Site responsibility letter has legal effect
In the construction of the external wall, in order to clarify the rights and obligations of both parties, the implementation of the construction safety responsibility, both parties should enter into the construction of the external wall safety responsibility, then the construction of the external wall safety responsibility letter has legal effect? Below by for you to introduce the relevant content of the letter of responsibility for safety, I hope to help you, take a look. First, exterior construction safety responsibility letter has legal effect According to the Civil Code, the conditions for the contract to enter into force are: both parties have the appropriate civil capacity, the two sides of the meaning of the true, no violation of the mandatory provisions of the laws and regulations, no violation of public order and morals, therefore, meet the above conditions of the contract behavior is legal and effective. Second, project construction safety responsibility contract In order to implement the "safety first, prevention-oriented" policy, clear safety responsibilities of both parties, effectively strengthen the management of construction projects to ensure that the construction of construction of personal, grid and equipment safety, according to the relevant state laws and regulations, the two sides agreed to sign this agreement. Both sides agreed to sign this agreement. Article A: Fuzhou **** Operations Co., Ltd Article II Construction Project: Signing Time: Article III Effective period from June 20XX to June 20XX Article IV Party A safety responsibilities 1, Party A has to assist Party B to improve safety, fire prevention and management, as well as the obligation to supervise and inspect. Party A has the right to inspect and supervise Party B to implement the provisions of work safety, Party B does not meet the safety and civilization of construction behavior to stop, correct and issue a safety rectification notice, until the withdrawal of the field. Three times do not listen to rectification, the future shall not undertake our business. 2, Party A has the right to participate in the construction of Party B's personnel to carry out safety and technical knowledge and safety work procedures of the random test. 3. Party A shall not require Party B to carry out construction in violation of safety management regulations. Party A shall be responsible for any accidents caused by Party A. Article 4 Safety Responsibility of Party B Party B, as the contractor of the project, shall bear the safety responsibility for the personal injury and equipment damage accidents occurred in the process of construction. Party B shall effectively fulfill the following safety responsibilities: 1. The relevant qualification certificates provided by Party B for the contracted project shall be true, legal and effective. 2, on-site construction should comply with national and local laws and regulations on labor safety, labor laws and regulations, to ensure the legitimacy of its employment. Party B must be in accordance with the relevant provisions of the state, for construction personnel for personal insurance, equipped with qualified labor protective equipment, safety gear. 3, the materials need to check whether the production certificate, at the same time should be verified by the party in charge of the site or supervision engineers before use. 4, during the construction period, Party B should assign a full-time safety officer as a safety contact and on-site safety management. 5, Party B, all construction activities, must be prepared to safety construction measures, construction of all construction personnel before the construction of a comprehensive technical safety briefing, and throughout the construction process correctly and completely implemented, no measures or no briefing is strictly prohibited bu_construction. 6, before the start of construction, Party B should organize all construction personnel for safety education. Special operators must have the relevant departments issued by a qualified and valid qualification certificate. Before the start of work, Party B should go to Party A for temporary construction orders. Into the construction personnel should be labeled construction. 7, Party B should be installed in the construction range of temporary fences or warning signs, shall not exceed the specified construction scope of construction, prohibit unrelated personnel from entering the construction site. 8, Party B construction process should be done on a daily basis, day clean, to ensure that the construction site is clean and healthy. 9, do a good job of civilized construction, construction safety; construction process requires the use of electricity, water, should be contacted in advance with the Party, not to pull the connection; do a good job of construction of temporary electricity; according to the specification requirements for scaffolding to do a good job of safety protection to ensure that the construction workers and passengers safety. 10, the establishment of the rectification of the responsibility system, the inspection found in the quality and safety hazards, take effective measures to immediately carry out rectification, the implementation of the person in charge of monitoring, to ensure quality and safety. 11, the site site to effectively strengthen the safety during the holiday, civilized production work, in the event of various types of emergencies and emergencies, to immediately start the plan, and in accordance with the relevant provisions of the timely reporting and proper handling _. Party B shall submit the accident investigation report of the accident investigation team and Party B's accident handling opinions to Party A for the record. 12, the following situations occurring work stoppage and rectification, due to work stoppage caused by the breach of contract responsibility borne by Party B: (1) personal injury and death accidents; (2) the occurrence of construction machinery, production of the main equipment, serious damage to the accident; (3) the occurrence of the site of fire accidents; (4) the occurrence of unauthorized operation, risky operations do not listen to advice; (5) the construction site is dirty, disorganized, Poor, can not meet the requirements of safety and civilized construction; (6) construction process, due to violations of the relevant provisions of the project, was ordered by the relevant regulatory authorities to stop work. Article V. Liability for breach of contract 1, due to Party A or Party B's responsibility to cause personal injury to the other party or a third party, equipment damage and other property losses, the responsible party to bear the corresponding responsibility, and compensate for the other party or the third party so that all the losses caused. 2, Party B did not set _ safety supervision personnel; failed to correctly and comprehensively implement safety measures, construction design; construction personnel did not master the characteristics of the project and construction safety measures; for the project's construction machinery, tools and safety protection equipment does not meet the needs of the construction, Party A has the right to require Party B to immediately stop rectification, the consequences and losses caused by Party B. Article 6 A and B must strictly implement this agreement, the legal effect of this agreement is independent of the main contract. Article VIII of this Agreement by the legal representatives of both parties or proxy signatures and seals after the entry into force. Article IX of this Agreement in quadruplicate, A and B each sign two copies. Article X. This agreement is signed at the place of residence of the party. In order to ensure personal, equipment safety during construction and safe operation of equipment, further clarify the construction of the A and B responsibilities, the implementation of safety responsibilities, according to the electric power industry issued by the relevant provisions of the safety requirements, special signing of the "Construction Safety Responsibility Statement" as an annex to the contract, the relevant provisions are as follows: 1, Party A's safety responsibilities: Party A: Party B: Party B: Party A: Party B: Party A: Party B: Party A: Party B: Party B: Review by Party B to provide the qualification certificate of enterprise legal representative and enterprise legal code and tax registration certificate for review and record. Review by Party B to fill out the outsourcing project construction enterprise safety qualification review form, including construction personnel profile, special operators and "on duty" copy, review by Party B to provide the competent authorities to confirm the original list of engineering, construction technology, on-site safety officer certificate. Party A in accordance with the provisions of the timely issuance of construction permits to Party B. Party A should be submitted to Party B in advance of the project's "three measures" plan for review and guidance, qualified to supervise the strict implementation of Party B, if necessary, or according to the request of Party B and the "safety regulations" require the addition of the Party's special guardian. Coordination of Party B proposed along the line crossing the line blackout with the work, if necessary, should be together with Party B on-site field survey, agreed construction program. Before the start of construction, Party A is responsible for the person in charge of Party B and the site construction manager, engineers and construction personnel to fully explain the site working conditions and the working environment, the relevant safety precautions for the briefing, and should have a complete record or information construction site safety responsibility construction site safety responsibility. During the construction period, Party A has the right to supervise the safety of the construction site, and found that unauthorized operation and endanger the safety of people and equipment, can be stopped in time, corrected, and if necessary, have the right to stop their work, and put forward corrective action to the Party B requirements. 2, Party B's safety responsibilities must have the state administrative departments issued by the effective "three certificates": the business administration department issued a copy of the "business license" copy of the full set of copies, the construction department issued a "certificate of qualification of enterprise construction" copy and "construction safety qualification certificates" copy. Provide a copy of the qualification certificate of the legal representative of the enterprise and the code certificate of the enterprise legal person and the tax registration certificate, and at the same time should provide the original certificate of signing the economic contract entrusted by the legal person, signing the certificate of responsibility for safety and the "into (out of) the city contracting project license". Before the start of work, Party B should fill out the "engineering construction enterprise safety qualification review form", "construction (work) personnel profile", provide a list of special types of operators and "on the job" copy, provide the competent authorities to confirm the project manager, the construction technology manager, the site safety manager list of the original certificate of the construction site. Safety Before the start of the organization of all construction workers on site safety, technical briefing, clear work tasks, so that all construction site personnel at all levels to master the characteristics of the project and safety procedures, construction safety measures, safety precautions. Regular safety activities and summarize the construction workers, and have records, if necessary, ask Party A to send staff to participate. Before the start of construction to provide maintenance works of construction organization, construction operation plan, safety management system, organizational measures and technical measures, complex or dangerous works must be set up a single measure. Prohibit the use of minors and the old, weak, disabled personnel. The construction site of the new entrants (including temporary workers, contract workers and laborers) must be three safety education and delivery of site safety precautions, the relevant records, information is correct and complete before entering the field of operation Polymerization The more technical work prohibit the use of temporary workers, civilian workers or labor cooperation workers, temporary recruitment of civilian workers to the site of the operation of the safety of the education can be carried out after the work Ground auxiliary work, civilian workers, temporary workers are responsible for the safety of Party B construction site safety responsibility letter of guarantee. During the construction period, all kinds of transportation, equipment and tools are provided by Party B. The construction machinery, tools and equipment used in the project will be provided by Party B itself. Construction machinery, work equipment and protective facilities used in the project must have a safety inspection records. Transportation, equipment and tools for the repair and maintenance, as well as in the use of the process of failure or casualties in the cost of Party B is responsible for bearing. Party A is not responsible for any joint responsibility. Construction, Party B strictly implement safety regulations, and do a variety of safety precautions, designate a person responsible for safety, clear safety officer. On the equipment being used in the construction, should be with Party A to develop a detailed construction program to construction. Once found in the construction of potential safety hazards, Party B should immediately stop work, and report to Party A and other relevant departments, to take measures to ensure that after remediation foolproof construction. Construction personnel must be correctly worn when operating safety protection equipment, to ensure that the construction of personal and equipment safety. Party B construction personnel should be issued by the labor department to participate in the construction certificate. Engaged in vertical transportation machinery, installation and demolition, demolition and other special operations, must be in accordance with the relevant provisions of the state after special training in safety operations, and obtain a special operation qualification certificate before going to work. All construction personnel (including civilian workers) must be in accordance with the provisions of Party A to wear a license on duty. Party B should be set up in the construction site of the dangerous parts of the obvious safety warning signs construction site safety responsibility letter construction site safety responsibility letter. Party B may cause damage to the construction of adjacent buildings, structures and underground pipelines, power, communication lines, etc., should take special protective measures. If there is no protection, or improper protection and lead to damage to existing facilities, Party B bear all the responsibility. Timely and detailed crossings along the line, high and low voltage lines, etc. to carry out field surveys, provide written information to facilitate coordination and cooperation with the Party. Party B must accept Party A's supervision and guidance, the occurrence of personal accidents or endanger the construction safety, must immediately report to Party A. The person in charge of Party B (the first person responsible for safety construction) to Party A put forward effective advice must be rectified in a timely manner. Responsible for the contract stipulated by Party B to assume the relevant duties. 3, safety assessment: If Party B violates this responsibility or violates the "safety regulations" and safety rules and regulations, all the consequences caused by Party B to assume full responsibility for safety. If Party B's poor maintenance or safety protection measures are not in place during the contract period, resulting in major safety accidents, all the consequences of which Party B will bear full responsibility. Party A and can be canceled on behalf of the maintenance qualifications, the contract termination of processing. If Party B personnel actively take effective preventive measures, no violation of the responsibility of the book or violation of the "safety regulations" and safety regulations, and in the contract period without the occurrence of liability accidents, Party A should be Party B in the safety of the work of the appropriate incentives. (Suggested reward XX yuan or so) 4, the responsibility of the book in four copies, A, B and the two sides of the two copies, the responsibility of the book of unfinished business, the two sides to solve the problem. This statement of responsibility by the two sides to sign and enter into force. Party A stamp: Party B stamp: Representative: Representative: Signing date: Signing date: The above is for you to introduce the security of the construction of the external wall of the letter of responsibility has the legal effect of the relevant content, in the conduct of the contract, it is best to sign a written contract, in strict accordance with the contract, can reduce unnecessary legal disputes. If there are any problems need to know, you can consult a lawyer to deal with.