General industrial solid waste disposal in Shandong Province whether subsidized Shandong

In the context of supply-side reform, in 2020, the state introduced a number of solid waste disposal-related policies aimed at regulating the healthy development of the industry, improving incentives, regulatory mechanisms, and creating a good environment, and thus optimize the industrial structure, strengthen technological innovation, support and promote industrial transformation and upgrading, and promote the development of the solid waste disposal industry, high-end, intelligent and green.

Serial number

Issue time

Name of policies and regulations

Main content

1

March 25, 2020

Guiding Opinions on Promoting Healthy and Orderly Development of Sand and Gravel Industry

Support the comprehensive utilization of waste rock tailings. In line with the safety, ecological and environmental protection requirements, to encourage and support the comprehensive utilization of waste rock, slag and tailings and other sand and gravel resources, to achieve "waste to treasure". Encourage the use of solid waste resources to manufacture recycled sand and gravel. Encourage the use of construction and demolition waste and other solid waste resources to produce sand and gravel alternative materials.

2

April 3, 2020

"on the orderly promotion of new waste incineration power generation project construction of the notice on matters related to (draft)"

2020 after January 20, grid-connected power generation of domestic waste incineration power generation (including biogas power generation) project is a new project, the state, in accordance with the principle of revenue to support through the Renewable Energy Development Fund to continue to support. Development Fund to continue to support. At the end of December each year, the summary of the region's next year to apply for subsidies to fund the new project subsidy needs and reported to the National Development and Reform Commission, the project should be completed in accordance with the relevant provisions of the State for approval, approval or filing, and included in the national major projects construction library three-year rolling plan, all units can be completed within the year grid power generation.

3

April 29, 2020

"Chinese People's Republic of China *** and the State Law on Prevention and Control of Environmental Pollution by Solid Wastes"

The new Solid Waste Law makes it clear that the prevention and control of environmental pollution by solid wastes strengthens the supervisory and management responsibilities of the government and its relevant departments and improves the system of prevention and control of pollution of the environment by industrial solid wastes, domestic garbage, hazardous wastes, construction wastes, agricultural solid wastes, etc., and improves the safeguard mechanism. Prevention and control system, a sound protection mechanism, strict legal responsibility.

4

April 30, 2020

The Implementation Plan for Capacity Building of Medical Waste Centralized Disposal Facilities

Strive to realize as soon as possible within 1-2 years that large cities and mega-cities will have sufficient emergency treatment capacity; each city above the prefectural level will build at least one medical waste centralized disposal facility that meets the operational requirements; each county (city) will build a medical waste collection, transfer and disposal system. Medical waste collection, transportation and disposal system, to achieve the county level above the full collection of medical waste, the full treatment, and gradually covered to the establishment of towns, and strive for standardized disposal of medical waste in rural areas. Conditional areas to use the existing hazardous waste incinerators, household waste incinerators, cement kilns to make up for the short board of medical waste emergency disposal capacity.

5

June 4, 2020

Hazardous Waste Environmental Permit Management Measures (Draft Revision) (Draft for Comment)

Units engaged in hazardous waste collection, storage, utilization, disposal of business activities should be in accordance with the regulations to receive the hazardous waste environmental permits and other industry sectoral permits, the Measures to enhance the hazardous waste environmental permit Approval of the issuance of hazardous waste environmental permits and the collection, storage, utilization, disposal of hazardous wastes in the process of environmental pollution prevention and supervision and management of business activities.

6

July 3, 2020

"Plan for Collaborative Transformation and Upgrading of Industrial Resources Comprehensive Utilization Industry in Beijing, Tianjin, Hebei and the Surrounding Regions (2020-2022)

By 2022, the annual amount of industrial solid waste comprehensively utilized in the region will be 800 million tons, and the amount of major renewable resources recycled will reach 150 million tons, with the total output value of the industry exceeding 900 billion yuan, form 30 distinctive industrial clusters, build 50 industrial innovation centers, and cultivate 100 innovative backbone enterprises. The regional synergy mechanism is more perfect, basically forming a new pattern of resource recycling industry development of bulk concentration, green high value, synergistic and efficient.

According to the target requirements, it is proposed to synergistically utilize industrial solid waste to prepare sand and gravel aggregate, promote the synergistic utilization of bulk metallurgy and coal power solid waste, grow the scale of industrial solid waste high-value utilization industry, improve the level of utilization of scrap metal, promote the efficient utilization of waste polymer materials, accelerate the recycling of decommissioned power batteries, promote the development of integrated utilization of resources, promote the synergistic treatment of urban production systems, build a green Xiongan, and promote the development of a green Xiongan. 10 major tasks, such as the construction of green Xiongan, innovation and synergistic development.

7

July 18, 2020

Implementing Rules for the Measures for the Administration of the Recycling of End-of-Life Motor Vehicles

The State encourages the development of the recycling and dismantling industry of end-of-life motor vehicles in a market-oriented, specialized and intensive manner, promotes the improvement of the recycling system of end-of-life motor vehicles, and improves the efficiency of recycling and the level of service. State recycling and dismantling enterprises to implement qualification system. Without qualification, any unit or individual shall not engage in end-of-life motor vehicle recycling and dismantling activities.

8

July 31, 2020

The Implementation Plan for Mending Shortcomings and Strengthening Weaknesses in Urban Living Waste Classification and Disposal Facilities

Urban living waste classification and disposal facilities are important urban environmental infrastructure. It accelerates the construction of facilities for classified placement, collection, transportation and treatment of domestic garbage, makes up for gaps in treatment capacity, improves urban environmental infrastructure, improves the ecological environment, enhances the modernization of governance capacity, and promotes the formation of a system for classifying and treating domestic garbage that is in line with economic and social development.

9

August 27, 2020

Technical specifications for pollution control of fly ash from domestic waste incineration (for trial implementation) (HJ 1134-2020)

This standard specifies the technical requirements for pollution control of fly ash from domestic waste incineration in the process of collection, storage, transportation, treatment and disposal. Aimed at preventing and controlling environmental pollution, improving the quality of the ecological environment, standardizing and guiding the environmental management of domestic waste incineration fly ash.

10

September 11, 2020

Implementation Plan for Improving the Construction and Operation of Biomass Power Generation Projects

Starting from January 1, 2021, all biomass power generation projects that have been approved but not yet commenced within the planning, and all newly approved biomass power generation projects are configured through competition. Meanwhile, in order to promote biomass power generation projects to give full play to their roles in environmental governance and increasing renewable energy supply, and to ensure the scientific and efficient use of subsidy funds, the projects under construction should be completed and put into operation within a reasonable period of time. Since 2021, new projects included in the scope of subsidies (including projects that have been connected to the grid in 2020 but not included in the current year's subsidy scale and projects newly connected to the grid and included in the subsidy scale from 2021 onwards) subsidy funds are borne by the central and local **** with.

11

September 29, 2020

Several Opinions on Promoting the Healthy Development of Non-Water Renewable Energy Power Generation

Non-water renewable energy is an important part of the energy supply system, and is an important element in ensuring energy security. The opinions put forward: First, improve the current subsidy method; second, improve the market allocation of resources and subsidy regression mechanism; third, optimize the subsidy payment process; fourth, strengthen the organization and leadership, in the supplemental notice of the project reasonable hours of utilization, the project subsidy power, subsidy standards, and to strengthen the verification of the project and other matters to be supplemented.

12

October 15, 2020

Notice on the in-depth promotion of cleaner production audit of key industries

Strengthening financial security and policy support, in accordance with the "People's Republic of China **** and the State Cleaner Production Promotion Law" requirements will be included in the cleaner production audit of the work of the funds into the level of the annual financial budget for the cleaner production engaged in research, Demonstration and training in cleaner production research, implementation of key national cleaner production technology transformation projects and voluntary resource conservation, reduction of pollutant emissions contained in the agreement on technological transformation projects, to give financial and policy support. Costs used by enterprises for cleaner production audits and training can be included in their operating costs. To achieve the international leading level of cleaner production of enterprises, in the government green procurement, enterprise credit financing and other areas to give priority to support the inclusion of supervision and enforcement of the positive list.

13

October 20, 2020

New Energy Vehicle Industry Development Plan (2021-2035)

Promote the development of the entire value chain of power batteries. Encourage enterprises to improve the ability to guarantee key resources such as lithium, nickel, cobalt and platinum. Establish and improve the modularized standard system of power battery, accelerate the breakthrough of key manufacturing equipment, and improve the process level and production efficiency. Improve the recycling system of power battery recovery, ladder utilization and re-resourcing, and encourage *** to build *** recycling channels. Establish and improve the power battery transportation and warehousing, repair and maintenance, safety inspection, decommissioning and withdrawal, recycling and other aspects of the management system, and strengthen the whole life cycle supervision.

14

October 26, 2020

"Notice on the Reduction of Additional Subsidies for Renewable Energy Tariffs for Environmentally Illegal Garbage Incineration Power Generation Projects"

The garbage incineration power generation project should complete the "installation, tree, and connection" in accordance with the law before being included in the scope of the subsidy list. The scope of the subsidy list. After the waste incineration power generation project discloses the automatic monitoring data to the society, the power grid enterprise can disburse the subsidy funds and reduce the subsidy funds during the period when the automatic monitoring data is not disclosed to the society at the time of settlement. 2020 June 30 has been included in the subsidy list, but has not completed the "installation, tree, link" of waste incineration power generation project, the power grid enterprise shall first suspend the disbursement of subsidy funds. Enterprises should first suspend the allocation of subsidy funds, until the power generation enterprises to complete the "installation, tree, link" and to the community to disclose the automatic monitoring data before the allocation of subsidy funds.

15

November 5, 2020

The National Hazardous Waste List (2021 Edition)

The new List reduces the number of types of hazardous waste by 12, and exempts 16 types of hazardous wastes, and some of the codes of the wastes have been changed, which will have far-reaching impacts on the generation, transportation, and treatment of hazardous wastes.

16

November 17, 2020

"Notice on the Announcement of the Results of the Declaration of the 2020 Biomass Power Generation Central Subsidy Projects"

77 projects in 20 provinces (autonomous regions and municipalities), including Hebei and Shanxi, are proposed to be included in the scale of the central subsidy for biomass power generation in 2020, and the total amount of subsidies required for the projects included in the scope of the subsidies has reached 1.5 billion yuan of new central subsidy funding in 2020. Among them, 18 projects of agricultural and forestry biomass power generation, 46 projects of waste incineration power generation, and 13 projects of biogas power generation

17

November 25, 2020

Announcement on Matters Relating to a Comprehensive Ban on Imported Solid Wastes

Since January 1, 2021, China will prohibit the import of solid wastes in any way, and ban the solid wastes outside China from entering the country for dumping, stockpiling and disposal. The Ministry of Ecology and Environment will no longer approve and issue import licenses for solid wastes that can be used as raw materials in the restricted import category.

In September 2020, President Xi Jinping solemnly proposed at the 75th General Debate of the United Nations General Assembly that China "strive to peak carbon dioxide emissions by 2030, and make efforts to achieve carbon neutrality by 2060." The Central Economic Work Conference in December 2020 further clarified that China would In December 2020, the Central Economic Work Conference further specified "doing a good job in carbon peaking and carbon neutrality" as one of the eight key tasks in 2021.