Power outage emergency plan problems and improvement measures

The sudden fire, lightning, wind, flood and municipal network maintenance and other causes of power outages, and according to the hospital's power supply, in order to ensure the smooth progress of medical work, to protect the lives of patients and health and safety, to reduce the loss of hospital property, in line with the ideological importance of the system is complete, the responsibility for the principle of a clear and in place, the development of the power outage accident emergency plan.

First, the blackout emergency response team and responsibilities

Leader: Tan Hui

Members: Kong Xiangde, Zhang Jun, Zhang Xiaorui, Jiang Guolin, Wang Jianjun.

Responsibilities: Responsible for power outage emergency treatment and related equipment repair and maintenance work.

Second, the report:

(a), the planned blackout

24-hour duty officer received the notice of the hospital office blackout, immediately report the blackout emergency response team to make the appropriate emergency preparations. At the same time, the hospital office will notify the details of the power outage to the clinical departments and related power departments, so that they can do a good job in advance of the power outage work arrangements and preparations.

(2), the case of sudden power outages

(1) the clinical departments or related departments suddenly power outages

The clinical departments or related departments suddenly power outages, immediately report the 24-hour duty personnel, 24-hour duty personnel to identify the situation immediately dealt with, and can not be dealt with to report the head of the emergency response team of the blackout incident, the emergency response team can not be dealt with to report the emergency response office, by the emergency response office report to the emergency response office, and the emergency response office report to the emergency response office. Emergency Response Office, the Emergency Response Office to report to the emergency leadership group.

(2) hospital-wide sudden power outage

hospital-wide sudden power outage, the clinical departments to report the 24-hour duty personnel, 24-hour duty personnel immediately reported to the person in charge of the emergency response team of the power outage. At the same time by the hospital office will notify the details of the power outage of the clinical departments and the relevant electricity department.

Third, blackout emergency measures

(a), the circuit protection system

1, dual power supply, blackout two power supply mutual switching time of 5 seconds, to ensure that the whole hospital power supply.

2, emergency power supply (EPS) power supply, EPS starts immediately after a power outage, can ensure that the important departments (operating room, intensive care unit, blood dialysis room, ward rescue room), important equipment (respiratory machines, monitors, etc.) power for 30 minutes.

3, generator power supply, 5 minutes after the blackout (generator warm-up takes 1 minute) to send power to the key departments (operating room, surgical ICU, intensive care unit, blood dialysis room, ward rescue room).

(B), emergency measures taken by the emergency response team

1, planned blackout situation

(1), after receiving the notice of the blackout, blackout emergency response team personnel should immediately check the work of the standby circuit, to ensure that at any time to switch the power supply line. At the same time check the working status of the standby generator set, the standby generator set should be tested to ensure that the standby generator set can be started at any time to generate electricity.

(2), when the power outage, start the dual power supply, the two power supply mutual switching time is 5 seconds, can ensure that the whole hospital power supply. Scheduled power outage time 5 minutes before the arrival of the generator to warm up, in the dual power supply can not be powered, start the generator power supply, on duty immediately in strict accordance with the operating procedures to switch the power supply line, to ensure that the electricity will be sent to the important departments in 5 minutes (operating room, ICU, intensive care medicine, hemodialysis, wards, resuscitation room).

2, sudden power outages

(1), the hospital power outage: start dual power supply, can ensure that the hospital power supply. In the dual power supply can not power, electrician maintenance duty personnel immediately enable generator power supply. Ensure that the electricity will be sent to the important departments within 5 minutes (operating room, ICU, intensive care medicine, hemodialysis room, ward rescue room).

(2), individual sections or departments to report a sudden power outage: 24-hour duty personnel immediately identify the situation, timely treatment, restore power. Can not be dealt with immediately report to the person in charge of the power outage emergency response team, the organization of the relevant personnel repair until the restoration of power supply.

3, in the blackout period, 24-hour duty personnel must monitor the monitoring cabinet on a variety of meters on the index is normal, if there is a double power supply and generator sets can not supply power, immediately report to the person in charge of the emergency response team, the person in charge of the emergency response office, by the emergency response office to report to the emergency leadership team, and immediately contact with the power company to request a mobile power generator support. At the same time by the hospital office to send a notice to the hospital departments, do the corresponding emergency work. Power outage emergency team members and related personnel of the dual power supply and hair 24-hour duty personnel to check and repair, to ensure that the power supply can be restored in a timely manner.

4, by the 24-hour duty personnel safe delivery of electricity, 24-hour duty personnel on some key departments (operating room, ICU, intensive care medicine, blood dialysis room, ward rescue room) to follow up by phone, to ensure that the power needs of key departments.

(C), the sections and departments to take emergency measures

During the power outage, the dual power supply suddenly failed, EPS power supply is not available in the hospital generator power supply before the specific emergency measures:

1, clinical, medical and technical departments

(1), the sections and departments responsible for the receipt of power outage notice, and immediately notify the duty officer and the relevant At the same time, do a good job during the blackout related emergency preparations, including the preparation of materials and equipment (flashlights, emergency lights, etc.); a variety of instruments and equipment spare charging and so on.

(2), sudden power outage, the person in charge of the section or the duty officer to check the region of the emergency lighting is normally open, in order to provide the necessary lighting in a timely manner. If there is a backup power supply, the department will immediately activate the backup power supply.

(3), the person in charge of the department or the duty officer to inform the patients and their families, do not walk around during the power outage, pay attention to safety, to prevent falls.

(4), the key departments (operating room, hemodialysis, ICU, intensive care medicine, etc.) to take the initiative to contact the electrician maintenance class, to further understand the situation related to the power outage, in order to properly arrange the work during the power outage.

(5), sudden power outages, the departments of medical staff are carrying out related work such as surgery, invasive operations, patient rescue, patients are receiving instrumentation and equipment to monitor the treatment of the situation, contact with the electrician maintenance class in a timely manner and inform the relevant information.