The unit price of blister = product material cost + energy consumption + labor and transportation + profit
Energy consumption: blister is processed by heat, power consumption is relatively large compared to other industries, roughly 8% of the product material cost Labor: blister is mainly produced by machine, less labor, roughly 10% of the product material cost Transportation: according to the customer's distance from the factory, Profit: blister factory's net profit is generally very low, 12%-20%, depending on the payment term is 14%. Profit: the net profit of the blister factory is generally very low, 12%-20%, depending on the payment term, 30 days checkout for 14% Material cost: the calculation of the material cost of the product is more complicated, before calculating the first to figure out the following aspects of the data:
Raw material prices: according to the use of the product, to determine what kind of materials and grades of materials, looking for the lowest price of this kind of material suppliers Film thickness: to preexamine the product must be used with a thick film, according to the molding of each part of the production, to make, according to the molded parts of the blister factory. Production, according to the thickness and shape of each part of the molding plate number: according to the product dimensions and shape, calculate how many molds a plate can row, row dense will reduce product quality, row thinning will increase material loss, so that the cost of materials loss rate: the main factors for the shape of the product, the number of products, and the dimensions of the chassis of the blister machine with the degree of fit, the more square the shape, the greater the output, the lower the loss rate p>
Materials cost: the main factors for the product shape, product quantity, and dimensions and the chassis of the blister machine, the shape, the more production, the loss rate is smaller p>
Material cost formula
Product material cost = 1 ton of raw material price / 1 ton of raw material finished products quantity
1 ton of raw material finished products quantity = 1 ton of raw material length / (blister template length + 4cm to 15cm stretching edge) X number of layout X (100% - material loss rate)
1 ton of raw material length = 1 ton of raw material / material density / material loss rate
1 ton of raw materials Length = 1 ton / Material Density / Film Thickness / Width (Blister Chassis Width)
The material density (PVC is 1.36T/M3), the width of the blister chassis (0.51-1.20M), the length of the template and the other four parameters are all based on professional experience
.