Simple waterproof engineering contract

With the enhancement of people's legal awareness, the status of contract can not be ignored, and signing a contract can protect our legitimate rights and interests through law. So what are the common contracts? The following is a simple version of the contract template I collected for you (7 selected), for reference only, and you are welcome to read it.

Article 1 of Party A's Simplified Waterproofing Project Contract:

Party B:

According to the principles of "Economic Contract Law of the People's Republic of China" and "Conditions of Contract for Construction Projects", and in combination with the specific conditions of this project, both parties have reached the following agreement:

I. Overview of the Project

1, project location and project name:

2. Form of contract:

3, quality requirements:

4. Commencement and completion dates:

5. Name of materials used:

6. On-site representative of Party A: On-site representative of Party B:

Second, the project price and settlement method

1, total quantity:

2. Price:

3. Advance payment: (xx% of the total amount) RMB10,000 yuan.

4. Prepayment settlement time and procedures:

5, project settlement time and procedures:

Three. Quality requirements and warranty period

1. Party A shall level, smooth and clean the leveling layer of this project, and meet the requirements of national acceptance specifications, and the special parts shall accept the technical requirements of Party B;

2. Party B shall make the waterproof layer of this project impervious, construct it according to the national construction specifications, and accept the standardized acceptance by Party A and the quality inspection department.

Four. Responsibility of both parties

1. Party A shall provide electricity, hoisting machinery and fuel facilities free of charge, and provide accommodation and convenience for workers.

2. Establish handover procedures. Party A has the responsibility to strengthen the protection of the waterproof finished layer, and whoever damages it will be responsible.

3. Party B shall provide Party A with construction documents such as product certificate and inspection report.

Party B has the responsibility of self-protection, and we are responsible for all safety accidents.

Verb (abbreviation of verb) other clauses

This contract is made in quadruplicate, with Party A and Party B holding two copies respectively, all of which have the same legal effect.

Disputes arising from the execution of this contract shall be settled through negotiation first; If negotiation fails, it shall be submitted to the court or economic court for legal settlement.

The execution and termination time of this contract is from the contract signing date to the project settlement date.

Legal responsibility of intransitive verbs

1. Party A's breach of contract: the waterproof project is qualified, and Party A shall bear all economic losses of Party B; This payment shall be calculated as liquidated damages according to the monthly interest 10%, and bear all legal responsibilities arising therefrom.

2. Party B's breach of contract: in the absence of special circumstances, if Party B fails to carry out the construction on schedule and fails to pass the preliminary inspection, Party B shall bear the corresponding economic losses.

Employer (Party A):

Contractor (Party B):

Date:

Contract 2 of the construction unit of simple waterproof project: _ _ _ _ _ _ (hereinafter referred to as Party A)

Contractor: _ _ _ _ _ _ (hereinafter referred to as Party B)

Party A agrees to entrust Party B to build _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

I. General rules:

1, project name: _ _ _ _ _ _

2. Project location: _ _ _ _ _ _

3. Project content: According to the requirements of the company's _ _ _ _ _ _ _ project construction contact list and design change notice, the waterproof coating of polymer cement base (___cm thick) is used in the kitchen and bathroom project, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Second, the way of contracting:

The general contracting mode of Party B includes contracted projects, materials, quality, management, safety and progress.

Third, the project cost:

Polymer waterproofing between kitchen and bathroom is RMB _ _ _ _ _ _ _ per square meter; The roof is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ yuan per square meter. According to the actual area of settlement.

Fourth, the quality standard:

Party B shall guarantee that this waterproof project is _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Verb (short for verb) Responsibility of both parties:

1. Party A's responsibilities:

(1) Put forward the construction plan in advance, arrange the working face to meet the waterproof construction standard, and submit it to Party B for construction.

(2) The construction period plan should be put forward, but the construction period should be postponed in consideration of the inevitable factors such as weather and manpower.

(3) Cooperate with Party B in construction, such as providing necessary on-site vertical transportation and workers' accommodation.

(4) Party A has the right to supervise and inspect the engineering quality of Party B during the construction process, and ask Party B to make rectification within a time limit if problems are found.

2. Party B's responsibilities:

(1) After receiving Party A's notice, immediately put the waterproof material into the site, and submit the waterproof material certificate, test report and license issued by _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(2) Cooperate with the overall progress of the _ _ _ _ _ _ _ _ base of the urban construction company, and carry out the construction according to the construction plan proposed by Party A, and there shall be no artificial delay except inevitable factors.

(3) Party B shall abide by the rules and regulations of the construction site and shall not violate the rules, otherwise it will be punished by Party A in various forms.

(4) Construction shall be carried out in strict accordance with waterproof engineering standards. When problems are found, solve them in time to ensure the quality of the project reaches excellent standards, and the project is guaranteed for _ _ _ years.

Terms of payment for intransitive verbs:

There is no advance payment for this project, and Party A shall pay the progress payment according to Party B's progress. After all the projects have passed the completion acceptance and reached the excellent standard, Party A shall pay% of the total project payment to Party B, and keep% of the project payment as warranty money. After the warranty period expires, if Party B has no quality problems, Party A shall pay the balance.

Seven. Others:

This contract is made in duplicate, one for each party, with the same legal effect. When the warranty period of _ _ _ years expires and Party A pays off the balance, this contract will automatically become invalid. Matters not covered in this contract shall be settled by both parties through consultation.

Party A (seal): _ _ _ _ _ _

Party B (Seal): _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Contract III of Party A's Waterproof Project Simple Edition:

Party B:

According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, the principles of equality, voluntariness, honesty and trustworthiness are followed. Both parties have reached an agreement on the construction of this roofing waterproof project, and hereby conclude this contract for both parties to abide by.

I. Overview of the Project

1. Project Location: No.1 Middle School Campus in Maozhuang Town.

2. Project name: Maozhuang No.1 Middle School 1 Building, No.2 Building and Menggang Roof Waterproofing.

3. Project content: A new layer of SBS modified asphalt waterproofing membrane is built on the original basis, including detail treatment, subbase treatment agent construction, additional layer construction, waterproof treatment of construction joints and post-poured zones and sporadic projects related to this project.

Second, the scope and methods of contracting:

Contracting projects, materials, quality, safety, progress and civilized construction.

Third, the selection of main materials and the project price. :

1. Material selection: Party B must provide qualification certificate, material inspection certificate, material samples and Party B's construction qualification certificate before construction. The materials can only enter the site after passing the inspection by the inspection center.

2. Contract and materials, with the unit price of 40 yuan/square.

3. Area: settled according to the actual area confirmed by Party A. ..

Fourth, the time limit for a project:

According to the schedule of Party A's project department.

Five, the project quality:

1, engineering quality standard: qualified engineering quality standard.

2, the contractor's construction quality must conform to the current national norms, standards, atlas and design drawings. And meet the requirements of employers. The engineering construction quality must conform to the Elastic Modified Asphalt Waterproof Coil (GB 18242-20xx), and the materials used in waterproof construction must have product certificate and performance test report. Unqualified ones are strictly prohibited. The project quality warranty period is five years from the date of completion acceptance.

Intransitive verb contract price and payment method

According to the quantities actually completed by the contractor and meeting the quality standards, the paving area per square meter is 40 yuan. There is no extra charge. If it fails to meet the quality standards, the contractor shall rework it, and if the rework causes losses to the employer, it shall compensate the employer for the losses. If the contractor refuses to rework, or the construction period is seriously lagging behind, the employer will organize another construction unit to carry out the construction. The Employer may refuse to pay any fees for the quantities already completed by the Contractor, and the Contractor has no objection to this.

7. Party A promises to pay the contract price according to the time limit and method agreed in the contract.

Eight. Other matters:

1. Any dispute arising from the execution of this contract shall be settled by both parties through friendly negotiation. If negotiation fails, apply to the people's court where Party A is located for arbitration.

2. This contract is made in duplicate, which shall come into effect after being signed and sealed by both parties.

Party A:

Party B:

Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A's Waterproof Works Simple Edition Contract 4:

Party B:

In accordance with the principles of the Economic Contract Law of the People's Republic of China, combined with the relevant provisions of Wuhan City, Hubei Province and the specific conditions of this project, Party A and Party B sign this contract through consultation.

Article 1 General situation of the project

1, project name:

2. Project Location: Wuhan Xinmin Hotel

3, construction scheme and material description:

Second construction period:

Article 3 Project Quality Requirements and Scope of Work

1, to ensure the quality of materials and engineering.

2. Article 4

Article 5 Safe construction

Party B shall take safety protection measures according to relevant regulations. Bear the responsibilities and expenses caused by adverse safety measures. Party A is responsible for providing workers' insurance. Party A shall provide Party B with water and electricity supply and construction convenience.

Article 6 Methods of Acceptance and Payment

After Party B enters the site, Party A must send a responsible person to cooperate with Party B, and the project will be constructed as required. After the project is completed, Party A shall be notified to carry out quality inspection, acceptance and signature, and can leave the site only after passing the inspection. The warranty period of this project is five years. If there are any quality problems within five years, Party B will repair them unconditionally.

Article 7 Payment Terms

After the acceptance of the project, it will be settled with the acceptance documents, and 50% will be paid in advance, the remaining 30% will be paid after the acceptance of rain and water tightness, and the remaining 20% will be paid as the quality deposit one year later.

Article 8 This contract shall have legal effect from the date of signing, and both parties shall fully perform the contract and shall not terminate it at will. In case of any dispute, both parties shall settle it through consultation in time. The negotiation failed. Either party may apply for arbitration to the contract arbitration institution in the place where this contract is performed or bring a lawsuit to the people's court in the place where this contract is performed.

Article 9 This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed by both parties.

Party A (seal):

Party B (seal):

Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 5 of Party A's Simplified Waterproof Project Contract:

Party B:

Party A entrusts Party B to use waterproof materials for waterproof treatment (the whole teaching building), and the total cost is 5000.00 yuan.

(1) Contracting method: Party B contracts the project and materials, and Party A is responsible for the quality acceptance.

(2) Quality requirements: Party B shall organize the construction according to waterproof specifications, and the roof shall be waterproof.

(3) Construction period: it will be completed within 20 days from the date of signing the contract.

(4) Party B shall carry out civilized and safe construction when entering the site, and clear the site after work.

(5) During the construction: Party A and Party B work together, and Party A provides necessary construction conditions for Party B..

(6) Settlement method: After Party A passes the acceptance, the official invoice will be used to reimburse the payment at the end of 20xx.

(7) Warranty mode: The free warranty period is 5 years, from February 30th, 20xx 12 to February 30th, 20xx 12. If water seepage is found on the roof during the warranty period, Party B shall repair it for free. After receiving the warranty notice, Party B shall organize manpower and material resources to rush to the site within three days, and Party B shall not shirk it for any reason.

(8) This contract has legal significance from the date of signing.

(9) This contract is made in duplicate, with each party holding one copy.

(10) Other related matters:

Full name of Party A:

Party B:

Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A's Waterproof Works Simple Edition Contract 6:

On behalf of:

Address:

Telephone:

Party B:

On behalf of:

Address:

Telephone:

Party A hereby entrusts the contractor Party B to carry out the construction of _ _ _ _ _ _ _ _ _ waterproof project. In order to strengthen the contract between Party A and Party B, clarify the responsibilities and ensure the smooth progress of the project in the construction process, both parties hereby sign this contract.

I. Contents of cooperation

1 and _ _ _ _ _ _ _ waterproof works shall be constructed by Party B in the form of contract works and materials.

2, the project unit price per square is _ _ _ _ _ _ _ yuan.

Second, the engineering materials and quality requirements

Use _ _ _ _ _ _ _ _ brand asphalt waterproofing membrane, the required thickness is _ _ _ _ cm, and the control is not less than _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Three. terms of payment

After the waterproof project is completed and accepted, _ _ _ _ _ _ _ _% of the engineering quantity shall be paid every other monthly report.

Fourth, the safe construction

In the process of project construction, Party A and Party B should take a responsible attitude and cooperate closely to do a good job in site construction and safety production. Party A shall ensure that Party B meets the requirements of the construction premise, and Party B can complete the project construction on time and with good quality.

Verb (abbreviation for verb) project area

According to the actual area confirmed by Party A, the price is RMB including tax.

Six, shelf life

The warranty period of this waterproof project is _ _ _ _ years; During the quality warranty period, Party B shall undertake the quality warranty responsibility of this project in accordance with the management provisions of relevant laws, regulations and rules and the agreement of both parties; For the items that belong to the warranty scope and content, Party B shall send someone to guarantee them within _ _ _ _ _ days from the date of receiving the warranty notice. If Party B fails to send someone for warranty within the agreed time limit, Party A may entrust others for maintenance; In case of emergency repair accident, Party B shall immediately arrive at the scene of the accident for emergency repair after receiving the accident notice; After the quality warranty is completed, Party A will organize the acceptance.

Seven. responsibility for breach of contract

1. During the construction period, Party B must take all safety measures. In case of safety accidents, Party B shall bear all responsibilities.

2. The products provided by Party B must conform to the provisions of the contract and the requirements of national standards; otherwise, once discovered, the losses caused shall be borne by Party B, and Party A may unilaterally terminate the contract without paying the project payment to Party B, and Party B shall pay _ _ _ _% of the total contract amount to Party A as liquidated damages.

3. Party B must strictly follow the contract brand and the construction technology and material thickness required by Party A, and shall not cut corners. Otherwise, once discovered, Party A may refuse to pay Party B's project payment and unilaterally terminate the contract, and Party B shall pay Party A a penalty of _ _ _ _ _ _ times the total contract price.

4. Once the contract is signed, Party B shall not unilaterally terminate the contract or stop work halfway, otherwise it shall pay _ _ _% of the total contract price to Party A as liquidated damages.

Eight. Dispute mediation

During the validity of the agreement, if there is any dispute between the two parties, it shall be settled through consultation on the principle of mutual understanding and mutual benefit. If negotiation fails, both parties may bring a lawsuit to the people's court where Party A is located.

Nine. others

1. For matters not covered and disputes between the two parties, both parties shall make supplementary settlement through consultation on the principle of friendship and mutual benefit.

2. This contract shall take effect on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A (signature and seal):

Representative (signature):

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B (signature and seal):

Representative (signature):

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Simple waterproof project construction unit (hereinafter referred to as Party A) Contract 7:

Contractor (hereinafter referred to as Party B):

After Party A's investigation and evaluation of Party B's professional qualifications and related materials, according to the national contract and relevant laws and regulations of construction projects, combined with the actual situation of this project, and based on the principles of honesty, trustworthiness, sincere cooperation and mutual benefit, the following contract terms are reached and implemented by both parties through consultation.

I. General principles

1, project name:

2. Project location:

3. Project content:

Second, the way of contracting:

The general contracting method of Party B includes materials, package quality, package safety and package progress, including the handover procedures of waterproof works, and bears the expenses.

Three. Name, specification and model of building materials:

Xinxiang Gloria brand 3mm thick-10℃ polyester tire.

Fourth, the project cost:

1, construction price: 3mm thick double waterproof, one floor per square 38 yuan, the second floor per square 34 yuan.

2. Total construction cost: calculated according to the actual construction area.

Five, quality standards:

1, no leakage, smooth surface, no water accumulation, and no leakage after 24 hours of water storage;

2, coil and coil, the seam between the base and coil should be firmly bonded, there should be no wrinkles, holes become warped edge, layered or sliding phenomenon.

3, lap and end between coil should be bonded, and the coverage should be tight.

The responsibilities of both sides of intransitive verbs:

1. Party A's responsibilities:

(1) Put forward the construction plan in advance, arrange the working face to meet the waterproof standard, and submit it to Party B for construction; The construction site shall be clean and tidy, and the base course shall be solid, smooth and dry, without hollowing, loose sand and unevenness, and the moisture content shall not be greater than 9%.

(2) The construction period plan should be put forward, but considering the inevitable factors such as weather and manpower, the construction period should be postponed; Eliminate the interference to Party B's construction, ensure the smooth progress of the construction, provide accommodation convenience for Party B's construction personnel as appropriate, and provide convenience for Party B's construction feeding equipment and water storage test.

(3) Party A has the right to supervise and inspect the engineering quality of Party B during the construction process, and submit the problems to Party B for rectification within a time limit if found. After the construction is completed, Party A shall arrange a special person to carry out acceptance inspection in time, calculate the construction area and issue an acceptance sheet to ensure continuous construction.

2. Party B's responsibilities:

(1) Wait for Party A's notice, waterproof materials will enter the site in time, and provide a full set of quality documents such as material product specifications, certificates, inspection reports and re-inspection reports.

(2) Cooperate with the overall progress of the project and carry out the construction according to the construction plan proposed by Party A. Except for inevitable factors, there shall be no artificial delay.

(3) Party B shall abide by the rules and regulations of the construction site and shall not violate them, otherwise it will be punished by Party A in various forms.

(4) Construction shall be carried out in strict accordance with waterproof engineering standards. When problems are found, solve them in time to ensure the quality of the project reaches the qualified standard, and the project is guaranteed for five years. In case of quality problems, the labor cost and material cost for rework shall be reported to the project department for acceptance after the self-inspection of phased projects in each construction section is qualified, and Party B shall cooperate with Party A to designate relevant responsible persons to submit the inspection sheet for each segmented project.

Seven, safety precautions:

1. Construction personnel must wear safety helmets when entering the site and obey the site management.

2. When adding gasoline to the blowtorch, avoid spilling gasoline on the ground to prevent ignition from causing fire. The construction site and warehouse must have obvious signs prohibiting fireworks.

3, rain and snow days, it is forbidden to construction above category 5 wind.

4. After work, gasoline, liquefied steam and other materials should be put into storage.

Eight. Payment terms:

1. Party A pays Party B for the first time, and the date is 80% of the total cost of the completed project when the owner pays Party A for the first time; The remaining 20% shall be paid to Party A by the owner for the second time, and the remaining 5% shall be implemented according to the national building warranty regulations.

2. Second payment time: after the first payment, 80% of the total project amount will be paid in batches according to the completed project amount; Pay 95% of the total project cost after the completion experience of this waterproof project is qualified; The remaining 5% is the warranty money, which is implemented in accordance with the national building warranty regulations.

9. After both parties sign the contract, Party B shall pay a quality performance bond of 50,000 yuan to Party A before the construction. When Party A pays the project payment to Party B for the first time, it will refund the deposit of 50,000 yuan to Party B. ..

X this contract is made in duplicate, one for each party. Matters not covered in this contract shall be settled by both parties through consultation. If negotiation fails, the arbitration institution where the project is located shall bring an arbitration lawsuit.

Party A (official seal): _ _ _ _? Party B (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _