Presiding Officer Record
Attendance
Meeting content:
The meeting was chaired by *****, at which, according to the general manager of the cadres held a regular meeting of the spirit of the general manager, as well as recent supervision and inspection of the work of the discovery of a number of phenomena, the next step of the work of a new deployment.
1, safety supervision and inspection. By the original monthly increase to two times a month, the main participants in the safety officer, the main person in charge, according to the inspection of the situation of the rectification instructions; the end of each month to convene a regular meeting of the security, informed of the recent security work.
2, safety inspection system. On-site inspectors, safety officers, managers and other personnel should inspect and register each part according to the system. Inspection frequency is low, not according to the system implemented by the relevant provisions of the penalty; rolling mill in the thin oil station plus a record book, personnel inspection and other in and out of a good registration.
3, plant vehicle management. Now we have more cars in the company, shovels, trucks, trucks, trucks, excavators, trucks, etc., to strengthen the supervision and management of the site personnel, especially construction vehicles, to survey the construction site, found violations, must stop or notify the Ministry of Defense to deal with.
4, subregional setting of security responsibility, special workers pre-service training. Special steel, high line production is imminent, now to start the development of the region's part-time safety responsibility; the position of the safe operating procedures to be compiled into a booklet, the staff to carry out targeted training.
5, the use of operating tickets. At present, we work at height, fire operations, into the confined space operations more, but the use of individual operation ticket or not in place, for the operation ticket signed by personnel at all levels at the same time is also a notice to you to view its precautionary measures and to arrange for personnel to check the assistance, which also reflects the degree of attention to safety. The next step in the inspection found not to handle the operation ticket to be punished in accordance with the provisions of the law, if found unauthorized operation doubled the penalty.
6, the project safety labeling production on the wall. Now the high line has been done in part, done to use as soon as possible, especially the gas station, power distribution room, the operator's desk and other parts of the test run soon, the operator, outsiders play a warning role; special steel part of the safety signage collected to make; new plant signage must be based on the issued national regulations to do.
7, smoking is strictly prohibited. Now every day has been arranged to check the personnel, the night from time to time surprise inspections, on-site if you find personnel smoking all according to the provisions of the treatment, no matter what the situation, we have to notify in place, including our employees and foreign construction team.
8, lightning self-test. Each plant with a motometer on the gas station, distribution room grounding to do a self-test to see if the grounding is in line with the regulations; now there are units to reduce lightning, electrostatic damage to electrical appliances or lines, etc. in the gas station so that the dangerous parts of the installation of the surge device, in order to prevent damage to the study of whether we want to install.
9, summer is approaching, to do a good job of preventing heat stroke and guttering and other cleanup work. Employees to increase part of the cooling water and other measures; part of the equipment to do a good job of checking; high temperature on the car, air conditioning to do a good job of checking and repairing the project on the new car to urge the press on the air conditioning. Before the rainy season, be sure to clean up the gutter, workshop roof gutters, repair damaged downpipes, in order to prevent rainwater back or drenching equipment, the project's construction team low-lying temporary lines to do a good job of cleaning up, in case of accidents.
10, traffic safety. The project has entered some of the new employees, emphasizing good traffic safety at the same time, now to do a good job back, at the beginning let them develop good habits.
Reported *** general manager signed and approved to send members of the safety committee
Send the safety management personnel on April
Minutes of the meeting of the safety symposium [Part 2]
On the evening of April 3, 2012, general manager of the Mineralization Company, Zhao Yibing, convened the SuXi River mine and ShuiYanYa mine mine mine safety management person in charge, safety officers, engineers and technicians, treasurer, and so on. The first quarter safety production special meeting, the meeting invited the former deputy general manager of the Mineralization Company Wang Zexu to participate. The meeting summarized the safety production situation since the resumption of work, analyzed the current situation of the company's safety production and the current situation of the safety production of each team, pointed out the main problems, and put forward specific arrangements for the next quarter of the safety production work and work requirements.
I. Problems
At the meeting, General Manager Zhao and the main management of the mine Wang Zujin, Cao Zhengguo, Yang Debing and other people put forward the following problems.
1, safety and production management personnel and front-line staff with poor mental outlook, style is more diffuse, the idea is not stable enough; the production team personnel are not stable, often change, affecting the normal development of the work.
2, the well ventilation is not in place. There are loopholes in the ventilation of the well, the site management of the working surface, part of the working surface lighting facilities do not meet the requirements, safety measures, facilities and safety officers on-site supervision is not in place.
3, workers and some safety management personnel safety protection awareness is poor, can not strictly according to the requirements of wearing labor protective equipment.
4, mine workers into the mine gatekeeper is not strict, there are documents are not complete, insurance for the phenomenon of untimely.
5, the site management is not in place, not strict enough, the implementation of the relevant regulations is not strong.
Second, put forward the requirements
Zhao general manager of the next work put forward the following requirements:
1, safety management personnel and front-line staff first of all to stabilize the mind, to further strengthen the awareness of production safety, firm and complete reversal of the production safety situation of confidence and determination. Usually to strengthen more business learning, improve business level and ability.
2, to be steady, step by step, to further strengthen the site supervision, in-depth, solid production safety work.
3, to use iron standards, iron face, iron wrist to grasp the work of production safety. At the same time, we should pay attention to details in the management of production safety, strengthen the responsibility, and grasp the implementation to ensure that all kinds of operating procedures, rules and regulations are really put into practice.
4, to engage in production safety work must be aware of the overall situation, take into account the overall situation, and do everything possible to make the mine gradually towards standardization, the successful completion of the 2012 mine zero casualties, production safety provincial standards and "six systems" construction tasks, for the 2015 production safety license renewal work to lay a good foundation.
5, as close as possible to the production task under the premise of ensuring foolproof production safety.
6, to strictly implement quality management methods to ensure the quality of ore mining. The layered blasting, high and low grade separate piles must be strictly enforced, to put a good selection of slag off, and at the same time more contact with the distribution plant, in a timely manner to grasp the quality of the mined ore.
7, must always be taut the string of the management of civil explosives, from the signing of the approval, issued to receive the clearance into the warehouse must not be sloppy. Security Section directly under the management of the Department of Safety and Production, to actively cooperate with the good inspection and management of explosives warehouse. At the same time to quickly complete the construction of the new industrial detonator library to ensure smooth acceptance.
8, must be a good mine workers access, this is a matter of principle, who
open the mouth of the problem who is responsible. At the same time, we must do a good job of prevention and control of occupational hazards, not to lose more than we gain.
Subsequently, General Manager Zhao put forward specific arrangement opinions on the several shifts that have been started and those that are about to be started: Suxi Hexi 995 mine should focus on the roadway construction task, and pay attention to good ventilation during the construction process; ShuiYanYa 1160 mine as soon as possible to complete the construction of the ventilation channel, and before the ventilation channel is completed, it must be implemented mechanical ventilation; ShuiYanYa 1160 mine and 1120 mine to Accelerate the speed of mining back, the replacement of machinery should be replaced in a timely manner, the mechanical operation of the shift should not be skimped on; SuXi River West 935 mine structure is poor, the safety officer to make more efforts, be sure to do a good job in the roof management; water rock house 1076 mine, SuXi River East 995 mine to enter normal production as soon as possible; SuXi River West 905 mine roadway tasks in place, and immediately begin to specification of the layout of the construction of the patio and the mine room; West 995 mine silo should be as early as possible, and the mine room to be built; West 995 mine warehouse to be as early as possible, and the mine room to be built. 995 mine mine silo to start as soon as possible, early completion, shall not affect the normal production and construction.
Wang Zexu pointed out that the company's mine safety production is now in a passive situation, the situation is not very good. He said that although he resigned, but will continue to do a good job of mine safety, at the same time, he is willing to do his best in the company when needed to provide the company with reference, but not directly involved in the management. In addition, he suggested that good mine safety management to coordinate the overall situation, the overall layout should be combined with each mine, good safety should also be good quality.
Mine manager Wang Zujin made a detailed summary of the work in March, put forward the main problems of mine safety, and made detailed arrangements for the work in April. He emphasized four aspects of roof management, ventilation management, blasting safety and occupational disease prevention, and asked each section and each safety production manager to work harder on the details of the work and take responsibility for their own. He emphasized that each safety production management personnel monthly
in the mine working time of not less than 25 days, at the same time, we must strictly implement the system of leave, to put an end to the phenomenon of scattered work, the strict implementation of the quarterly assessment system, the quarterly assessment will be used as the basis for the end of the year assessment.
The meeting decided that the lunar calendar March 18, the organization of the company's safety production management personnel for medical examination. The solar calendar May 6, May 16, May 26 mines to stop production, the organization of the whole staff in-depth training. In the future, monthly or quarterly to organize an all-round safety production inspection, timely investigation of hidden dangers. The company will organize the recent mine management personnel to Zhongping, Yaozhi River to visit and learn their mine layout, "six systems" construction, etc., to learn their good practices in safety management, and gradually standardize our safety management.
The meeting strengthened the confidence and determination of all safety production management personnel to completely turn around the company's safety production situation. 2012 safety production work can't be half a mistake, no matter what, we must do everything possible to grasp the mine safety production management, to ensure that the company's "safety production accident-free 2,000 days" activities of the smooth development and completion, to ensure that the company's "safety production accident-free 2,000 days" activities, and to ensure that the company's "safety production accident-free 2,000 days" activities. The company's "2,000 days of accident-free production safety" campaign was successfully carried out and completed, and the battle to completely reverse the production safety situation and the company's image was well fought.
April 3, 2012
Baokang County Huanglongguan Mineralization Co. At 14:00 on January 24, 2015, the leadership team of the manager department, the person in charge of each functional department, the manager of each division, the secretary, the chief engineer in the conference room held a safety meeting in January 2015, which informed the safety production situation in this month and the safety and quality precautions in the next month, the minutes of the meeting are as follows:
First, the engineering department: the engineering department of each division is asked to timely issue the safety and technical delivery of the key construction parts (manually excavated piles). The key construction parts (manually dug hole pile construction) issued special safety instructions, and tracked by the project leader to implement, to ensure that the construction process of safety and quality can be controlled.
Second, the Ministry of material and machinery: require each branch of the equipment has been into the field to carry out an inventory, to put an end to the "sick machinery" operations, focusing on checking the size of the crane hooks, wire ropes and so on is intact; to ensure that the mechanical "person certificate" complete, special equipment for the record, special equipment requires strict management; other materials, such as materials, equipment and equipment, are not only the same as the original, but also the same as the original. Special equipment requires strict management; other materials are organized, together, to achieve civilized construction site.
Fourth, the Department of Safety and Quality:
1. The second division requires rectification: xx-x bridge 144 # drilling rig construction power, 143 # pier dug pile orifice protection in accordance with the requirements of rectification, and January 23rd will be rectified
change the notice sent to the command of the Department of Safety and Quality.
1, safety and quality pamphlet is being prepared, the bridge part is close to completion; 2,
Second, remind each division and the supervision unit and other relevant units to get a good working relationship, pay attention to the relevant inspection process;
Third, standardization of the construction of the division to break down on their own, if there is any doubt, please contact with the command of each of the counterparts in a timely manner to solve the problem;
Fourth, to communicate "Notice on conscientiously implementing the spirit of the fourth quarter 2015 production video conference of the joint-stock company, comprehensively improve and strengthen the safety and quality control work" (
V. The implementation of the construction organization design of each division is nearing completion, the safety and quality of the construction organization design, please submit the first draft of each division to the command department before February 10th, in order to To meet the time limit of the Bureau of evaluation of the overall safety and quality of construction organization design needs.
Sixth, next week's arrangements
1, safety and quality department is preparing safety, quality and environmental protection self-control system documents
2, safety standard site creation plan has been uploaded to the workgroup *** enjoy the file, each division to download their own check the creation of the time, feedback to the Department of Safety and Quality on January 23, when it will be based on the plan to organize the acceptance of the relevant departments;
3, the next week January 22 will be a special pre-season and the first day of the festival will be held on the second of the month. 22nd will be carried out before the holiday special and January 2015 safety, quality and environmental protection inspection. The main inspection content is, the site and the site of temporary electricity, fire and other safety and quality. After the inspection will be in the form of a document to inform the inspection;
1, briefing on this month's inspection;
2, near the end of the construction team to strictly strengthen the management of personnel, can not run without work, travel must be to the person in charge of the team to ask for leave, go out to pay attention to the traffic and other safety;
3, the weather is getting colder and colder, lifting the arch bridge construction is the top priority, has been gradually Into the winter construction, high altitude cold must pay attention to good overhead protection and protection work;
4, the construction team must pay attention to the guardrail plate construction of the appearance of quality and line control.
5, this month's safety summary:
This month, the main "11.15" activities of the oath and inspection activities, this month's major safety hazards are mainly for the basket arch bridge steel arch lifting, has been installed in 29 pieces, the relevant personnel have also carried out the side station, lifting before the crane driver and the commanding officer Training was conducted.
6, next month the main attention. Construction precautions and the main work:
1, notification of the existence of major sources of danger next month: bracket erection and dismantling, high template lifting, lifting the arch bridge steel arch installation, Anxiao and adjusting the cable construction;
2, the wear of personal protective equipment for work at height;
3, the construction team to do a good job in the winter winter, cold, freezing, skidding, fire prevention, anti-gas poisoning "Five prevention" work, pay attention to the protection of on-site fire protection facilities, fire extinguishers used in a timely manner to the Department of material and mechanical filling;
4, strict control of the basket arch bridge steel arch installation of the welding quality and three-dimensional positioning of the review;
verification;
5, the closing work site materials are gathered, stacked neatly, to prevent Knocking accident;
6, the main work of the Ningbo safety standard site declaration and major sources of danger pin number.
Fifth, the project manager speech requirements:
1, the departments to do a good job before the acceptance of the preparatory work;
2, safety, now every point of violation of the phenomenon of the team to do a good job of education, the manager of the Department of strengthening supervision, safety must be done;
3, quality, guardrail is the face of a project, must do a good job of the appearance of the quality and line control, the lifting basket, the quality and the line of control, the quality and the line of control, the quality and the line of control, the lifting basket. Quality and line control, the basket arch bridge to pay attention to the welding quality, to strengthen this aspect of the test work;
4, management, material and mechanical department to strengthen the site turnover material inventory clearance work, engineering department of the whole line of a measurement and control, change the work to continue to move forward; laboratory to do the work ahead of time; safety and quality of the department should do a good job of ning pengtian test site declaration and the company's major hazardous source pin number Work.
Six, the project secretary speech requirements:
1, near the end of the unification of ideas, can not be paralyzed;
2, standardized construction, strict safety and quality, safety to do a good job in winter, "five preventive" work, the system must be done on-site construction management;
3, continue to do a good job of communicating with the local, deal with all aspects of the relationship;
4, sorting out the problems in the current work, self-examination and self-correction.