1, personal safety: in the removal site must pay attention to personal safety, always put their own lives and the safety of others in the first place; in the process of removing the machine to wear the appropriate protective gear, and to do a good job of the corresponding protective measures (such as wearing cut-resistant gloves, medical masks, etc.); mobile heavy objects should be Pay attention to grasp the strength, to prevent over-exertion sprain waist, or lead to other body parts such as arm muscle strain.
2, equipment safety: in the process of moving the machine parts will be fixed firmly, to prevent falling in the process of moving the human body; in the process of moving the machine do not put the tools on the machine, the scene of all the tools and screws should be done: how much to dismantle, how much to install; how much to bring; how much to take away; the lack of never open.
Dr moving process precautions:
1, site inspection: to check to move the appearance and function of the DR machine is intact; test to be moved into the site to meet the requirements, including power supply, site size, site load-bearing, site flatness, location of the ground groove and so on.
2. Planning the moving path: Plan the moving path and make sure the path is smooth.
3, move the machine tools to prepare: ready to dismantle the CT and move the machine parts of the corresponding tools.
4, dismantle the machine: dismantle the machine before the need to back up the state parameters of the machine, to prevent changes after the move.
5, move the machine: due to the rack and bed heavy, so try to use a forklift in the move, in the move by two people on both sides of the support; move into the new site after the components should be neatly placed.