1. Molybdenum, zinc, tungsten and iron multi-metal industry cluster
The development principle and goal is to support the development of gold and non-ferrous metals, supplemented by coal and perlite, and continued by the primary processing and deep processing of non-ferrous metals; use of Russian electric power resources to build a base of non-ferrous mineral mining and processing in the northern part of Heilongjiang Province, and to create favorable conditions for the future use of Russian mineral resources for the processing of minerals. Favorable conditions.
Industry cluster mining layout: planning and construction of Dong'an rock gold mining joint venture, Cuihongshan molybdenum, zinc, tungsten and iron polymetallic mining joint venture, Kubin lead and zinc mining joint venture, GaoSongShan-FuQiang rock gold mining enterprise, Shimazi Dagang perlite mining and processing enterprise, HongXiuGou coal mining enterprise and oil and gas mining enterprise.
Planning to invest 1,728.5 million yuan in the construction of mines, processing plants, processing plants and resource exploration. It is predicted that by 2010, the annual output of gold will be 1,900 kilograms, the annual mining of iron ore will be 2 million tons, the annual output of iron ore concentrate will be 1 million tons, the annual output of lead, zinc, tungsten and molybdenum concentrates will be 40,500 tons, the annual smelting of non-ferrous metals will be 22,000 tons, the annual processing of non-ferrous alloys will be 11,000 tons, the annual mining of perlite will be 70,000 tons, the annual production of perlite products will be 50,000 cubic meters, and the annual raw coal production will be 100,000 tons. The annual output value is forecast to reach 2.71335 billion yuan and the annual profit tax is 325.2 million yuan.
(1) Dong'an Rock and Gold Industrial Base
The Dong'an Rock and Gold Mining Base includes Dong'an Gold Mine, Fuqiang Gold Mine and Gaosongshan Gold Mine.
①Dong'an Gold Mine: Dong'an Gold Deposit is a newly discovered large-scale rock gold deposit in recent years, with an existing resource reserve of 24.3 tons (only the No. 5 ore body), a silver resource reserve of 208 tons, and a predicted rock gold prospecting resource of more than 50 tons.
The planned mine covers an area of 1 square kilometer, including the quarry, material yard, ore dressing plant, tailings storage, substation, smelting plant, mine management department, employee living quarters and other building complexes and occupying works.
Planning for the construction of a mine, the annual mining ore 250,000 tons; ore dressing plant construction, the annual treatment of 250,000 tons of ore, mine service life of 20 years. 2009 to complete the basic construction of the mine and equipment installation and debugging, in 2010 into production.
Mineral exploration: in the main ore body around continue to look for mineral exploration, expanding the resource reserves of the mine, for the long-term development of the mine to lay the foundation of resource reserves. Exploration of the low-grade resource lots of the mine to improve the level of resource reserves and provide reliable base reserves and reserves for the subsequent production of the mine. The exploration period is from 2007 to 2010, and the proposed investment is 30 million yuan.
Economic benefit estimates of the resource industry: mine construction and exploration investment of 230 million yuan, is expected to annual output value of 252 million yuan, annual profits and taxes of 30.24 million yuan. Mainly used for the construction of the quarry, ore dressing plant, sewage treatment plant, tailings storage and other related facilities and costs. The construction of the mine takes investment to attract social capital, and the construction of the external environment is solved by the government's fund-raising. Expected annual output of 1680kg of gold, the mine is expected to annual output value of 252 million yuan, annual profits and taxes of 30.24 million yuan.
② Gao Songshan rock gold mine: the existing rock gold resource reserves of 3,000 kilograms, predicted resources of 2,000 kilograms. Planning the construction of a mine quarry, the annual production of 50,000 tons of ore; the construction of a processing plant, the annual processing of 50,000 tons of ore, mine service life of 20 years. 2009 to complete the basic construction of the mine, in 2010 put into production.
The planned mine covers an area of 0.4 square kilometers, including the quarry, material field, ore dressing plant, tailings storage, substation, staff living quarters and other buildings and occupying works.
The estimated mine construction investment of 50 million yuan, mainly including the quarry, processing plant, tailings storage and other related auxiliary facilities construction. Mine construction to attract investment to attract social capital, the external environment construction by the government to raise funds to solve. Expected annual output of 220 kg of gold, the annual output value of the mine can reach 33 million yuan, to achieve annual profits and taxes of 3.96 million yuan.
(2) Cuihongshan molybdenum, zinc and iron polymetallic industrial base
Including the city molybdenum, zinc and iron polymetallic mining enterprises and Kubin lead and zinc mining enterprises.
①Cui Hongshan molybdenum, zinc and iron polymetallic mining enterprises: Xilin Iron and Steel Group Co., Ltd. holding, Jianlong Iron and Steel Group, the province's Sixth Geological Survey Institute, Yichun Forestry Management Bureau of the shareholding composition.
Existing iron resource reserves of 64.78 million tons, zinc resource reserves of 513,400 tons, lead resource reserves of 194,300 tons, tungsten resource reserves of 122,100 tons, molybdenum resource reserves of 93,900 tons, copper resource reserves of 32,100 tons, 939,000 tons of sulphurous iron ore resource reserves. Additional exploration work is still in progress.
Planning for the construction of a comprehensive mining mine. To mining zinc iron ore as a carrier, at the same time on the *** born, associated and independent of other non-ferrous metal ore bodies. Annual mining iron ore 2 million 5 tons, mine service life of 30 to 50 years.
Planning for the construction of an ore dressing plant. Adopt the first magnetic separation and then flotation joint production process. First to iron, and then flotation of non-ferrous metals. Designed to handle 2 million tons of iron ore per year. Annual output of 1 million tons of iron ore concentrate; the total amount of non-ferrous metal ore is calculated according to 25% of the total amount of iron ore, and the recovery rate of non-ferrous metal beneficiation is calculated according to 80%, with an annual output of 17,000 tons of zinc concentrates, 10,000 tons of lead concentrates, 0.5 million tons of tungsten concentrates, 0.3 million tons of molybdenum concentrates. 2009 to complete the basic construction of the mines and beneficiation plant and the installation of equipment debugging, and put into operation in 2010.
Planning and construction of a non-ferrous metal smelting plant, the plant is located in Xunker County. The smelting of lead, zinc, tungsten, molybdenum and copper is designed to smelt 40,000 tons of lead, zinc, tungsten, molybdenum and other concentrates annually. 2009 will see the completion of the smelting plant's basic construction and equipment installation and debugging, and 2010 will see the plant go into operation.
Planning and construction of a non-ferrous metal products processing plant, located in Xunker County, smelter production of non-ferrous metals for deep processing, the annual processing of non-ferrous metal alloys and products of 22 million tons, in 2009 to complete the basic construction of the processing plant and equipment installation and debugging, put into production in 2010.
The planned mine covers an area of 1 square kilometers, including the quarry, material field, ore dressing plant, sewage treatment plant, tailings storage, substation, mine management, employee living quarters and other complexes and occupies the ground works. Planning and construction of a water source, a water diversion project for mine production water, the water source covers an area of 1 square kilometers. Planning a transmission line, from Kulbin Power Station to Cuihong Mountain.
Estimates of economic benefits of the resource industry: the total investment in the mine is about 1.3 billion yuan, the expected total annual output value of up to 2.3765 billion yuan, the total annual profit tax of 286 million yuan. The total investment in the mine is about 1.3 billion yuan, mainly including mine construction, plant construction and exploration funds (by 2010). Among them, 470 million yuan will be invested in mine construction, mainly used for mine water source and diversion project, power transmission line and substation, quarry, material field, ore dressing plant construction and equipment installation, sewage treatment plant, tailing pond, etc.; smelter construction and equipment installation and debugging of about 400 million yuan of investment in the construction of lead-zinc, tungsten and molybdenum products processing plant construction and equipment installation of about 350 million yuan of investment in the production and management, employee living quarters and mine The investment in production management, staff living area and road construction within the mine amounted to 0.5 billion yuan. The investment in further exploration is 0.3 billion RMB. The construction of the mine and plant to attract investment to attract social capital, the external environment by the government to raise funds to solve the problem.
In addition, the Cuihongshan iron polymetallic mine of the low-grade resources lot exploration, improve the level of resource reserves, for mine mining to provide a reliable base reserves or reserves; in the mining area around the continuation of non-ferrous metal exploration work, expanding the resources available for mine use reserves. Exploration period for 2007 to 2010, to invest 30 million yuan, is expected to submit all kinds of non-ferrous resource reserves of 300,000 tons.
To 2010, after reaching production, the mine mining 2 million tons of iron ore, with an annual output of 1 million tons of iron ore concentrate, with an annual output value of 500 million yuan; annual output of 17,000 tons of zinc concentrate, with an annual output value of 136 million yuan; annual output of 10,000 tons of lead concentrate, with an annual output value of 0.48 billion yuan; annual output of 0.6 million tons of tungsten concentrate, with an annual output value of 0.5 billion yuan; annual output of 0.3 million tons of molybdenum concentrate, with an annual output value of 400 million yuan. It is expected that the total annual output value of the mine can reach 1.576 billion yuan, realizing annual profits and taxes of 190 million yuan.
Non-ferrous metal smelting added value according to the difference between the metal price and concentrate, annual smelting 0.9 million tons of zinc, annual smelting increased output value of 0.9 billion yuan; annual output of 0.7 million tons of lead, annual smelting increased output value of 0.21 billion yuan; annual output of 0.42 million tons of tungsten, annual smelting increased output value of 150 million yuan; annual output of 0.16 tons of molybdenum, annual smelting increased output value of 150 million yuan. It is expected that the annual smelting to increase the total output value of 450 million yuan, the annual profit tax increase of 0.54 billion yuan.
Total processing of non-ferrous products can reach 22,000 tons, processing output value of zinc, tungsten and molybdenum metal according to 25% of the total value of zinc, tungsten, molybdenum, etc., the annual processing of zinc, tungsten, molybdenum and other value-added value can reach 356.5 million yuan, the annual profit tax of 42.78 million yuan. The expected total annual output value can reach 2,376.5 million yuan, and the total annual profit tax is 286 million yuan.
②Kubin lead-zinc mine
Existing proven resource reserves are: 16,900 tons of lead, 22,600 tons of zinc, further exploration work has not been done. Planning to build a mine, 50,000 tons of ore per year, 2009 to complete the basic construction of the mine, in 2010 to reach production. The service life of the mine is 13 years. The ore is sent directly to the Cuihongshan concentrator for beneficiation.
Annual output of 3,000 tons of zinc concentrate, annual output value of 24 million yuan, annual profit tax of 2.88 million yuan; annual output of 1,500 tons of lead concentrate, annual output value of 6 million yuan, annual profit tax of 720,000 yuan. Estimated mine construction investment of 5 million yuan, the planned mine covers an area of 0.2 square kilometers, the main facilities for mining engineering, ore sites and mining equipment.
(3) Shimazi Dagang Perlite Mine
Existing proven resource reserves of 1.04 million tons. The direction of mine development is to produce water-repellent insulation boards, flame-retardant boards, filter aids, additives, mineral sands as the leading products.
The planned mine covers an area of 1 square kilometer, including the quarry, yard, mine management department, staff living quarters and other buildings and occupying works. Planning perlite expansion plant covers an area of 0.3 square kilometers, including the material field, expansion production workshop, warehouse, factory management, staff living quarters and other complexes and occupied works.
Planning and construction of a mine, perlite expansion of a plant, expansion plant built in Xunker County. 2008 to complete the mine and expansion of the plant's basic construction, put into operation in 2009. Mine annual production of 70,000 tons of ore, mine service life of more than 100 years. Perlite expansion plant with an annual output of 50,000 cubic meters of expanded perlite series products.
Estimates of economic benefits of the resource industry: Estimated total construction investment of 43.5 million yuan, is expected to total annual output value of 30 million yuan, the total annual profit tax of 3.6 million yuan.
Construction of the total investment of 43.5 million yuan, of which the mine construction needs about 8.5 million yuan, mainly for the water source and water diversion project construction, mine electricity, quarry, yard, mining equipment, mine management, staff living quarters and road construction in the mine; expansion plant construction funds of about 35 million yuan, mainly for the water source, water diversion project and the construction of water recycling facilities, material field, production Workshop and finished product warehouse, transmission lines and substations, production management, equipment purchase and installation and commissioning, staff living quarters, other plant infrastructure construction and other purposes.
Mining and expansion plant construction are to attract investment to attract social capital, the external environment by the government to raise funds to solve. After reaching production, the annual mining stone 70,000 tons, the expected annual output value of 5 million yuan; annual production of puffed perlite products 50,000 cubic meters, the expected annual output value of 25 million yuan. The total annual output value is expected to be 30 million yuan, and the total annual profit tax is 3.6 million yuan.
(4) Hongxiugou Coal Mine
Existing proven coal resource reserves of 4.12 million tons, the current resources are not utilized. Planning to build a mine with an annual output of 100,000 tons of raw coal, in 2008 to complete the basic construction of the mine, in 2009 to reach production. The service life of the mine is 30 years.
The estimated mine construction investment of 30 million yuan, the expected annual output value of 20 million yuan. The degree of exploration of this mine is low, the prospect of exploration is very optimistic, the need for further mineral exploration, the exploration period of 2008 to 2010, to be invested in exploration funds of 20 million yuan, is expected to submit 50 million tons of resource reserves.
(5) oil and gas mineral exploration
2005 Daqing Oilfield in the Sunke Basin carried out a preliminary survey of oil, confirmed the existence of a certain amount of resources, a preliminary forecast of 180 million tons, in order to further expand the resource reserves, to be invested in exploration funds of 50 million yuan, the exploration period of 2008 to 2010, the forecast of submitting the resource reserves of 200 million tons. Strive to construct 1 to 2 oil wells before 2012.
2. Jiayin rock gold mining cluster
Jiayin rock gold mining cluster is located in the northern part of Yichun City, including Jiayin County and Uiling, Tangwanghe district northeast part of the area of 6759 square kilometers. Area of gold resources for the province's advantageous minerals, the famous group structure (Wulaga) gold mine for the province's only super-large gold deposits, proven resource reserves of 74,442 kg, retained resource reserves of 33,288 kg, with many years of development history, has made an important contribution to the development of the local economy. In addition, the area is also endowed with Pingdingshan medium-sized gold mine, Lianzhushan gold, antimony and tungsten mine, Malian gold mine and alluvial gold mine. There are 41,384 kilograms of rock gold reserves and 4,988,000 tons of coal reserves.
To develop and utilize rock gold mainly, including Wulaga-type gold mine, Pingdingshan gold mine, Lianzhushan gold-antimony-tungsten mine, Malian gold mine, etc., and focus on technical research and financial investment in the development of these resources, changing the stock of resources into economic increment, and forming a new economic growth point. At the same time continue to look for rock gold, copper, non-ferrous metals and other minerals.
Relying on the rich gold resources of the Wulaga gold mine, mainly in the Wulaga gold mine, make full use of the nearby gold resources, but also the use of "two kinds of resources, two markets" for mediation, and actively look for back-up resources, to give full play to the advantageous position of the Wulaga gold mine, and to promote the steady and healthy development of the industrial base.
3. Yichun molybdenum polymetallic mining cluster
Molybdenum, lead, zinc, iron and other metal minerals in the region for the region's advantageous minerals. As of the end of 2008, retained lead resource reserves of 260,000 tons, retained zinc reserves of 710,000 tons, molybdenum resource reserves of 15,200 tons (Luming molybdenum mine resource reserves into the inclusion of 10,100,000 tons, the actual proven reserves far more than 100,000 tons, to a large scale), iron resource reserves of 260,000 tons. The main deposits include Anqing County XuLaoJiuGou lead-zinc mine, Tieli City, two shares of the Xishan lot iron polymetallic mine, Tieli City, two shares of the Ringshuihe section iron polymetallic mine, Yichun City, Xilin lead-zinc mining area two lead-zinc mine, Yichun small Xilin lead-zinc mine, Yichun City, Kunlun gas lead-zinc mine, Yichun City, five camps five-star lead-zinc mines, Yichun City, Xilin District, LaoDaoMiaoGou lead mountain lead-zinc mines and Tieli City, LuMing molybdenum mines and so on, lead, zinc, molybdenum more than 10,000 tons of polymetallic deposits, lead, zinc, molybdenum, and so on. Metal deposits, Tieli City, two shares of the Xishan lot of iron, polymetallic ore iron resource reserves of 11,340 kilotons.
To develop and utilize molybdenum, lead, zinc, iron and other metal minerals, focusing on the planning and development of Luming molybdenum mine, two shares of the West Mountain iron polymetallic deposits, Ringshuihe polymetallic mines and five-star lead-zinc deposits, and to do a good job of the resource utilization of the lead-zinc mines of the small Xilin. Concentrate on technical research and financial investment in the development of these resources, turning resource stocks into economic increment and forming new economic growth points. At the same time continue to look for rock molybdenum, copper, lead, zinc non-ferrous metals and iron ore-rich resources.
Industrial cluster development planning: the iron ore recycling economy industry in and around Daxilin and the lead and zinc economy industry in and around Xiaoxilin, molybdenum, lead, zinc and iron economy industry in the area of Ershu - Luming as the core, Daxilin iron ore mine, five-star limestone mine, Xiaoxilin lead and zinc mines, lead and zinc iron ore in Ershu and molybdenum mines in Luming as the core enterprises to form the non-ferrous metals, iron and other The comprehensive development of the central mining economic zone to establish a non-ferrous metals and iron mining and processing circular industrial development zone, build the large Xilin iron and steel production base and small Xilin non-ferrous metal production base.
Industrial cluster composition and point axis structure (mining layout): planning and construction of two shares - Luming molybdenum polymetallic industrial zone, Hongqishan - on the green iron polymetallic industrial zone, five stars of the lead and zinc iron non-metallic industrial zone, Fuyu River polymetallic industrial zone, Cuiluan coal mining industrial zone, Xilin metal non-metallic industrial zone and Fengmao polymetallic industrial zone.
For the two shares - Luming industrial zone molybdenum resources concentrated distribution characteristics, focus on the construction of Luming molybdenum base; for the Xilin mining lead and zinc resources and mine selection and metallurgical conditions, etc., the establishment of a small Xilin lead and zinc mining industry base; due to the large Xilin Iron and Steel molding of the mine production and mining industry basis, focus on the construction of the large Xilin Iron and Steel base. Planning and construction of Yichun molybdenum polymetallic mining center.
Yichun molybdenum polymetallic mining center: according to the copper, molybdenum, lead, zinc, steel, iron and other metal mining development needs, in Yichun City, the establishment of molybdenum, lead, zinc, steel, iron high-tech development park. According to the special geographic location of Yichun City, the construction of the high-tech development park is mainly tasked with cultivating and developing backbone enterprises featuring deep processing of molybdenum, lead, zinc, steel, iron and other metals, striving to integrate all kinds of scientific and technological resources, encouraging and coordinating close cooperation between institutions of higher learning, scientific research institutes and enterprises, and creating a number of modernized and advanced development parks with distinctive industrial characteristics, leading core technologies, perfect service platforms, advanced management modes, and complete and domestic first-class basic functions. Complete, domestic first-class modernization, internationalization of copper and molybdenum, lead and zinc, iron and steel and other metal processing enterprises, give full play to the high-tech agglomeration effect, drive Yichun City, good and fast, better and faster economic development. Priority is given to the development of molybdenum, lead, zinc, steel, iron and other metal processing industries, focusing on the construction of Yichun City's export-oriented economy to Russia, build a technology platform, make full use of the university's resource advantages, and promote the construction and development of science and technology industrial park.
Luming molybdenum mining production base to go all out for the development of Luming molybdenum mine, growing the city's mineral economy. Make full use of the nationally determined forestry resource-based city economic transformation pilot and the province to determine the ecological functional area construction and the provincial government to support the development of Yichun Tieli molybdenum mine policy and favorable conditions, to strive for national support in the development of molybdenum resources, the early development of Tieli molybdenum mine, so as to make it one of the largest molybdenum mines in the country, and to become a pillar of the city's industrial economy.
Yichun Daxilin iron and steel production base relying on Daxilin iron ore mine and its nearby iron ore resources, and actively develop and utilize, and at the same time increase the neighboring Xunker County, Cuihongshan iron ore mine and Russia's Amur Okemkan iron ore development and utilization efforts. During the planning period, we will continue to grow metallurgical enterprises, support Xilin Iron and Steel Group to speed up the pace of technological reforms, realize a substantial increase in production and benefits, and consolidate Xilin Iron and Steel Group's leading position in the province's metallurgical industry.
Yichun small Xilin non-ferrous metal non-metallic production base Xilin lead-zinc mine, although after a long period of mining, the resource advantage is not obvious, the remaining low-grade ore, edge ore, burnt ore, but also to maintain the reorganization of the Xilin lead-zinc mine production for 10 years. On the basis of increasing the search for follow-up resources, we can rely on the development of the small Xilin Xidapo dolomite, moss green cement with marble, smelting crystals, silica, and actively promote the healthy development of the reorganized Xilin lead-zinc mine.