(a) Transportation Engineering:
1, highway and railroad trunk lines of large bridges, tunnels of medium-length and above;
2, railroads, railroad trunk lines, important stations and railroad hubs of communication, Signal, driving, water supply, electricity and other major rooms;
3, highways, airports above Class II, more than 20,000 tons of wharf.
(2) energy projects:
1, reservoir dams with water storage capacity of 100 million cubic meters or more, and Class I retaining dams located in the upper reaches of large and medium-sized urban areas;
2, thermal power plants with a capacity of more than 300,000 kilowatts or a planned capacity of more than 800,000 kilowatts;
3, hydroelectric power plants with an installed capacity of more than 200,000 kilowatts or more than 500 kilovolts of transformer stations, 220 kV substation of special importance;
4, provincial and prefectural (municipal) level power dispatch centers;
5, nuclear power plants, nuclear reactors, nuclear heating devices;
6, water supply, gas supply, heat supply, oil storage projects.
(C) communications engineering:
1, power more than 200 kilowatts of radio transmitters, television stations (including television stations, television broadcasting control centers, television transmission towers, etc.) of the main building;
2, large and medium-sized cities with a capacity of more than 20,000 doors of the long-distance telephone hub, microwave communication stations, satellite ground communication stations, such as the main building.
(D) other important projects:
1, flammable, explosive and highly toxic substances production workshops, warehouses, as well as earthquakes are prone to serious secondary disasters such as oil refineries, chemical plants and other large and medium-sized industrial and mining enterprises;
2, is located in the hard, medium-hard site, a height of 80 meters or more or medium-soft, soft site, a height of 60 meters or more of the trade, financial, hotels and other Construction projects;
3, provincial, municipal and county governments and their various types of disaster relief emergency response, command institutions, office buildings;
4, large theaters, gymnasiums (centers), and other public **** construction projects;
5, the city (prefecture) of hospitals above the wards, pharmacies, blood banks, operating rooms and important medical equipment rooms. Article VI engineering construction site seismic safety evaluation by the construction unit entrusted with seismic safety evaluation qualification certificate of the unit; entrusted unit shall be completed within the period agreed upon by both parties, and issued a scientific and reasonable seismic safety evaluation report. Article 7 according to the provisions of this must be specialized seismic safety evaluation of engineering and construction projects, its feasibility study report must include specialized seismic safety evaluation, seismic department to participate in the feasibility study report review.
The unit engaged in seismic safety evaluation shall report the seismic safety evaluation report to the provincial seismic department, the provincial seismic department shall make a review decision within 10 days, as the relevant departments to approve the project feasibility study report based on. Need to be reported to the national seismic department for validation, the provincial seismic department forwards.
Not validated seismic safety evaluation report is invalid. Article VIII of the seismic safety evaluation of the implementation of the qualification system, to undertake seismic safety evaluation of the unit, must hold the national seismic department or the provincial seismic department issued by the seismic safety evaluation of engineering and construction sites qualification certificate, and in accordance with the scope of the certificate approved to carry out the work, without obtaining the qualification certificate of the unit, shall not be engaged in seismic safety evaluation within the administrative region of the province. Article IX in our province to engage in seismic safety evaluation of units outside the province, must hold the national seismic department issued by the seismic safety evaluation of the qualification certificate, and by the provincial seismic department to verify the seismic safety evaluation work in the province. Article 10 to undertake seismic safety evaluation of the unit, must strictly implement the national seismic department issued by the seismic safety evaluation of engineering sites specification. Article XI to undertake seismic safety evaluation of units should be in strict accordance with the Ministry of Finance and the State Price Bureau issued by the relevant fees and charges and its standards, and shall not be increased without authorization to increase the charges and raise the fees. Article XII not in accordance with the provisions of the special seismic safety evaluation work or unauthorized determination of seismic standards, the seismic department shall order it to rectify and impose a fine of 10,000 yuan to 20,000 yuan; the circumstances are serious, by the relevant departments to pursue the main leaders of the unit and directly responsible for the administrative responsibility. Article XIII does not have a qualification certificate or beyond the approved scope of the qualification certificate, not in accordance with the norms of seismic safety evaluation work engaged in seismic safety evaluation, the evaluation report is invalid, and the seismic department imposed a fine of 5,000 yuan to 10,000 yuan.