Summary refers to the social groups, business units and individuals to a certain stage of learning, work or its completion of the review and analysis, to draw lessons and some regularity of understanding of a written material, which can help us have to look for the law of learning and work, let's write a summary of it for themselves. How do we go to write a summary? The following is my collection of supervision work summary 4, I hope to be able to help you.
Supervision work summary Part 1October will end, the weather is getting cooler, in the supervision of the company's work has gone through a whole year moment. Review out of the university campus, into the community, into the work of this year, more smoothly completed from the freshman to the intern and then to a supervisor of the protagonist of the transformation. In the leadership of the training, seniors help, colleagues encouragement, this year I grew a lot; in their own exploration, learning, work, this year I gained a lot. I would like to take this opportunity to summarize the work of the year, carry forward the advantages and continue to make progress, and found that the error of timely correction, in order to continue to improve the work in the future, perfect.
First, a year's work
The supervision of the company's work this year, according to their own situation, can be divided into the following three phases: 1) auxiliary work stage
The first into the company, because it is not a graduate of communications-related professions, the knowledge of communications engineering is very poor, only engaged in a number of such as the design of the program checking, completion of the document review and to assist Shenyang Unicom in indoor distribution project materials, and to assist in the work of the company. The company's indoor distribution project material accounting and other auxiliary work, and did not immediately put into the project site.
It is also the work of this moment, so that I have a basic understanding of the technology related to communications engineering, and in the help of seniors on the nature of the supervision work, information, procedures, etc. must be aware of, and then also with the seniors to go to a few indoor distribution of the site, which is for the development of the work of the future to lay a good foundation.
2) First into the project site adaptation stage
After the New Year, was sent to the Jinzhou project department, into the Jinzhou City Unicom WCDMA network (Phase III) base station project site supervision work.
This time the work is hard, but also a lot of harvest. This moment is precisely because the work pressure, high intensity, brought to maximize their own realization of their own value of the opportunity. In the successful completion of this period of supervision of the project at the same time, improve the potential for business communication, growth of work experience, understanding of the relevant technology.
3) formally enter the protagonist stage
After the Spring Festival, continue to work in the project department in Jinzhou, and participated in the company's organization of the communication engineering supervision technology, management and other aspects of knowledge training, as well as the province of the communication engineering industry safety production training.
Along with this came the on-site supervision of the WCDMA network (Phase IV) base station project in Jinzhou City, the G network (Phase 17) base station project in Jinzhou City, the supporting transmission project, the cell coverage project in Jinzhou City, the indoor distribution project in Jinzhou City, and the EPON and WLAN projects. In addition to this, some auxiliary work was completed, such as image data collection and archiving of project-related materials. This is a great addition to the overall supervision work.
Through the continuous work in the project site, the continuous learning in the training, as well as the two complement each other, the theory links to the practice, a lot of harvest. This is not a short period of time is also basically adapted to the work of the supervision, to be able to life, daily work, the work of the project when the intensive arrangement of the work properly. Can be more proud to say that officially entered the communications engineering supervision of this protagonist.
Second, a year of learning
As mentioned earlier, the work itself is a continuous learning process, the company organized by the communications engineering supervision technology, management and other aspects of knowledge training, as well as the provincial communications engineering industry, production safety training also brings a good opportunity to learn.
Through the training organized by the company, a more systematic understanding of the work related to the knowledge system should be mastered, in the spare time through the network, related books, self-study some of the work of the common commonly used knowledge of communications, engineering specifications as well as engineering supervision of relevant laws and regulations.
Organizational management potential, comprehensive analysis potential, coordination potential and text expression potential is also an important potential as a good engineering supervision workers should have. Through the leadership of the help, communication with colleagues, coupled with the exercise of work, these have been greatly improved.
Third, the advantages and shortcomings
People expensive introspection, through the review of a year's work, some of their own performance, their own strengths and weaknesses are particularly clear. In their own work enthusiasm, learning attitude and overcome difficulties, etc., has always been worth promoting the advantages. Shortcomings, but also is to solve the problem of the following points: the technical level is still very limited, the work is not enough to pay attention to the details, to deal with complex work and work intensity of the larger stage seems to be very impatient, need to collaborate with colleagues to do not do a good enough job.
In the future work, strive to correct these deficiencies, and strive to be able to continue to learn to improve the technology, to reach the level of competent supervision work; to change the work of the problem of lack of detail, not in the details of the loss of points; to an adult should be steady, to deal with the work of the problem, calmly solve the problem; need to collaborate with each other colleagues work, listen to the leadership of the arrangements, and cooperate with colleagues with all their hearts. The first thing you need to do is to get your hands dirty.
Whether it is the potential for work, or for work-related technology, in this short year, from nothing to something, from weak to strong greatly improved. This year's work, a lot of harvest, in the next moment, still have to continue to learn, constantly improve. To create a higher value for the company with a heart, and strive to achieve greater results, in the work of correcting their own shortcomings in all aspects.
Finally, I would like to thank again, this year, all the leaders, all my colleagues care about me as a newcomer, help.
I was commissioned by the ZZ Automobile Sales Company, in accordance with the commissioning supervision contract signed by the two sides, I Juyu Supervision Company, ZZ Automobile Sales Company office building, maintenance workshop, warehouse project, the implementation of the construction phase of the supervision, has completed all the construction process of the supervision of the content of the supervision of the project is summarized as follows:
First, Project Overview
This project is XX FAW 4S store 1#, 2# showroom project, located in XX City, Xinhua Street South, Dongsheng Road West, An Bei Road, a local lot. The total construction area is 7200 m2, and the drawings are designed by Inner Mongolia Siwei Architectural Survey and Design Co. This project has 2 floors above ground and 3 floors locally. The foundation of this project is C10 concrete bedding, C20 reinforced concrete independent foundation, C15 one-step burr concrete foundation, C15 two-step burr concrete foundation. The elevation of the foundation is -1.850 m. The external wall of the first floor of the main body is 370 mm (without thermal insulation). The whole is cast-in-place, with 7-degree anti-seismic defense. The exterior wall is coated with cement mortar and rolled exterior wall paint. Elevation window is aluminum alloy window, the floor ground is cement calendaring, the top of the third floor to do waterproofing, do insulation.
This project is constructed by XX FAW 4S store, designed by Inner Mongolia Four-dimensional Architectural Design Institute, supervised by XX Juyu Engineering and Construction Supervision Co.
Second, the supervision of quality control
1, adhere to the quality first, people control core, adhere to the quality standards, the principle of prevention based on the current national standards for engineering quality inspection and evaluation and mandatory provisions of the requirements of the state and the quality management of the law, regulations and documents to carry out the supervision of business.
2, to participate in the drawing review: approval of the construction unit submitted by the construction organization design, construction program construction quality assurance measures, the key parts of the construction methods and techniques to give specific operators carefully briefed to ensure the quality of the project.
3, on all incoming materials, finished products, semi-finished components quality documents, factory certificates, material testing sheets for review, the site is equipped for checking the quality of the components of concrete, mortar 'are in the mortar pouring site run a random sampling production.
4, in the construction process, the main supervision and inspection of the construction process of personnel, construction machinery, equipment and materials, construction methods and technology operations on the discovery of unauthorized operation and not in accordance with the design requirements, construction drawings, construction specifications and quality standards of construction phenomenon, carried out a timely correction of the control of the important parts of the on-site construction process of the bystander supervision and inspection to ensure that the use of materials and process quality. The quality of the process, the construction process is prone to quality problems also carried out on-site tracking checks to ensure the quality of the project.
5, the inspection of process products and process handover inspection, hidden engineering inspection in the construction unit mutual inspection, self-test. Mutual inspection on the basis of the establishment of personnel also carried out a process handover inspection, hidden works are inspected by the supervisory staff and made a written endorsement before concealment, to prevent the occurrence of quality hazards and quality accidents.
6, plumbing, electric light are equipped with professional engineers on-site tracking guidance, all materials are done on-site sampling test, after the completion of the construction were done pressure test, water, electrical test run and other tests, so as to ensure that the water, heating, electricity, sanitation works of construction quality.
Third, the project started on March 20, 20xx.
To the completion of November 15, 20xx in the construction of all parties to work closely together, the entire construction process of all aspects of strict control, careful organization, careful construction of the smooth quality and quantity of the completion of the entire project's construction tasks.
Fourth, the evaluation of the quality of the project
According to the current national engineering quality inspection and assessment standards and mandatory provisions of the requirements of the office building, maintenance workshops, warehouses, foundation, the main structure of the safe and reliable. Floor works, roofing works, decorative works, doors and windows and other sub-items are all qualified.
Supervision work summary Part 320xx year is coming to an end, looking back on the work of 20xx year, there are fruitful joy, there are with colleagues to collaborate with the hard work of the attack, there are also encountered difficulties when the melancholy, time flies, unconsciously, full of hope that the 20xx year is coming, is now on the important work of the year is summarized as follows:
A, Individual annual work content
In this year's time, I was mainly involved in the Yantai Port Bonded Port Zone, a phase of the sealing project, the Yantai City underground pipeline census, the Yantai Port three protruding dyke yard restoration project, the comprehensive building displacement observation, as well as the company's surveying work on a number of projects.
Second, the job duties fulfillment
In this year's work, I still hold the attitude of learning while working on the work, summarize the process of each job and the main points, to find out if you don't understand the problem, and timely access to the norms and leadership colleagues to ask for advice, and little by little to accumulate work experience. In terms of project quality, we strictly supervise according to the supervision specification, project drawings and Supervision Rules. When participating in the bonded port area sealing project, I spent most of my time at the site, the project seems simple, but the site range is large, and many points are under construction at the same time, so I have to grasp the key points of supervision in order to reduce the workload and at the same time improve the efficiency and effectiveness of the work. If you find yourself unable to solve the problem of timely reporting to the project leader and consult the relevant norms, in solving the problem at the same time, but also to fill their own knowledge in this area of vacancies, the next time you encounter a similar situation can be solved independently. For the parts that need to stand by and make a good record of standing by, the hidden works to be accepted in strict accordance with the acceptance specification for acceptance, if the acceptance is not qualified, it is strictly prohibited to carry out the construction of the next process. Check and confirm the quality documents of original certificates and test reports of incoming materials and equipment, and carry out witness sampling and parallel testing of reinforcement bars and interlocking blocks. For projects with cross work, coordinate the construction sequence of each construction unit on site and strive to achieve the best. At the end of each month, the construction of the site and the construction plan to check, if the progress of backward timely request the construction unit to take measures to speed up the construction under the premise of quality assurance.
Engineering data:
Every day according to the site situation write a good supervision diary, and will be the day of the side record and other information to organize the archives, and urge the construction unit to report the corresponding engineering data. Regularly witness sampling, parallel testing and other information is organized and filed, and will be a good account of the various, and strive to the end of the project information is also ready to file.
Three, work experience feelings and shortcomings
Through this year's supervision, I think as a supervisor only to do integrity, self-discipline, integration into the team, respect for others, work seriously and responsibly will win the respect of others. In the site I came into contact with a lot of new things, in the old colleague's careful guidance, help I learned a lot of new theoretical knowledge and practical experience, broaden my knowledge.
This year's work I gained a lot, but there are also many shortcomings, work experience is not enough to face the intensity of the work is not meticulous, not enough patience, these shortcomings also lead to their own work there are a lot of flaws. In the future work I will study hard, constantly summarize experience, learn lessons, correct their own shortcomings, and strive to do to avoid the shortcomings.
Four, next year's personal career development and the company's views
engaged in the supervision of the work, know more is too little, can never be satisfied with the present, so I next year, I still have to ask more, learn more, more to do, in accordance with the needs of the work of the gradual and in-depth study of the various professional knowledge. Work and life to comply with the company's management system, strengthen the team consciousness training, further integration into our collective, and the use of spare time to learn more specifications to see more relevant papers to improve their business level. I also hope that the company to organize more training for our new employees, so that we can better adapt to the work, so that we can do more for the company to do some things.
Supervisory work summary Part 4In 20xx is about to pass, I made the following summary of my bureau's work this year:
First, strengthen the political and ideological learning, and comprehensively promote the construction of the party in the organ
(a) focus on the ideological and political construction, in-depth development of centralized education activities. I personally personally participate in the centralized learning and teaching of every learning and activities, delayed by business trips, back to consciously make up for the requirements, so that the study, work, two, two promotion. In order to find accurate and find the actual bureau, especially the leadership team of the outstanding problems, widely solicit opinions and suggestions from all sides, and in the heart-to-heart exchanges, carefully prepared on the basis of high-quality held a democratic life of the team to find out the existence of the problem, analyze the reasons for the formulation of corrective measures, and strict implementation, and received obvious results.
(2) the implementation of democratic centralism, strengthen the leadership team building. In the work, the implementation of democratic centralism, and strive to create a strong democratic atmosphere within the party, the implementation of democratic management, democratic decision-making, democratic supervision; widely listen to all aspects of the views, do not engage in patriarchal, one-word, and do not engage in backroom operations; in the event of a problem is to sit down with the members of the team more exchanges, diligent communication, and strive to reach *** knowledge, the formation of work synergy; major issues such as: the use of large amounts of funds, the cadre selection and appointment, personnel changes and so on. Appointment, personnel changes, etc. are collectively studied by the team to decide, never engage in temporary motion. At present, the leadership team is united and coordinated, we want to think together, to make, and effectively play the role of the battlefield and the core of leadership.
(C) to strengthen self-discipline, take the lead in the implementation of clean building responsibility. First, take the lead to do a good job of self-discipline, set up a solid ideological embankment, consciously resist the erosion of all kinds of corrupt ideas. I myself often check their own behavior, control themselves, control their families, control the staff around them, truly "indifferent to fame and fortune, selfless dedication", to maintain their own correct life goals and excellent personality and moral character, so that some people know that no one knows the same, some people tube no one tube the same, there is no supervision supervision of the same, inside and outside the same, the same as in the table. Inside and outside the same, the same as the table; Secondly, to grasp the integrity of the construction of the accountability system, the anti-corruption task decomposition and refinement of the implementation of anti-corruption to the relevant sections and departments, usually strengthen supervision and assessment. Last year, the bureau did not occur a disciplinary case.
Second, according to the law to fulfill their duties, the full completion of the objectives and tasks
(a) to carry out special environmental protection actions to rectify the illegal discharge of enterprises. First, seriously clean up construction projects that do not meet environmental standards; second, the environmental impact assessment system and the "three simultaneous" system to clean up the implementation of the third is to clean up and rectify not according to the national deadline for the elimination of backward production capacity, processes and products, as well as the resurgence of the "fifteen small ", "new five small" enterprises, *** outlawed the closure of small coking, small paper and other heavy pollution of 54 small enterprises; four is to increase the management of radioactive sources, medical hazardous waste, *** inventory of 201 radioactive sources, the management of irregularities in the unit ordered to rectify; five is with the XX door jointly investigated and dealt with Impact on residents' lives at night construction noise, a strong stop to all kinds of noise nuisance phenomenon; six is the key sewage enterprises to strengthen supervision, to prevent illegal discharge of enterprises; seven is to carry out environmental protection of the cement industry special rectification action, ordered 14 cement factories in the area of Lieshan shut down and rectification.
(2) the implementation of comprehensive environmental remediation, the city examination work has made new progress. I made a detailed urban examination work objectives, implementation measures and implementation schedule, more than 20 assessment indicators, especially for the loss of more points on the indicators, coordination of multi-departmental **** with the study, group efforts, to develop practical countermeasures, last year, the city's urban environment comprehensive rectification of the quantitative assessment of the province's fourth place.
(C) pay close attention to the implementation of the project, environmental protection, "Tenth Five-Year Plan" is progressing well. The city included in the water pollution prevention and control program 12 projects, with a total investment of 452 million yuan. At present, the project completed investment rate of 55.33%, the project start rate of 100%, among the forefront of the province.
(D) to strengthen environmental management, prevention and control of industrial pollution. First, to control new sources of pollution from the source; second is to actively cooperate with the relevant departments to grasp the city's environmental protection infrastructure construction, mainly the city sewage treatment plant network project, water reuse project, Suixi County sewage treatment plant and the city of hazardous waste disposal center and other projects of the project and the implementation of funds. At present, the water reuse project of municipal wastewater treatment plant has implemented funds of 35 million yuan, the municipal hazardous waste disposal center has implemented funds of 2.5 million yuan, and the Suixi County wastewater treatment plant has implemented 1.2 million yuan of provincial environmental protection special funds, and the comprehensive utilization of fly ash project of Huaibei Lingyun Electric Power Industry Corporation has been included in the national "Resource Conservation and Environmental Protection Major Demonstration Project". ", the use of state bonds 46.6 million yuan; Third, the implementation of cleaner production, a number of key industrial enterprises to grasp the technological transformation and adjustment of industrial structure, and further reduce the industrial pollution load.
(E) to strengthen ecological protection and promote the construction of eco-city. The city has carried out research on topics related to the construction of ecological city, *** listed 20 topics, involving 18 departments and units. At present, the draft of "Huaibei ecological city construction master plan" has been completed.
(F) strengthen environmental supervision, grasp the sewage charges. Throughout the year, the implementation of various types of on-site supervision of more than 1,700 households, on the illegal emissions unit, are punished according to law. Annual collection of sewage charges 10.5 million yuan, the city government issued 8 million yuan sewage charges task.
(VII) properly handle pollution complaints, to maintain social stability. I participated in the "wind hotline" 10 times, the contractor 67 cases, the completion rate of 100%; received letters, calls more than 550 times; received more than 170 visits to more than 600 people; acceptance of pollution disputes, 39 cases, all closed. In addition, I received this year, the city people's Congress suggested 5, all completed.
(H) to improve service capacity, to attract investment. Increase run the provincial environmental protection bureau, the State Environmental Protection Administration efforts to ensure that the city's major economic construction projects in a timely manner. After my bureau's active efforts, 500,000 tons of methanol and coal coking electricity comprehensive utilization of a project successfully passed the environmental protection approval; Pingshan Power Plant preliminary environmental approval is underway. At present, I attract investment in the actual funds in place equivalent to 14.5 million yuan, to complete the annual task of 130.30%.
Third, there are major problems
First, focus on business work, business work is a hard target, hard task, grasp tight, strong, political ideological work is not enough attention, grasp light, weak;
Second, failed to properly deal with the contradiction between work and study, work up and down the strength of the time spent on learning is not enough to work on the study of the busy time, some slack; < /p>
Third, the work of the Bureau of Investment Promotion in the field of environmental protection and approval; Pingshan power plant in the early stages of environmental protection approval.
Third is to deal with transactional work more time, in-depth grass-roots research, in-depth understanding of the situation of the masses less, listen to reports, see more documents, their own personal touch less;
Fourth is the administrative means of law enforcement is not hard enough. Environmental protection laws and regulations, some provisions have not been put into practice, environmental protection and administrative law enforcement, there are still laws, law enforcement, law enforcement, difficult to investigate, the quality of law enforcement personnel is not high, administrative law enforcement behavior is not standardized and "high cost of compliance, the cost of violation of the law is low," and other phenomena;
Fifth, environmental protection of hot spots and difficult problems have not been Fundamental solution. At present, environmental issues have become a social hotspot, environmental pollution caused by the dispute has gradually become a social instability. Although I attached great importance to environmental pollution complaints, proper mediation, eliminating some of the hidden dangers caused by social instability, but such as: restaurant fume pollution, coal-fired boiler smoke pollution and noise pollution is still a hot spot of public complaints.
Hotel smoke pollution caused by the phenomenon of nuisance to the people of the main reasons are: First, urban planning is unreasonable, residential buildings on both sides of the street are planned for commercial and residential buildings, according to the relevant legal provisions of the commercial and residential buildings can be operated within the catering industry, environmental protection departments can not prohibit commercial and residential buildings to open the restaurant; Second, the business sector does not need to be issued before the issuance of business license through the environmental protection department for approval, the environmental protection department can only be involved in the management of business; Third, there is a lack of very mature domestic oil pollution, the environmental protection department to intervene in management. Third, the lack of very mature domestic fume control technology.
Caused by a small boiler smoke pollution is mainly due to: the city's bathing industry to the use of coal-fired small boilers are mainly used in the treatment of pollution of dust removal facilities, the cost of high, governance value is not very high; and oil-fired boilers and electric boilers due to the high cost of running the majority of homeowners to shy away from.
Six is a small paper and other "15 small" enterprise pollution rebound phenomenon still exists. Since last year, the city of "fifteen small" enterprises were resolutely banned and shut down, multi-departmental joint site inspections, the vast majority of enterprises to cut off the power supply, dismantle the production facilities and clean up the production site, however, Suixi County, there are still some enterprises production facilities have not been dismantled, the site cleanup is not complete, resume production without authorization! However, there are still some enterprises in Suixi County that have not dismantled their production facilities, have not cleaned up their sites thoroughly, and have resumed production without authorization. The main reason is: small paper and other "fifteen small" enterprises with small investment, quick results, has a better economic efficiency, and most of them are in remote villages, environmental protection department supervision is weak.
I hope that the departments in the new year, hard work, better service for the people.