Hohhot City, building (structures) lightning protection engineering design review, tracking quality testing and completion acceptance of the implementation measures

Article I In order to strengthen the lightning protection project design review, tracking quality testing and acceptance of the completion of the work, improve the ability of construction projects to defend against lightning disasters, the protection of national interests and the people's lives and property safety, according to the "Chinese People's *** and the State Meteorological Law" and the "Inner Mongolia Autonomous Region, the defense against lightning disasters Management Measures," and other relevant laws and regulations, combined with the actuality of the city, to formulate the measures. Article 2 in the administrative area of Hohhot City, building (structure) mine protection project design review, tracking quality testing and completion acceptance of the work applies to this approach. Article Hohhot meteorological authorities under the city meteorological lightning defense center engaged in the city's lightning protection project design review, tracking quality testing and acceptance of the completion of the work. Article IV of the following places or facilities, according to the national scope of the installation of lightning protection devices:

(a) "Building Lightning Protection Design Code" provides for one, two, three types of lightning-proof buildings, structures, flammable and explosive places, material warehouses and open yards;

(b) petroleum, chemical production or storage sites;

(c) electric power production facilities and power transmission and distribution systems;

(d) factories, mines, enterprises, automatic control systems;

(e) radio and television broadcasting, post and telecommunications communications, computer information systems;

(f) transportation, health care, finance and securities and other socialized public **** the main facilities of the service system;

(vii) in accordance with the laws, rules and regulations and the relevant technical specifications, should be installed with lightning protection devices Other places and facilities.

The above-listed places or facilities must be reviewed by the Municipal Meteorological Lightning Defense Center for design plans, tracking quality testing and completion acceptance. Article V of the lightning protection project shall be designed, constructed and put into use at the same time with the main project. Article 6 lightning protection engineering design should be based on local lightning activity and local geological, meteorological and environmental conditions, combined with lightning protection object protection scope and purpose, in accordance with national and industry regulations of lightning protection design specifications for design. Article 7 Lightning protection engineering design shall include the following:

(1) Preliminary design:

1, design description, survey opinion, design basis, lightning protection classification, etc.;

2, schematic diagram of the lightning protection system;

3, the specifications and models of the lightning protection devices to be used;

4, the relevant drawings and descriptions of the special projects.

(2) construction design drawings:

1, foundation lightning protection plan and drawing, ceiling lightning protection plan and drawing, four placement, elevation, power supply and total distribution plan;

2, grounding devices, lead wires, flashover, electrical equipment and information systems lightning protection and grounding design;

3, equipotential connection of the reserved parts, equalizing pressure ring, Glass curtain wall equipotential connection and shielding design drawings;

4, electrical equipment and information systems surge protector layout design drawings;

5, the relevant drawings for special projects. Article 8 Hohhot Meteorological Lightning Defense Center to review the following aspects involving lightning protection projects:

(1) the design qualification certificate of the design unit and the qualification certificate of the designers;

(2) the construction qualification certificate of the construction unit and the qualification certificate of the construction personnel;

(3) the design drawings and related materials. Article 9 Hohhot Meteorological Lightning Defense Center shall give feedback to the competent administrative department of construction for the non-conformity of the design of the lightning protection project and require the construction unit to rectify the original design of the lightning protection project within a limited period of time until it conforms to the design requirements of the lightning protection project and obtains the certificate of conformity before issuing the construction permit. Article 10 Hohhot Meteorological Lightning Defense Center received lightning protection engineering design drawings, shall be reviewed within seven working days, and issue a certificate of compliance, does not meet the requirements of lightning protection design, re-design within a limited period of time until it meets the requirements of lightning protection engineering design before issuing a certificate of compliance. Article XI of the construction project before the commencement of construction, the construction unit shall apply to the Municipal Meteorological Lightning and Electricity Defense Center for lightning engineering testing and registration procedures. Municipal meteorological lightning defense center shall, according to the characteristics of the construction project, develop lightning protection engineering testing program, and issue a letter of opinion on testing, notify the construction unit. Article XII of lightning protection engineering construction projects with the progress of the project to implement tracking quality testing. After the start of the construction project, the City Meteorological Lightning Defense Center shall be based on the lightning protection engineering testing plan identified in the implementation of lightning protection engineering tracking test. Detection found that the construction quality does not meet the requirements, should promptly notify the construction unit to rectify, re-inspection of qualified before continuing construction. Article XIII of the construction unit to apply for acceptance of completion, where there is a lightning protection device construction projects, the city meteorological lightning defense center must participate in the acceptance and acceptance, and issued a lightning engineering acceptance test report and acceptance certificate.

Problems found in the completion of acceptance, the city lightning defense center should be issued in a timely manner to rectify the letter of advice, the construction unit, the construction unit should be rectified as soon as possible according to the requirements of the completion of the application for re-inspection to the municipal lightning defense center in a timely manner.

Lightning protection project tracking quality inspection report, lightning protection project acceptance test report and acceptance certificate as a construction project completion acceptance of the quality of the project approved the necessary basis.

No lightning protection engineering acceptance test report and acceptance certificate of the construction project shall not be put into use. Article 14 violation of the provisions of these measures, one of the following acts, by the Hohhot meteorological authorities to give a warning, ordered to make corrections within a specified period of time; failure to make corrections after the deadline, shall be fined 3,000-5,000 yuan:

(a) should be installed lightning protection device and refused to install;

(b) lightning protection engineering professional design without the city meteorological lightning Defense Center for examination and approval, unauthorized construction;

(c) does not have the lightning protection detection, lightning protection engineering professional design or construction qualifications, unauthorized to engage in lightning protection detection, lightning protection engineering professional design or construction;

(d) lightning protection project in the construction process, refused to City Lightning Protection and Defense Center for tracking the quality of the test;

(e) the completion of the lightning protection project does not notify the City Lightning Defense Center to participate in the acceptance, put into use without permission;

(f) lightning protection devices, refused to test or failed by the test, and refused to rectify;

(g) the major lightning disaster concealment;

(h) the installation and use of lightning protection devices do not meet the requirements for use.