Environmental acceptance application report sample, the following to give you a detailed introduction:

Environmental acceptance application report can be divided into three parts to describe, first you can describe the environmental project overview, the second can describe what the content of the test, and the third can describe the environmental acceptance criteria.

Environmental Acceptance Application Report Model Article 1

Lin'an City Environmental Protection Bureau:

Hangzhou Lin'an ___ Co., Ltd., 200_ by the environmental protection approval on the ___, 200_ put into trial production on the ___ so far, the approval number: Lin environmental protection [200_]__ number or the registration form approval [200_] __ No.; Project Name: annual production of ____ how many tons or (pieces); Address: ----------; Contact Person: -----------; Contact Tel: ------------. According to the EIA approval I have commissioned ____ environmental protection company for planning and design, and in accordance with the design requirements to carry out the following environmental protection management work:

1, wastewater: rainwater and sewage diversion system is implemented in the plant, rainwater is connected to the outside of the plant rainwater ditch (pipeline) discharge; domestic wastewater, "such as no production of wastewater, (canteen wastewater through the grated oil pool treatment into the buried wastewater treatment device) other domestic Wastewater by three compartments buried wastewater treatment device after treatment to meet the discharge standards" and production wastewater by ____ method after treatment to meet the discharge standards. The wastewater of enterprises in the park is incorporated into the wastewater network of the park together with domestic wastewater after pre-treatment and reaching the standard of pipe connection (with a copy of the agreement on wastewater connection).

2, waste gas: in ___ process generated by the ___ waste gas collected by the fan, through the ___ adsorption purification device treatment, through the ___ meter-high chimney emissions; boiler exhaust gas by the water film dust collector treatment, through the ___ meter-high chimney emissions, dust removal of wastewater through the three-format precipitation tank with precipitation and recycling of waste water is not externally discharged.

3, noise: machinery and equipment have been installed anti-vibration acoustic pads, all the doors and windows in the workshop use acoustic glass sound insulation, production and processing of sealed windows and doors to ensure that the noise can meet the emission standards.

4, solid waste: (1), industrial waste: after classification and collection of comprehensive utilization; (2), domestic garbage: after unified collection by the sanitation department for regular collection and disposal.

4, dust: the use of ____ dust removal facilities to meet the standard discharge after collection and treatment.

5, cafeteria fumes: has installed a fume purifier, the fume exhaust generated by the purifier after treatment and discharge at high altitude (or this project does not have a cafeteria).

Now all in place, and hereby apply for your bureau of the company's environmental protection facilities supporting the construction project to organize the completion of acceptance monitoring. (With environmental assessment materials and approval documents, park enterprises need to provide sewage natatorium agreement) hereby report!

Hangzhou Lin'an ___ Co., Ltd. (seal)

Two 00_year___Month___

Note: 1, the monitoring brigade contact number: 61070325 monitoring station contact number: 63700986

6372752163721509

2, this report in duplicate, a copy of the monitoring brigade, a copy to the monitoring station




Environmental Protection Acceptance Application Report Part 2

Petition for Environmental Protection Acceptance of ___ Municipal Domestic Waste Incineration Power Generation Project

__ Provincial Environmental Protection Office:

With the kind care and strong support of the leaders of the provincial, municipal, and district levels, Shanwei Energy Co. Ltd. is responsible for the off-site construction of ___ City, domestic waste incineration power generation project is progressing well. With the consent of the provincial Environmental Protection Department Inspection Center, __ Municipal Environmental Protection Bureau in April 2012 approved the trial operation. On May 28, 2012, the first furnace and one machine were launched for trial operation. The project was generally constructed in accordance with the requirements of the EIA approval and the EIA report. After half a year of debugging and remediation has basically with acceptance conditions. On this occasion, I would like to apply to your office for acceptance and report the main situation as follows.

I, project background

The project was approved by the Hebei Provincial Development and Reform Commission Ji Ji Ji investment 20__1074, in ___ City, Lubei District, ___ City, cylinder kiln Thermal Power Plant in the expansion of the site reserved for the construction of talk about the meal of domestic waste incineration project, the project in the preliminary preparations for the construction of construction process, * * * for the national bond funds of 48 million yuan, including the central budget and local budgets Special funds cumulative funds in place 85 million yuan: the project in December 2006, complete the construction plan design, in the cylinder kiln thermal power plant started construction a year and a half later, due to changes in the external economic situation, ___ city revamped the master plan, the original construction site planning for the wetland reserve, the project stops construction: in April 2009, according to the requirements of the ___ city master plan, the project is off-site to restart. The total scale changed to 1500 tons of garbage per day, in accordance with the spirit of the April 20, 2009 ___ municipal government special meeting minutes, ___ Xinfeng Cogeneration Group Co., Ltd. is responsible for the full acceptance of ___ Jiecheng Energy Co., Ltd. construction of the garbage incineration project.

Second, the project overview

The project has not been and ___ City ___ District Jianzigu landfill northeast of the main treatment of ___ City, Lunan District, Lubei District, Kaiping District, Fengan District, Caofeidian Industrial Zone, Fengan Industrial Zone, Nanbao Development Zone and other territories within the domestic garbage, the scale of construction for the daily treatment of domestic garbage 1,500 tons, the setting of three 75t / h circulating fluidized bed waste incineration Three 75t/h circulating fluidized bed waste incineration boiler production lines are set up, each with a daily waste treatment capacity of 500 tons and supporting (1_12+1_25) MW turbine generator sets, with a total investment of RMB 440 million yuan, of which more than RMB 80 million yuan is invested in environmental protection. Accounting for 12.5% of the total investment .

Three, the completion of environmental facilities

___Shantou Energy Co., Ltd. is responsible for the construction of the waste incineration project, are based on the feasibility study report and preliminary design approval, in strict accordance with the EIA report and EIA approval requirements for the construction of the project, and the current plant environmental protection facilities have been completed in full, which is briefly described below.

(A) unloading hall

The garbage unloading platform is indoor arrangement, in the main plant 8.00mm layer, the unloading platform is equipped with a special import and export of garbage trucks, 10 unloading positions, the platform width of 24 m. It can meet the maximum garbage transfer vehicles driving, turning around and unloading without affecting the operation of other vehicles, the garbage unloading platform meets the requirement of rinsing seepage, the platform is equipped with electric roller shutter door above the import and export and the platform is equipped with electric roller shutter door above the import and export and the platform is equipped with electric roller shutter door above the import and export. The platform is equipped with electric roller shutter door and air curtain wall above the entrance and exit to prevent the spread of odor.

(2)Garbage storage tank

The total effective volume of the garbage storage tank is 17,955m, which can store more than 7,000 tons of garbage and meet the garbage incineration quantity of 5-7 days: the concrete panel of the garbage storage pit and the garbage leachate collection pool adopt the impermeability measures to prevent the leachate leaking out and to avoid the infiltration of the groundwater

The garbage storage tank is equipped with the suction air opening of the primary fan of the incinerator and the secondary fan to maintain the garbage storage tank and to avoid the infiltration of ground water. Fan suction port to maintain the garbage storage tank to maintain negative pressure. In the garbage storage tank thatched with accident fan, in the case of the whole plant shut down furnace maintenance or sudden accidents, the garbage storage tank gas can be processed by the top of the plant activated carbon adsorption device discharged into the atmosphere, to avoid the escape of odor.

(C) slag silo

Slag silo effective volume of 1225m, storage of 7 days of slag. Fitted with a bag filter and a 15-meter-high smoke pipe.

(D)Lime storage bin

Lime storage bin is set up according to the lime consumption of 3 flue gas purification lines and 3 days' stock. The storage bin V=130m? It is equipped with bag filter and 15m high smoke pipe.

(V) Activated carbon storage silo

Set up three activated carbon storage silos, one for each line, according to 5 days of activated carbon consumption is considered to be set up, with a volume of 5m? The exhaust port is connected to the bag filter of the lime silo.

(F) Fly ash storage bin

Fly ash is considered to be two days' storage capacity for three lines, and two storage bins with a volume of 800m?are set up. Equipped with bag filter and 29-meter high smoke pipe.

(7)Garbage leachate treatment system

The garbage leachate is treated by the "dynamic anaerobic + membrane bioreactor (MRB) + first-stage sodium filtration (NF) + first-stage low-pressure reverse osmosis (RO)" process.

Now built 300 tons / day leachate leachate treatment plant, its treatment effect reaches (GB18918-2002) A standard, 70% of the treated water as greening, spraying roads and water towers with water, the remaining 30% of the concentrate sprayed back to the boiler incineration. The domestic sewage is treated in the leachate treatment plant through septic tank and domestic waste water tank.

(H) waste incineration system

The process adopts circulating fluidized bed waste incineration boiler, the furnace according to the "three high" principle of combustion, that is, high temperature, high perturbation degree, high residence time. Furnace combustion is not less than

850 ℃ flue gas residence time of more than 3.5 seconds to inhibit and reduce the flue gas in the two _ British, CO content, under the bed of slag in the slag discharge, and the rest of the furnace back to use.

(IX) pharyngeal gas purification system

The incinerator flue gas treatment adopts "combustion control + semi-dry scrubbing + activated carbon adsorption + dust bag" of the waste gas treatment process, the use of alkaline semi-dry reactant lime milk as an adsorbent to absorb the flue gas in the acidic components; at the same time the use of powdered activated carbon and the porous and toxic components such as heavy metals. Heavy metals and other toxic components down to within the standard range, captured by the bag filter, dust removal rate of 99.5%, while the use of blended limestone desulfurization rate of more than 85%. The on-line monitoring of the smokestack has been networked with the Municipal Environmental Protection Bureau to realize real-time monitoring.

(J) water supply and drainage system

Chinese water is used according to the design of ___ Fengnan District, Chengnan sewage treatment plant water, water pipeline, sewage pipeline according to the requirements of the environmental assessment of the same road paved to the Chengnan sewage treatment plant.

(XI) Solid Waste Disposal

Risky solid waste is fly ash, general solid waste is slag, domestic garbage.

(1) hazardous solid waste:

Fly ash: incinerator outlet flue gas dedusting to collect dust and ash by pneumatic method sent to the ash silo by the ___ city of Furning XuShanKou hazardous waste treatment station with a closed tanker truck transported away.

(2) General solid waste:

Slag: solid waste slag discharged from the furnace bed after the combustion of garbage and coal in the incinerator is cooled by the slag chiller and then transported by the slag conveyor chain hopper to the slag storage, and then sold to Changzhou City Baojiang Furnace Material Processing Co.

Life wastes: collected and sent to the incinerator for incineration.

(XII) Noise control

Our company reduces the pollution caused by noise to the environment by adopting measures such as soundproofing, adding silencers, foundation damping, flexible connection of pipelines and so on for the sources of noise pollution in the design and construction.

(xiii)Greening of the plant

At present, our company's actual investment in greening is RMB 200,000 yuan, and the greening area is completed to be about 50_, and after the project is put into operation, our company will further improve the ecological environment of the plant through greening.

Special application to the ___ Provincial Environmental Protection Office for project environmental protection acceptance.

Please Approve

Shanwei Energy Group Company

May 16, 20___

Environmental Protection Acceptance Application Report Sample Article 3

Petition for Environmental Protection Acceptance of ___ Municipal Domestic Waste Incineration and Power Generation Project

___Provincial Environmental Protection Department:

Under the kind care and strong support of the leaders at provincial, municipal and district levels, the ___ City Life Waste Incineration Power Generation Project, which is responsible for the off-site construction by Jiecheng Energy Company Limited, has been progressing smoothly. By the provincial environmental protection department supervision center agreed, ___ city environmental protection bureau in April 2012 approved trial operation. On May 28, 2012, the first furnace and one machine were launched for trial operation. The project was generally constructed in accordance with the requirements of the EIA approval and the EIA report. After half a year of debugging and remediation has basically with acceptance conditions. On this occasion, I would like to apply to your office for acceptance and report the main situation as follows.

I, project background

The project was approved by the Hebei Provincial Development and Reform Commission Ji Ji Ji investment 20__1074, in ___ City, Lubei District, ___ City, cylinder kiln Thermal Power Plant in the expansion of the site reserved for the construction of talk about the meal of domestic waste incineration project, the project in the preliminary preparations for the construction of construction process, * * * for the national bond funds of 48 million yuan, including the central budget and local budgets Special funds cumulative funds in place 85 million yuan: the project in December 2006, complete the construction plan design, in the cylinder kiln thermal power plant started construction a year and a half later, due to changes in the external economic situation, ___ city revamped the master plan, the original construction site planning for the wetland reserve, the project stops construction: in April 2009, according to the requirements of the ___ city master plan, the project is off-site to restart. The total scale changed to 1500 tons of garbage per day, in accordance with the spirit of the April 20, 2009 ___ municipal government special meeting minutes, ___ Xinfeng Cogeneration Group Co., Ltd. is responsible for the full acceptance of ___ Jiecheng Energy Co., Ltd. construction of the garbage incineration project.

Second, the project overview

The project has not been and ___ City ___ District Jianzigu landfill northeast of the main treatment of ___ City, Lunan District, Lubei District, Kaiping District, Fengan District, Caofeidian Industrial Zone, Fengan Industrial Zone, Nanbao Development Zone and other territories within the domestic garbage, the scale of construction for the daily treatment of domestic garbage 1,500 tons, the setting of three 75t / h circulating fluidized bed waste incineration Three 75t/h circulating fluidized bed waste incineration boiler production lines are set up, each with a daily waste treatment capacity of 500 tons and supporting (1_12+1_25) MW turbine generator sets, with a total investment of RMB 440 million yuan, of which the environmental protection investment is more than RMB 80 million yuan. Accounting for 12.5% of the total investment .

Three, the completion of environmental facilities

__ Jiecheng Energy Co., Ltd. is responsible for the construction of the waste incineration project, are based on the feasibility study report and preliminary design approval, in strict accordance with the EIA report and EIA approval requirements for the construction of the project, and the current plant environmental protection facilities have been fully completed, is briefly described below.

(A) unloading hall

The garbage unloading platform is indoor arrangement, in the main plant 8.00mm layer, the unloading platform is equipped with a special import and export of garbage trucks, 10 unloading positions, the platform width of 24 m. It can meet the maximum garbage transfer vehicles driving, turning around and unloading without affecting the operation of other vehicles, the garbage unloading platform meets the requirement of rinsing seepage, the platform is equipped with electric roller shutter door above the import and export and the platform is equipped with electric roller shutter door above the import and export and the platform is equipped with electric roller shutter door above the import and export. The platform is equipped with electric roller shutter door and air curtain wall above the entrance and exit to prevent the spread of odor.

(2)Garbage storage tank

The total effective volume of the garbage storage tank is 17,955m, which can store more than 7,000 tons of garbage and meet the garbage incineration quantity of 5-7 days: the concrete panels of the garbage storage pit and the garbage leachate collection pool adopt the seepage prevention measures to prevent the leachate leaking out and to avoid the seepage of the groundwater

The garbage storage tank is equipped with the suction air opening of the primary fan of the incinerator and the secondary fan to keep the garbage in a good condition and to maintain the quality of the waste. Fan suction port to maintain the garbage storage tank to maintain negative pressure. In the garbage storage tank thatched with accident fan, in the case of the whole plant shut down furnace maintenance or sudden accidents, the garbage storage tank gas can be treated by the top of the plant activated carbon adsorption device discharged into the atmosphere, to avoid the escape of odor.

(C) slag silo

Slag silo effective volume of 1225m, storage of 7 days of slag. It is equipped with a bag filter

and a 15-meter-high flue pipe.

(D)Lime storage warehouse

Lime storage warehouse is set up according to the lime consumption of 3 flue gas purification lines and 3 days' stock. The storage bin V=130m? It is equipped with bag filter and 15m high smoke pipe.

(V) Activated carbon storage silo

Set up three activated carbon storage silos, one for each line, according to 5 days of activated carbon consumption is considered to be set up, with a volume of 5m? The exhaust port is connected to the bag filter of the lime silo.

(F) Fly ash storage bins

Fly ash is considered to be the storage capacity of three lines for two days, and two storage bins with a volume of 800m?are set up. Equipped with bag filter and 29-meter high smoke pipe.

(7)Garbage leachate treatment system

The garbage leachate is treated by the "dynamic anaerobic + membrane bioreactor (MRB) + first-stage sodium filtration (NF) + first-stage low-pressure reverse osmosis (RO)" process.

Now built 300 tons / day leachate leachate treatment plant, its treatment effect reaches (GB18918-2002) A standard, 70% of the treated water as greening, spraying roads and water towers with water, the remaining 30% of the concentrate sprayed back to the boiler incineration. The domestic sewage is treated in the leachate treatment plant through septic tank and domestic waste water tank.

(H) waste incineration system

The process adopts circulating fluidized bed waste incineration boiler, the furnace according to the "three high" principle of combustion, that is, high temperature, high perturbation degree, high residence time. Furnace combustion is not less than

850 ℃ flue gas residence time of more than 3.5 seconds to inhibit and reduce the flue gas in the two _ British, CO content, under the bed of slag in the slag discharge, and the rest of the furnace back to use.

(IX) pharyngeal gas purification system

The incinerator flue gas treatment adopts "combustion control + semi-dry scrubbing + activated carbon adsorption + dust bag" of the waste gas treatment process, the use of alkaline semi-dry reactant lime milk as an adsorbent to absorb the flue gas in the acidic components; at the same time the use of powdered activated carbon and the porous and toxic components such as heavy metals. Heavy metals and other toxic components down to within the standard range, captured by the bag filter, dust removal rate of 99.5%, while the use of blended limestone desulfurization rate of more than 85%. The on-line monitoring of the smokestack has been networked with the Municipal Environmental Protection Bureau to realize real-time monitoring.

(J) water supply and drainage system

Chinese water is used according to the design of ___ Fengnan District, Chengnan sewage treatment plant water, water pipeline, sewage pipeline according to the requirements of the EIA with the same road paved to the Chengnan sewage treatment plant.

(XI) Solid Waste Disposal

Risky solid waste is fly ash, general solid waste is slag, domestic garbage.

(1) hazardous solid waste:

Fly ash: incinerator outlet flue gas dedusting to collect dust and ash by pneumatic method sent to the ash silo by the ___ city of Furning XuShanKou hazardous waste treatment station with a closed tanker truck transported away.

(2) General solid waste:

Slag: solid waste slag discharged from the furnace bed after the combustion of garbage and coal in the incinerator is cooled by the slag chiller and then transported by the slag conveyor chain hopper to the slag storage, and then sold to Changzhou City Baojiang Furnace Material Processing Co.

Life wastes: collected and sent to the incinerator for incineration.

(XII) Noise control

Our company reduces the pollution caused by noise to the environment by adopting measures such as soundproofing, adding silencers, foundation damping, flexible connection of pipelines and so on for the sources of noise pollution in the design and construction.

(xiii)Greening of the plant

At present, our company's actual investment in greening is RMB 200,000 yuan, and the greening area is completed to be about 50_, and after the project is put into operation, our company will further improve the ecological environment of the plant through greening.

Special application to the ___ Provincial Environmental Protection Office for project environmental protection acceptance.

Please approve