1. Acceptance criteria for milestones in requirements analysis stage:
-Complete requirements document, including functional requirements, non-functional requirements and user cases.
-Feasibility analysis of requirements, including technical feasibility and resource feasibility.
-Prioritize and confirm requirements.
2. Acceptance criteria for milestones in the design stage:
-Overall design documents of the system, including architecture design and module design.
-Interactive design of design prototype and user interface.
-Database design and data model.
3. Acceptance criteria for milestones in coding stage:
-The realized functional modules meet the requirements and design documents.
-The code meets the coding specifications and quality standards.
-The unit test has passed, and the corresponding test report is available.
4. Acceptance criteria for milestones in the testing phase:
-Prepare test plans and test cases.
-Implementation and passing of functional test, performance test and safety test.
-Closed loop of defect repair and defect verification.
5. Acceptance criteria for online milestones:
-Complete deployment and configuration.
-User training and document preparation.
-Acceptance test passed before going online.
It should be noted that each project and team may have different acceptance criteria, and the specific criteria should be formulated and adjusted according to the actual situation and project requirements.