(Supervision unit form)
No. Filing content Self-inspection Audit Remarks
Supervision documents
A Supervision Management Documents
1 Project Supervision Planning
2 Project Supervision Details
3 By-pass Supervision Program
4 Meeting Minutes
5 Supervision Diaries
6 Supervision Monthly Reports
7 p>
4 Meeting Minutes
5 Supervision Diary
6 Supervision Monthly Report
7 Other Supervision Management Documents
2 Supervision Technical Documents
1 Subcontractor Qualification Submission and Review Form
2 Engineering Change Order
3 Contractor's General Declaration Form
4 Supervision Engineer's Notification Form
5 Supervising Engineer's Notification Reply Form
6 Certificate of Payment for Works
7 Application Form for Payment for Works
8 Approval Form for Temporary Extension of Works
9 Application Form for Temporary Extension of Works
10 Approval Form for Final Extension of Works
11 Approval Form for Cost Claims
12 Application Form for Cost Claims
13 Supervision Work Contact Form
14 Supervision Engineer Inspection Record Sheet (i.e., Parallel Inspection Record)
15 Engineering Supervision Side Station Record
16 Other Supervision Technical Documents
Yichang City Building Construction Project Sound and Image Archives Photographs and Videotape Shooting Regulations and Requirements
Construction project name:
Name of construction:
Series No. p>No. Construction stage Sound and video data
(sheets or minutes) Remarks
Original appearance before the commencement of construction 1. original site, original appearance and surrounding conditions
2. important buildings
3. demolition and relocation
2 Foundation
Foundation
Process
1. excavation of foundation pits (trench) and pipe trenches
2. excavation of foundation pits (trench) and pipe trenches
3. excavation of pipe trenches
4. excavation of foundation pits (trench)
5. excavation of pipe trenches
6.
2. Foundation inspection
3. Foundation bearing reinforcement, formwork
4. Piling (including hand-dug piles, reinforcing cages)
5. Foundation molding
6. Technical process site of special construction
3 Main
body
work
process 1. Main body design models, drawings <
2. +0.000
3. beams, columns, slabs staircase reinforcement (nodes) binding, templates
4. pipes, wires and other hidden works
5. frame columns corners and feet, etc. wave casting and molding
6. the main body of the structural arrangement, installation of large components on-site
7. masonry works (masonry materials, forms, scaffolding)
8. bathroom waterproofing
9. roof reinforcement binding, pouring and capping
10. waterproofing, heat preservation, anticorrosion engineering process site
11. new technology, new techniques, new materials used in the project
12. engineering accident site and the process of dealing with
Four completion
work
after
After
New
Appearance 1. Overall appearance of the project
2. Completion signage, entrance canopies
3. East elevation, west elevation, north elevation, south elevation
4. Fire-fighting system, meter boxes (water tanks), liquefied petroleum gas station room, etc.
5. Upper and lower stairwells (elevator rooms), deformation joints
6. Residential: Residential: guest, dining room, main and secondary bedrooms, kitchen, bathroom, etc.
7. Office: office, internal and external corridors, conference rooms, public **** bathroom, etc.
8. Roof waterproofing, waterproofing gutter, lightning protection system, etc.
5 Other aspects 1. overall planning of the project, the design of the program map
2. the opening and completion of the ceremony
3. the acceptance of the main body Meeting
Photographs (videotape) requirements: each photo should be accompanied by a text description (including the shooting part, time, location, shooter, etc.), the photo specifications are not less than 3000 × 2000 pixels digital photos. Shooting each set of field video content should have text title and time, construction project video footage of the effective lens time is not less than 10-15 minutes, after the completion of the preparation of the project profile attached to the title. Requirements for the picture composition is beautiful, accurate expression, the main body is prominent, true and complete, is strictly prohibited on the photo (videotape) for any modification, smearing, damage to the authenticity of the photo (video information).
Audio-visual archives important content of the urban construction archives, is intuitive, vivid reflection of the urban construction and development process of the special carrier files. According to the "construction project documents filing and organizing specifications" Chinese People's *** and national standards (GB/50328-2001) and "Yichang City, urban construction archives classification outline" requirements. If the construction project entrusted to the City Urban Construction Archives to take sound and video files of the builder side needs to be in accordance with the requirements of the project construction phase of filming, proactive contact with our museum. The audio-visual files of the above construction projects are one of the contents of the acceptance of the completed project files. Any construction project which does not have complete audio-visual files that meet the quality requirements will not be issued with the Certificate of Compliance of Construction Project Files. Tel: 6457173-8813, 8815 (sound and video technology section): Zhang Hongbo Xu Xuegong
Yichang City, the construction project completion file collection and organization of the verification of the situation
(construction unit with the form)
Serial No. filed content Self-inspection situation Audit Situation Remarks
Construction Documents
A project management documents
1 Project overview table
2 Construction site quality management inspection records
3 Construction start report form, start report
4 Construction completion report form, completion report
5 Construction stoppage report form, stoppage report
6 Construction resumption of work report form, resumption report
7 Construction progress plan analysis report form\\ Construction Progress Plan Analysis
8 Project Milestones
9 Construction Logbook
10 Unqualified Disposal Records
11 Construction Quality Accident Investigation (Survey) Records
12 Construction Quality Accident Report
13 Other Engineering Management Documents
2 Engineering Technical Documents
Three engineering measurement record documents
1 Engineering positioning measurement report form, engineering positioning measurement record
2 Pile foundation trenching inspection report form, pile foundation trenching inspection record (hand-dug hole grouting piles acceptance record)
3 Pile body sample drawings
4 Foundation trenching inspection report form, foundation trenching inspection record
5 Floor alignment report form, floor alignment record
6 Construction program report form, floor alignment record
7 Other engineering technical management documents < Layout record
6 Settlement observation report form, settlement observation record
7 Unit project verticality observation report form, unit project verticality observation record
8 Other engineering measurement documents
Four Engineering Construction Record Documents
1 (piling) concealed work report form, concealed work inspection record
2 (foundation and (foundation) concealed works inspection form, concealed works inspection records
3 (main structure) concealed works inspection form, concealed works inspection records
4 (decoration) concealed works inspection form, concealed works inspection records
Yichang City, the construction project completion file collection and finishing checklist
(construction unit with the form)
Serial No. Filing content Self-inspection Audit Remarks
5 (Roofing) concealed project inspection form, concealed project inspection record sheet
6 (Water supply and drainage, heating) concealed project inspection form, concealed project inspection record sheet
7 (Electrical) concealed project inspection form, concealed project inspection record sheet and lightning protection and grounding device hidden inspection plan
8 (Ventilation and air conditioning) concealed project inspection form, concealed project inspection record sheet and lightning protection and grounding device hidden inspection plan
8 (Ventilation and air conditioning) (Ventilation and air conditioning) concealed works inspection form, hidden works inspection record sheet
9 (elevator) concealed works inspection form, hidden works inspection record sheet
10 (Building Intelligence) concealed works inspection form, concealed works inspection record sheet
11 equipment foundation concealed works inspection record
12 curtain wall and metal doors and windows lightning protection device concealed works inspection record
1313 Record
13 Pre-embedding and reinforcement records
14 Pre-inspection works inspection record sheet
15 Intermediate inspection handover record sheet
16 Foundation treatment records
17 Foundation brazing records (including foundation core samples)
18 Piling construction records
19 Post-drilled piling grouting record sheet
20 Drilled piling grouting record sheet
20 Drilled piling grouting records
20 Drilled piling grouting record sheet
20 Summary of Drilled Pile Construction Records
21 Final Hole Acceptance Record of Drilled Pile
22 Record of Vertical Description of Final Hole of Manually Dug Hole Filled Pile
23 Record of Vibratory (Hammering) Immersed Pile Construction
24 Record Sheet of Rammed and Expanded Pile Construction
25 Record Sheet of Long Screwed Hole Compacted Pile Construction
26 Hydrostatic precast concrete pile, steel pile construction record
27 Hammering precast concrete pile, steel pile construction record
28 Concrete pouring declaration form, concrete construction record
29 Record of concrete slump measurement
30 Concrete curing and temperature measurement record
31 Concrete dismantling application form
32 Concrete, mortar ratio application form, notification form
33 Concrete opening appraisal
34 Pre-stressing tendon tensioning records
35 Bonded pre-stressing structural grouting records
36 Records of lifting of components
37 Records of equipment installation
38 Records of inspection of the building flue (wind) duct
39 elevator load-bearing beams, lifting rings buried hidden engineering inspection records
Yichang City, the construction project completion file collection and organization of verification form
(construction unit with the form)
Serial No. filed content of the self-inspection situation audit situation Remarks
40 elevator wire rope head filling hidden engineering inspection records
41 escalators, travelators installation and commissioning records
40 elevator wire rope head filling hidden engineering inspection records
40 elevator, travelators, travelators, elevators, travelators, travelers, travelers, travelers, travelers, travelers, travelers Installation and commissioning record of escalator and moving walkway
42 Inspection record of the whole machine installation of power-driven elevator
43 Inspection record of the whole machine installation of escalator and moving walkway
44 Other engineering construction documents
5 Recorded documents of engineering test and inspection
1 Civil engineering
1.1 Pile foundation test report
1.2 Dynamic and static load test report of pile foundation
1.3 Test report of low strain reflected wave method of foundation pile
1.4 Test report of vertical bearing capacity of single pile
1.5 Test report of bedrock core drilling test of pile end
1.6 Test report of reviewing horizontal deviation of engineering piles
1.7 Test report of composite foundation load test
1.8 Test report of earthwork compaction test
1.3 Test report of pile foundation
1.4 Test report of pile foundation
1.5 Test report of dynamic and static load test
2 1.8 Geotechnical compaction test inspection report
1.9 Geotechnical ring knife method density test report
1.10 Ultrasonic flaw detection report, records
1.11 Steel component ray flaw detection records
1.12 Post-embedded test inspection report
1.13 Bolt anti-drift test report (including anchor resistance test)
1.14 Bolt test report (including anchor resistance test)
1.15 Bolt test report (including anchor resistance test)
2
1.14 Inspection report on minimum load of bolts in kind
1.15 Inspection report on high strength bolts
1.16 Inspection report on pre-stressing
1.17 Inspection report on steel structure project
1.18 Inspection report on protective layer thickness of reinforcement of structural entity
1.19 Acceptance record on strength of concrete of structural entity
1.20 Ultrasonic rebound comprehensive method of detecting the compressive strength of concrete test report
1.21 Rebound method of detecting the compressive strength of concrete test report
1.22 Core drilling method of detecting the compressive strength of concrete test report
1.23 Concrete test block strength statistics, assessment records
1.24 Masonry mortar test block strength Statistics, assessment records
1.25 Waterproofing water test inspection records (i.e., roof shower records, bathroom toilet water storage, seepage records, etc.)
1.26 Waterproofing acceptance records for civil defense projects
1.27 Decorative tile bond strength inspection report
1.28 Building curtain wall test report
1.29 Silicone structural adhesive Compatibility test report
Yichang city construction project completion file collection and organization verification table
(construction unit form)
Serial No. Filing content Self-inspection Audit Remarks
1.30 Indoor environment test report
1.31 Window performance test report
2 Water supply and drainage, heating works
2.1 Water and electricity test report
2.1 Water and electricity test report
2.1 Plumbing test feedback sheet2.2 (pump) equipment stand-alone test run records
2.3 Commissioning report
2.4 Pipeline flooding, water test records
2.5 Pipeline Strength Tightness Inspection Report, Test Records
2.6 Pipeline (flushing) washing (degreasing) test records
2.7 Indoor drainage pipe pass-through test records
2.8 Indoor drainage pipe test records
2.9 Indoor drainage pipe test records
3 2.7 Indoor drainage pipe ball test records
2.8 Expansion device installation record sheet
2.9 Water tank full water (closed water) test records
2.10 sanitary appliances full water test records
2.11 domestic water purification water quality test report
2.12 fire hydrant test shot records
2.13 automatic sprinkler Pressure test record of automatic sprinkler system
2.14 Record of flushing record of pipe network of automatic sprinkler system
2.15 Record of linkage test of automatic sprinkler system
3 Electrical engineering
3.1 Electrical grounding test report, test record
3.2 Electrical insulation resistance test report, test record
3.3 Electrical Apparatus energized safety inspection records
3.4 Electrical lighting, power test run records
3.5 Distribution boxes, sockets, switches, lamps and lanterns wiring (grounding) energized inspection records
3.6 Low-voltage distribution cabinet handover test records
3.7 Lightning belt bracket tension test records
3.8 Leakage protector test records
3.9 Electrical insulation resistance test reports, test records <
3.9 Record of bearing capacity test of suspension ring for large lighting fixtures
3.10 Lightning protection test report
4 Ventilation and air-conditioning engineering
4.1 Record of stand-alone test run of equipment
4.2 Debugging report
4.3 Record of leakage test for on-site assembly of dust collector and air-conditioning machine
4.4 Record of leakage of ducts and light leakage test
4.5 Record of leakage of ducts and light leakage test
5
4.5 Indoor air volume (temperature) measurement record of each room
Yichang City, verification of the collection and organization of construction project completion files
(construction unit form)
Serial No. Content of the archives Self-inspection Audit Remarks
4.6 Pipe network air volume balance record
4.7 Smoke exhaust system Joint trial operation record
4.8 Record of trial operation of refrigeration unit and unitary air-conditioning unit
4.9 Record of air-tightness test of refrigeration system
4.10 Record of trial operation of ventilation system
4.11 Inspection report of ventilation and air-conditioning system
5 Elevator Installation Project
5.1 Inspection record of elevator's main function
5.2 Record of test of elevator Test record
5.2 Elevator electrical safety device inspection test record
5.3 Elevator machine function inspection record
5.4 Elevator floor door safety device inspection test record sheet
5.5 Elevator load operation test record
5.6 Car leveling accuracy measurement record
5.7 Elevator load operation Test curve diagram
5.8 Elevator noise test record sheet
5.9 Escalator, moving walkway operation test record
5.10 Elevator test report
6 Intelligent Building Project
6.1 Comprehensive cabling test record
6.2 Fiber optic loss test record
6.3 Video System end test records
6.4 System function determination and equipment debugging records
6.5 System test report
7 Building Energy Efficiency Project
7.1 On-site physical inspection report
7.2 System energy-saving performance testing and commissioning, debugging records
8 Other engineering test and inspection documents
6 Cement review form, permission to use the declaration, test reports, factory certificates
7 Brick (block) account
8 Brick (block) review form, permission to use the declaration, test reports, factory certificates
Yichang City, the construction project completion of the archives collection and finishing checklist
(Construction unit form)
Serial No. p>13 waterproofing materials account
14 waterproofing materials report, permission to use the declaration form, inspection reports, factory certificates
15 thermal insulation, anticorrosion, heat preservation, lightweight aggregates and other materials account
16 thermal insulation, anticorrosion, heat preservation, lightweight aggregates and other materials report, permission to use the declaration form, inspection reports, factory certificates
17 components account
17 components account
18
18 Report and approval form, permission to use declaration form, inspection report, factory certificate
19 Silicone structural sealant compatibility, peel adhesion and other accounts
20 Silicone structural sealant compatibility, peel adhesion and other report and approval form, permission to use declaration form, inspection report, certificate of conformity
21 Energy-saving building materials account
22 Building energy-saving materials report and approval form, permission to use the declaration form, inspection reports, factory certificates
23 Doors and windows materials account
24 Doors and windows report and approval form, permission to use the declaration form, inspection reports, factory certificates
25 Ready-mixed mortar account
26 Ready-mixed mortar report and approval form, permission to use the declaration form, inspection reports, factory certificates
27 Soil density, moisture content test report
27 Soil density, moisture content test report
28 Soil density, water content test report
29 Density, moisture content test report
28 Concrete test block compressive strength and seepage resistance account, verification records
29 Concrete test block compressive strength and seepage resistance report card, inspection report
30 Masonry mortar test block strength account, verification records
31 Masonry mortar test block strength report card, inspection report
32 Concrete sand and stone account
33 Concrete sand and stone account
34 Concrete sand and stone account
35 Concrete sand and stone account
35
33 Concrete sand, stone review form, inspection report
34 Concrete, mortar ratio design review form, inspection report
35 Plumbing materials, fittings account
36 Plumbing materials, fittings review form, permission to use the review form, inspection report, factory certificate
37 Firefighting materials, fittings account
38 Firefighting materials, accessories
37 Firefighting materials, fittings account
38 Fire-fighting materials, fittings review form, permission to use the audit report, inspection reports, factory certificates
39 Electrical materials, fittings ledger
40 Electrical materials, fittings review form, permission to use the declaration form, inspection reports, factory certificates
41 Ventilation and air-conditioning materials ledger
Yichang City, the completion of the construction project file collection and finishing situation Verification Form
(Construction Unit Form)
Serial No. Filing Content Self-inspection Audit Remarks
42 Ventilation and Air Conditioning Materials Reporting Form, Permission to Use Declaration Form, Inspection Report, Certificate of Conformity
43 Elevator Equipment Unpacking Reporting Form and Inspection Report
44 Elevator Equipment Certificate of Conformity, Instruction for Use, and Other Materials
45 Intelligent Building Materials Account
46 Intelligent Building Materials Reporting Form, Permission to Use Declaration, Inspection Report, Factory Certificate
7 Construction Acceptance Documents
1 Unit Project Quality Completion Acceptance Record
2 Unit Project Selection and Control Data Verification Record
3 Unit Project Safety and Functionality Inspection Data Verification and Main function sampling records
4 Unit project perception quality inspection records
5 Piling foundation project quality acceptance report, piling sub-projects quality acceptance records
6 Foundation and foundation project quality acceptance report
7 Foundation and foundation report and inspection form, foundation and foundation sub-division project quality acceptance records
8 Foundation and foundation sub-division, Subdivision, quality acceptance record sheet
9 Human defense (basement) project professional structure acceptance form
10 Human defense (basement) water test acceptance form
11 Human defense (basement) inspection form
12 Human defense (basement) sub-division, sub-projects, quality acceptance record sheet
13 Main structural engineering quality acceptance report
14 Main structure inspection form, main body division quality acceptance record
15 Main body sub-division, sub-item quality acceptance record sheet
16 Architectural decoration inspection form, architectural decoration sub-division quality acceptance record
17 Architectural decoration sub-division, sub-item quality acceptance record sheet
18 Roofing division inspection form, roofing division quality acceptance record
17 Architectural decoration sub-division quality acceptance record Acceptance Record
19 Roofing Sub-division, Sub-item Quality Acceptance Record Sheet
20 Building Water Supply and Drainage, Heating Reporting and Inspection Sheet, Building Water Supply and Drainage, Heating Sub-division Quality Acceptance Record Sheet
21 Building Water Supply and Drainage, Heating Sub-division, Sub-item Quality Acceptance Record Sheet
22 Building Electricity Reporting and Inspection Sheet, Building Electricity Sub-division Quality Acceptance Record
23 Building Electricity, Heating Sub-division Quality Acceptance Record Sheet
25 p>
23 Building electrical sub-division, sub-item quality acceptance record sheet
24 Ventilation and air-conditioning inspection form, ventilation and air-conditioning sub-division quality acceptance record
25 Ventilation and air-conditioning sub-division, sub-item quality acceptance record sheet
26 Elevator inspection form, elevator sub-division quality acceptance record
27 Elevator sub-division, sub-item quality acceptance record
27 Elevator sub-division, sub-item quality acceptance record sheet
28 Acceptance Record Sheet
28 Intelligent Building Inspection Form, Intelligent Building Subdivision Quality Acceptance Record
29 Intelligent Building Subdivision, Sub-item Quality Acceptance Record Sheet
30 Quality Acceptance Report of Building Energy Saving Project
Checking Sheet for Construction Project Completion Files Collection and Arrangement in Yichang City
(for construction unit)
No. p>No. Filing content Self-inspection Audit Remarks
31 Building energy-saving inspection form, building energy-saving branch project quality acceptance record
32 Building energy-saving sub-items, quality acceptance record sheet
33 Fire protection project construction quality acceptance documents
Completion drawings
1 Comprehensive as-built drawing
1 General as-built drawing
2 Greening general plan as-built
3 Road general plan as-built
4 Comprehensive as-built drawings of underground pipelines
Specialized as-built drawings
1 Architectural as-built drawings
2 Structural as-built drawings
3 Water Supply and Drainage as-built drawings
4 Electrical as-built drawings
5 Ventilation and air conditioning as-built drawings
6
6 Heating as-built drawings
7 Firefighting as-built drawings
8 Elevator installation as-built drawings
9 Intelligent building as-built drawings
10 Completion of civil defense (basement) engineering as-built drawings
11 Curtain wall engineering as-built drawings
12 Other as-built drawings
Verification form for collection and arrangement of archives of completion of construction projects in Yichang City
Checking form for collection and organization of construction project files
(for construction unit)
Serial No. Content of Filing Self-inspection Audit Remarks
Project Preparation Stage Documents
I Project Documentation
1 Approval Opinion of Project Proposal or Notice of Preliminary Work, Project Proposal,
2 Approval Opinion of Feasibility Study Report, Feasibility Study Report and Attachments
2 Approval Opinion of Feasibility Study Report, Feasibility Study Report and Attachment
3 Report and annexes
3 Minutes of meetings and speeches of leaders on the establishment of the project
4 Documentation of experts' recommendations
5 Investigation information and project assessment and study report
6 Environmental prediction and investigation report
7 Environmental Impact Report on Construction Project (report form and registration form)
2 Documentation of land use and land requisition for the construction project
1 Construction project site selection and land requisition 11 Opinion on the siting of construction projects and attachments (planning and design scope map, proposed land use scope map, demolition scope map)
2 Land use approval letter for urban and rural construction by the people's government at or above the county level and the land use application report
3 Construction land use planning license and attachments
4 Red line map of the land use
5 Agreement on the use of the land
6 Allocation of land for construction Document
7 Report of land expropriation
8 State-owned land right transfer contract (lease contract, allocation contract)
9 State-owned land use certificate (copy)
10 Cadastral map of state-owned land right or block map
3 Document of construction and demolition
1 Certificate of safety appraisal of houses
2 Demolition permit
3 Demolition permit
4 Demolition permit
5 Land agreement
6 Land allocation for construction p>
3 Demolition and relocation opinions, agreements, programs, etc.
4 Demolition and relocation approval documents and applications
Four Construction project planning and management documents
1 Original and copy of construction project planning permit
2 Building location plan
3 Notification of construction project alignment and inspection
4 Notification of construction project external decoration
Five Survey and measurement documents
5 Survey and measurement documents
5 Survey and measurement documents
5 Survey and measurement documents
5 p>5 Survey and mapping documents
1 Engineering geological survey report
Yichang City Construction Project Completion File Collection and Arrangement Verification Form
(Construction unit form)
Serial number Filing content Self-inspection situation Audit situation Remarks
Project preparation stage documents
2 Hydrogeological survey report, natural condition survey < (including technical design drawings and instructions, revised estimates, etc.)
3 notice of approval of design
4 construction budget
5 review of construction design documents (including review of the certificate of conformity, review comments, etc.)
7 relevant parts of the approval documents
1 building construction permit, copies
2 construction projects included in the annual plan of the approval of the documents (including the capital plan, preliminary plan, start plan) Plan, preliminary plan, start plan, increase the infrastructure plan, renewal plan) and application documents
3 investment license and application form
4 building construction and municipal infrastructure projects construction drawings and design documents for the record registration form
5 building fire construction permit and fire protection engineering design review of building works
6 new (expansion) construction of civil buildings, human defense procedures to close the notification
7 relevant parts of the approval documents Notification of Completion of Human Defense Procedures for New (Expanded) Civil Buildings
7 Contract for Termite Prevention Works for Newly Constructed Houses
8 Approval and Application for Cultural Relics Protection Works
9 Approval and Application for Supporting Fees for Urban Construction Infrastructure
10 Permit for Occupation of Roads for Construction Works, Excavation Permit and Drainage Permit
11 Work Plan for Quality Supervision of Construction Works
12 Work Plan for Quality Supervision of Construction Works
12 Construction Engineering Quality Disease Prevention and Control Responsibility Letter
13 Construction Project File Submission Contract
Yichang City Construction Project Completion File Collection and Arrangement Verification Form
(Construction Unit Form)
Serial No. Filing Content Self-inspection Audit Remarks
14 Unit Project Construction Safety Supervision Responsibility Letter
15 Construction Project Safety Supervision Letter
15 Construction Engineering Safety Supervision Letter
15 Construction Engineering Safety Supervision Letter
15 Construction Engineering Safety Supervision Letter < p>
2 Design bidding, tendering and award documents (including scheme selection)
3 Supervision bidding, tendering and award documents
4 Supervision notification of contracting out for the record
5 Construction bidding, tendering, tender evaluation and award documents
6 Construction notification of contracting out for the record
7 Tendering entrustment agreement
8 Other bidding and tendering Contract documents
9 Contract documents
1 Survey contract
2 Design contract
3 Supervision contract
4 Construction contract (including subcontracts such as piling treatment contract)
5 Approval or contract of the relevant departments of the power supply, gas supply, water supply, landscaping and greening etc.
6 Other contracts
10 Construction, construction, supervision agencies and persons in charge
1 Engineering project management organization (Project Manager Department) and the list of persons in charge
2 Engineering project supervision (Project Supervision Department) and the list of persons in charge
3 Engineering project construction management organization (Construction Project Manager Department) and the list of persons in charge
Completion Acceptance Documents
1 Summary of the completion of the project
1 Construction unit construction project completion report
2 Construction unit construction project self-assessment report
2.1 Foundation and foundation self-assessment report
2.2 Self-assessment report of the main structure
2.3 Self-assessment report of the building energy efficiency
2.4 Self-assessment report of the other branches
2.5 Self-assessment report of completion <
3 Supervision Unit Construction Project Evaluation Opinion Report
3.1 Foundation and Foundation Evaluation Opinion Report
Yichang City Construction Project Completion File Collection and Arrangement Verification Form
(Construction Unit Form)
Serial No. Content of Filing Self-inspection Audit Remarks
3.2 Main Structure Evaluation Opinion Report
3.2 Main Structure Evaluation Opinion Report
3.3 Report on opinions on building energy conservation evaluation
3.4 Report on opinions on evaluation of other divisions
3.5 Report on opinions on evaluation of project completion
4 Report on opinions on evaluation of construction works by survey units
4.1 Report on opinions on evaluation of foundations and foundations
4.2 Report on opinions on evaluation of project completion
5 Report on opinions on evaluation of construction works by design units
5 5.1 Foundation and Foundation Evaluation Opinion Report
5.2 Main Structure Evaluation Opinion Report
5.3 Building Energy Efficiency Evaluation Opinion Report
5.4 Engineering Completion Evaluation Opinion Report
2 Record of Completion and Acceptance
1 Construction Engineering Completion Acceptance Report
2 Report of Building Construction Works and Municipal Engineering Works
3 p>2 housing construction and municipal infrastructure construction completion acceptance record form (including the completion of the human defense project acceptance form and the completion of the human defense project record form) and the special acceptance of the recognized documents
2.1 construction project completion planning acceptance opinion, construction project completion planning acceptance certificate and the accompanying drawings, the completion of the planning conditions to verify the results of the report;
2.2 construction fire acceptance Opinion letter of fire protection acceptance of construction project, certificate of fire protection conformity of construction project
2.3 Opinion letter of environmental protection acceptance, acceptance monitoring report of domestic wastewater discharge purification facilities;
2.4 Opinion letter of greening area approval of construction project
2.5 Opinion letter of acceptance of archive of completion of construction project
3 Minutes of the meeting of acceptance of the completion of the construction project
3.1 Foundation and Foundation Completion Acceptance Meeting Minutes
3.2 Main Structure Completion Acceptance Meeting Minutes
3.3 Other Division Completion Acceptance Meeting Minutes
3.4 Engineering Completion Acceptance Meeting Minutes
4 Construction Project Quality Warranty Letter
3 Financial Documents
1 Construction Project Cost Audit Report and Summary
2 Completion Settlement
3 Completion Settlement Filing Form
4 Final Account of the Project