What are the requirements for architectural design program rendering

Architectural design program rendering requirements are as follows:

1. Cover

Requirements: must indicate the construction project, construction unit, design unit, program completion date, and stamped with the official seal of the construction unit and the design unit qualification seal.

2. Program design instructions and indicators of detail

Requirements: instructions in accordance with the order of planning, architecture, greening, power supply, water supply, drainage, telecommunications, fire prevention, environmental protection, HVAC, energy saving; indicators of detail need to be declared in accordance with the actual design of the building design program to account for the area.

3. Analysis of the current situation and photographs

Requirements: indicate the current situation of the construction site, natural terrain, roads, greening, engineering pipelines and various types of land within the scope of the building, the nature of the building, the number of floors, the quality, the name of the unit, as well as the planning of the number of floors within the influence of the scope of the building to the extent of the number of floors and nature of the building; indicate the site boundaries, various types of planning control lines; on the basis of the current situation of the site topography map, with different colors to indicate the potential for the surrounding area of the site, with different colors. On the basis of the topographic map of the current situation of the site, the location and number of floors of the buildings of potential interest around the site are marked in different colors; the current situation of the photographs must faithfully reflect the color, shape, volume and style characteristics of the surrounding buildings and structures.

4. Planning master plan

Requirements: must be lined with accurate topographic maps, faithfully reflecting the current situation around the plot, indicating the planning of the four to the scope of the various types of planning control lines; indicate the nature of the planning of the building classifications, the various types of building location, number of floors, spacing coefficients, the building setback from the distance of the various types of planning control lines, the name of the road, the width of the road, the municipal and **** transportation facilities, as well as sites, motor vehicle parking lot location. and site, motor vehicle parking lot location; determine the direction and location of the main and secondary entrances and exits, indicating the distance between the entrances and urban road intersections; indicate the elevation of the indoor and outdoor pads and reference points, the outdoor pads shall be used as an absolute elevation, indicating the height of the building as a basis for sunlight analysis; determine the scope of the underground facilities, the entrances and exits of the underground facilities; attached to the land balance table, the technical and economic indicators, and a list of public buildings, the indicators must be strictly detailed in accordance with the national regulations. Indicator content must be strictly in accordance with national regulations marked in detail, supporting public **** facilities must be qualitative, quantitative, positioning in the map.

5. Planning plan positioning map

Requirements: must specify the legal land boundary line and show on the drawings; detailed and accurate indication of building size, height, spacing, and the current spacing of buildings and structures, and the center line of the road, the red line, the distance from the land boundary line, etc.; the map of the proposed building should be labeled with the size of the exterior package (including the external insulation practices), and the text of the building monomer plane size consistent, and to meet the planning size requirements. Dimensions consistent with the text of the building single plane, and to meet the planning size requirements; proposed building must be coordinates positioning, attached to the building corner coordinates.

6. Vertical orientation plan

Requirements: deal with the vertical relationship between the building and the outdoor site, the surrounding roads, combined with the current situation of the plot and the surrounding road elevation for vertical design, as the basis for sunlight analysis.

7. Daylighting analysis

Requirements: must provide the proposed project before the construction of the surrounding buildings of the current situation of daylighting analysis and the proposed project after the completion of the project within the project and on the surrounding impact of daylighting analysis; must use the Ministry of Construction approved by the sunlighting analysis software and by the relevant professionals to make the sunlighting analysis of the drawings must be stamped with the qualification seal of the design unit and the signature of the designers; The drawings must indicate the reasons for shading due to special reasons and clearly indicate the conclusion of the analysis.

8. Architectural design plan

Requirements: must contain each building basement floor plan, first floor, the second standard floor, top floor, roof plan, the plan should be labeled axial dimensions and thickness of the wall, the total dimensions and concave, convex outline dimensions, and indicate the area of each floor.

9. Architectural design plan elevation

Requirements: must be marked according to different elevation form of each building height, color, size, building decoration materials. (Building height should not be higher than the height of the analysis in the sunlight analysis report, building height calculated according to the height of the outdoor ground to the roof of the daughter wall or the eaves of the sloped roof)

10.Architectural design plan section

Requirements: must be marked according to the different sectional form of the height of the buildings, colors, dimensions, architectural decorative materials, etc..

11. Effect drawings

Requirements: including aerial view of the planning and design programs, building single-unit effect diagrams, street effect diagrams along the important streets, planning node effect diagrams, main entrances and exits, etc.; at least two programs; must be consistent with the current situation and reflect the relationship with the current surroundings; the drawings must be accompanied by a brief design description (explaining the style, height, size and volume, etc.).

12. Electronic CD-ROM (1 sheet)

Requirements: The content includes all cad, jpg format files of the architectural design, which must be consistent with the content of the text submitted for review. (PL line should be used to draw the building outline line and area calculation line)

Remarks: In addition to the necessary architectural design related drawings in the text, must increase the general layout plan, plan positioning plan, vertical positioning plan, sunlight analysis drawings and other drawings validated by the Planning Bureau; architectural design description must include building energy-saving chapters; must be in accordance with the national requirements of the designer's signature and stamped with the official seal of the design unit and the design qualification seal; the reported architectural plan must include a chapter of the building; must be signed and stamped with the official seal of the design unit and the design qualification seal. Design qualification seal; the reported building program text must contain more than two different single program, the text using A3 format, plan positioning diagrams, daylight analysis diagrams, such as the need for A1 format can be folded for binding.