What are the responsibilities of the Receiving and Inspection Officer?

Responsibilities of Receiving and Inspection:

1. In accordance with the legal standards and contractual provisions of the quality of purchased medical devices, the sale of medical devices returned to the quality of the batch-by-batch acceptance and record, the record includes the supplier, quantity, date of arrival, product name, dosage form, specifications, approval number, batch number, manufacturer, expiration date, quality, acceptance of the conclusion and acceptance of the acceptance of the person.

2. Acceptance should be at the same time on the medical device packaging and labeling instructions as well as the relevant requirements of the certificate or document for inspection and record.

3. Imported medical devices in accordance with the relevant provisions of the double acceptance, and check the relevant documents.

4. Check the first varieties of inspection reports and all medical equipment product certification.

5. Acceptance process found in the quality of the abnormal situation, and even found fake, inferior medical equipment products, should be timely feedback to the quality manager.

6. The acceptance of common medical devices is completed within 6 hours, and the acceptance of medical devices with special storage requirements is prioritized and completed within 30 minutes.

7.Responsible for the collection and reporting of medical device quality standards and related information.

8. After opening and acceptance, reply to the package, and sign at the seal.

9. Strictly in accordance with the required number of samples, acceptance methods, judgment standards for acceptance, focusing on the acceptance of the appearance of the quality of the logo and packaging quality. The sale of returned, valuable, expiration date, imports and other medical devices should be strengthened acceptance.

10. The unqualified medical devices should be reported to the quality control officer in a timely manner, after reviewing and notifying the purchaser, and do a good job of unqualified medical devices isolation.

11. Standardize the completion of the acceptance record, clear handwriting, true content, complete project, lot number number is accurate, and sign the seal of responsibility, according to the provisions of the guarantee for inspection.

12. Consciously study the business knowledge of medical equipment, and strive to provide acceptance level.

Expanded

Contents of acceptance:

1. Check whether the project is completed in accordance with the approved design documents, supporting and auxiliary works are completed in synchronization with the main project;

2. Check whether the quality of the project is in line with the state and the Ministry of Railways issued by the relevant design specifications and quality acceptance standards for engineering construction

3. Checking the project equipment supporting and equipment installation and commissioning, and the completion of the contract for the introduction of foreign equipment;

4. Checking the implementation of the budget estimates and the preparation of the final financial accounts;

5. Checking the joint commissioning, dynamic testing, and operation tests;

6. Checking the environmental protection, water protection, labor, safety, health, fire, disaster prevention, safety monitoring system, safety protection and security, and the operation of the project. Safety monitoring system, safety protection, emergency evacuation routes, office production and living housing and other facilities are built according to the approved design documents, qualified, fine test network retesting is completed, retesting results and related information is transferred to the equipment management unit, tools, standing materials are equipped according to the design in place, geologic hazards remediation and seismic defenses of the building in line with the provisions;

7. Check the completion of the project Check whether the preparation of project completion documents is completed, and whether the completion documents are complete and accurate;

8.3 Check whether the source of construction land ownership is legal, whether the area is accurate, whether the boundary address is clear, and whether the formalities are complete.