage collection and centralized treatment facilities, build a garbage harmless treatment plant. Estimated investment of 14.32 million yuan. Third, the village road lighting project. Involving 16 villages (neighborhoods) villages to install street lights, about 335 street lights installed, estimated investment of 1.8 million yuan. Fourth, the farmhouse style renovation project involves 14 villages, 3 neighborhood committees, *** counting 1,662 households, with an estimated investment of 7,848,000 yuan. Fifth, the rural irrigation water source trunk canal construction, involving 15 villages, repairing the length of about 180 kilometers of aqueducts, with a planned investment of 8 million yuan.

(VII) Changxing Street renovation project

Changxing Street renovation investment estimate of 1.3845 million yuan. Renovation content is mainly:

1, the entire road refurbishment paving cement. (According to the county road standard)

2, in addition to motor vehicles, non-motorized road, the remaining width for sidewalks; at the same time, in the institutions, units and other parts of the corresponding set of entrances and exits.

3, the construction of a permanent parking lot, covering an area of 1,000 square meters, can be synchronized with the bidding of the repair shop and car wash (set up a place is the old supply and marketing, the second is the Changqing Highway intersection on both sides)

4, both sides of the street to implement the greening project, the demolition of some of the old houses, beautification of some of the old houses (whitewash paint).

5, standardize the street light setting.

6, standardize power, telecommunications, radio and television pipeline overhead layout, combined with the actual, can into the ground must be into the ground.

7, set up at both ends of the street passenger temporary platform.

8, set up traffic control facilities, signs, signs, paint traffic markings.

9, the removal of existing streets (except for the transformation of the section of the Supply and Marketing Department) billboards, unified production (top and bottom width of 1.2 meters), standardized implementation, billboards unified green background, red lettering. The government can be appropriately subsidized.

(H) comprehensive tourism development projects.

The use of the town territory of a hundred years of tungsten mine (nearly one hundred kilometers of mine, cableway, shaft elevator), Swan Peak, Dashanling Lion's Mouth 350,000 hectares of primitive eco-forests, combined with the "Dashan guardian" Liu Zhenmao this humanities typical, to "science and technology to explore the mystery, ecological recreation "The main content of the development and construction. Estimated total investment of 15,000,000 yuan

Inside the scenic area to mine exploration, Lion's Mouth hiking for the axis, combined with the Dongjiang Lake ecotourism (National 4A tourist attractions, only 5 kilometers), along the line of development of mining culture exposition area (the world's tungsten mine origin), Swan Peak Alpine Scenic Area, the well exploring the mystery of the area, the mining relics of the display area, Swan Peak Summer Resort (hotels), Lion's Mouth hiking trails. When completed, it will be an ecological mine tourist resort integrating scientific investigation, popular science education, characteristic tourism, leisure and entertainment.

Chapter V Overall Evaluation

I. Economic Benefits

By expanding and strengthening the mining economy, accelerating the adjustment of industrial structure, the development of new tourism industry and the renovation of rural facilities, we can effectively increase the income of the farmers, improve the standard of living of the farmers, and drive the development of the local economy by leaps and bounds.

Two, social benefits

(a) Through the construction of the project, it can make full use of the remaining source of labor power and increase the employment surface. Through industrial development, labor skills training, labor export, can basically solve the town's surplus labor force employment problems, increase the value of labor force, enhance the economic strength of farming families, improve the standard of living of villagers.

(ii) the implementation of the project can effectively accelerate the pace of industrial restructuring, bigger and stronger pillar industries, increase local revenue, thus ensuring public welfare inputs to accelerate the construction of infrastructure, thus constantly optimizing the investment and development of the hard environment, the formation of benign economic and social development.

(3) Through the comprehensive improvement of village environmental health and enrichment of the masses of amateur cultural activities, can effectively improve the civilization of the villagers.

Three, ecological benefits

Through the construction of the circular economy industrial park project can effectively reduce environmental pollution, reduce waste, wastewater discharge, through the "greening attack" can increase the green coverage area, maintain soil erosion, reduce flooding, landscaping; at the same time, increase the construction of rural biogas, provide farmers with ecological energy, effectively reduce coal, water, water and energy consumption, and provide ecological energy, and effectively reduce coal, water and energy consumption, and effectively reduce coal and energy consumption. At the same time, increase the construction of rural biogas, for farmers to provide ecological energy, effectively reduce the consumption of coal, electricity and other energy sources, saving natural energy, reduce the generation of harmful energy waste, in addition to the construction of irrigation canals through the countryside, can enhance the potential for agricultural development, and effectively promote the sustainable development of agricultural production.

Chapter VI Strengthening organizational leadership, guaranteeing a perfect mechanism

The township party committee and government attaches great importance to the work, set up a township municipal first-class township construction leading group, the implementation of a person responsible for developing a specific implementation plan, the establishment of a responsibility system. Wide publicity and mobilization, serious organization and implementation, to provide assurance for the construction of municipal first-class township work.

I, the establishment of a sound system, adhere to the democratic management

Strengthen the construction of grass-roots organizations, innovative work mechanism, for the construction of municipal first-class townships to provide an important organizational guarantee. First, the village "two committees" team active participation, clear their responsibilities and tasks in the construction of municipal first-class townships, adjusting the work of the idea of the task to the implementation of the task. The second is to strengthen the construction of party organizations and cadres in the town, further consolidate and improve the results of the activities of "striving for excellence", and constantly enhance the party's cohesion, combat effectiveness and creativity, and strengthen the service capacity of each branch to provide reliable organizational security for the construction of municipal first-class townships. Thirdly, we will carry out in-depth democratic management demonstration activities, further promote democracy, continuously improve and perfect the villagers' self-governance mechanism with democratic election, decision-making, management and supervision as the main contents, and guarantee the farmers to exercise their democratic rights in accordance with the law by perfecting the systems of "discussing one thing at a time" and openness of the village and town affairs, etc., and improve the functioning of the various branches under the leadership of the Party branches. The mechanism of villagers' self-governance under the leadership of the Party branch is full of vigor and vitality.

Second, the establishment of "government projects, departmental support, social sponsorship, public self-help, market operation" combination of input mechanisms

The government to take the project and funding subsidies and incentives for guided inputs, focusing on the construction of public **** facilities and human settlements, the preparation of the plan and training of personnel and other projects. Project. Actively help solve the difficulties related to the construction of municipal first-class townships. At the same time, increase publicity and mobilization work, make full use of radio, slogans, leaflets, brochures and other forms of extensive publicity municipal first-class township construction, guiding the whole township masses are to support the sponsorship, to stimulate the enthusiasm, initiative and creativity of the masses, and give full play to the main role of the masses in the construction of municipal first-class townships.

Yaogangxian town: set off winter water conservancy boom

"Winter idle people are not idle", since winter this year, Yaogangxian town to y implement the spirit of the 18th National Congress on the "accelerate the construction of water conservancy," the work of the target and the county party committee's economic work conference. The spirit of the current work requirements, seize the season, focus on manpower, material and financial resources, once again set off a winter water conservancy boom, effectively improve the irrigation efficiency of water conservancy facilities and flood control and drought mitigation capacity for the masses of spring plowing escort.

It is reported that, in order to do a good job of winter water conservancy work, Yaogangxian town held a timely winter water conservancy meeting, conveyed the layout of the winter water conservancy work tasks, and actively mobilize the masses, and quickly organize personnel to carry out reservoirs in addition to the reinforcement of the "three sides of the light" construction. So far, has invested more than 300 million yuan on the jurisdiction of the two small two-type reservoirs to carry out a comprehensive de-risking security projects, and more than 3,000 meters of Chenjiatang and other villages to carry out the "three-side light", the follow-up work is in full swing, and strive for the near future to be fully completed. The winter water conservancy work has been fully supported by the masses and actively cooperate with the masses of cadres and masses of unity, strength to a make, to ensure that the town's mass production of water demand.