Reference manual for enterprise environmental protection rectification: 1. The road surface in the factory area is hardened, and the ground and wall surface within the sight of the factory area are free of oil stains and sundries, especially some solid wastes such as oil drums and iron surfaces must enter the solid waste room. Old equipment, packing boxes, waste products and other sundries are not allowed to exist and need to be combined and stored together (clean and tidy).
2. Construction of hazardous waste room: requirements: 1. Set up a separate and dedicated room with doors and windows, no other sundries, and fire prevention facilities (such as fire sand and fire hydrants).
2. Install electroluminescence.
3, the ground hardening, clean and tidy.
4. Double-lock and double-person management system outside the door, and dangerous goods signs are hung.
5, indoor wall solid waste management system and solid waste production process flow chart and solid waste ledger.