How to decorate the exhibition hall?
Decoration process of exhibition hall 1. The designer submits the overall space design, creativity, planning and conceptual scheme for the customer to confirm the design direction and style orientation. After the conceptual scheme is determined, both parties sign a design entrustment contract, and the customer pays the down payment of the design contract. The designer submits a formal design plan.
Decoration process of exhibition hall 2. Review the construction drawing scheme and propose amendments, and the designer will make relevant adjustments according to the amendments. According to the final design scheme, the decoration company prepares and submits a complete construction budget to the customer, including the comprehensive budget of basic decoration+main material procurement+equipment installation+overall accessories, which will be confirmed by the customer. After the customer confirms the construction budget, the two parties sign the construction entrustment contract through consultation and pay the advance payment for the construction project.
Decoration process of exhibition hall 3. Arrange the management personnel of the engineering department to organize the construction personnel to enter the site, appoint designers (main case designers and deepening designers), project managers and technical leaders of each group (electrical+equipment installation) to conduct comprehensive design disclosure, and at the same time, customers confirm the equipment manufacturers of air conditioning, fire protection, furniture and weak current.
Renovation process of exhibition hall 4. The project manager arranged for technicians to pay off the line for measurement, and the designer now checks the line. After passing the test, the project enters the stage of wall pattern positioning and comprehensive wiring, and the customer needs to confirm the furniture manufacturer. Concealed works and frame acceptance, the project enters the facing stage (ceiling and wall sealing plate. Wall latex paint, wallpaper. Stone, wood veneer and other decorative projects), and I will bear the interim payment of the project contract.
Decoration process of exhibition hall 5. The project manager arranges construction personnel to install switch lights and wallpaper in ground installation works (floors, carpets, etc.). ). Arrange and supervise the installation and debugging of various equipment manufacturers, and the project will enter the completion acceptance stage. Furniture enters the site, accessories are installed, and the project enters the trial operation stage. At the same stage, the decoration company submitted the project settlement documents for customers' confirmation.
Exhibition hall decoration process 6. The customer confirms the closing document, pays the settlement, and the project enters the warranty stage. The decoration company promises one-year free warranty and lifelong maintenance.
The above is how to decorate the exhibition hall brought by Bian Xiao. Explain in detail all the contents of the decoration process of the exhibition hall.