1. Inspection of the detailed structural dimensions of the structures, water closure, familiar with the function of each part. And solve the civil construction may exist in the operation of the equipment contradictory to the problem.
2. Check whether the performance of each single rest equipment to meet the design requirements.
3. Check the installation of each single equipment, and analyze and solve the existing problems one by one.
4. Check the operation of each single equipment, make a record, for the load linkage test machine and test run to prepare.
5. Through the clear water linkage test machine test sewage treatment equipment load state performance can meet the design process requirements, equipment installation is in line with the design requirements, as well as equipment selection and installation is compatible with the civil structures, to solve the problems that may exist for the sewage trial run ready.
Above on the sewage treatment equipment in the installation of which debugging before the introduction, whether there is a certain understanding. Through the debugging to solve the above problems that may exist, so that the performance of sewage treatment equipment and operating conditions with the characteristics of the civil structures in line with the sewage treatment equipment, so that the capacity of the sewage treatment equipment to meet the design requirements. In order to make the sewage treatment equipment operate normally. You can also find out what problems to pay attention to when installing sewage treatment equipment.