Technical data is the enterprise according to the relevant provisions of the management of the construction process should be filed to save the formation of a variety of drawings, forms, text and other technical documents in general. First, the technical data include the following: (418 documents) 1, the main materials, finished products, semi-finished products, fittings, equipment and other factory certificates and test (inspection) inspection reports; construction test records; construction records; pre-inspection of the project records; hidden inspection of the project acceptance records; foundation, structural acceptance records; construction organization and design; technical delivery; engineering quality inspection and evaluation; design changes, negotiation records. 2, the equipment Installation project records, there are four aspects: A. Electrical installation project information; B. Heating, sanitation and gas installation project; C. Ventilation and air-conditioning project; D. Elevator installation project. 3, the completion of the acceptance data. 4, as-built drawings. Second, the implementation of the technical data of the project under the leadership of the technical director of the professional engineers responsible for the system, the professional engineers are responsible for the collection of professional data::: finishing work, the project director regularly on the professional engineers of the work of the internal inspection, meet the requirements of the internal data regularly transferred to the project data archives preservation. Third, engineering and technical data management is part of the engineering and technical management work, so it should be closely linked with the construction of the project, the construction test records, material test records and construction records reflect the problem, we must report to the project technical director in a timely manner, for the problems found in a timely manner to deal with and solve. Fourth, the project management of technical data should comply with the "Beijing Construction and Installation Engineering Construction Technical Data Management Regulations". Fifth, technical data should be organized in a timely manner with the construction progress, must truly reflect the actual situation of the project. The management of information must be serious, such as arbitrary alteration, forgery, destruction or random withdrawal, resulting in information does not meet the requirements, the project manager should be punished.
More about the engineering/service/procurement category of the tender writing production, to enhance the winning rate, you can click on the bottom of the official website customer service free advice:/#/?source=bdzd