In this paper, the infrastructure construction of Great God Laboratory and matters needing attention in all aspects are inquired.

If there is no laboratory, please ask a professional design institute to design and build it all the way; The clean water room of the established laboratory can work in the following aspects.

I. Infrastructure,

1. Finalization of design and construction drawing: water supply pipeline, drainage pipeline, wiring arrangement of two-phase and three-phase power supply, gas source distribution and waste gas emission system;

2, the floor, walls, ceilings and other parts of the decoration level, carefully selected materials;

3, laboratory workbench, reagent cabinet, medicine cabinet, fume hood and other office furniture supporting drawings.

Second, the equipment selection and positioning

1. Select supporting equipment according to the analysis scope of our laboratory, and list the name, function, size, voltage, current and demand for water and gas of the equipment;

2. Arrange the equipment location according to the above list, match the corresponding surrounding conditions, and implement the corresponding demand list one by one;

3. Optimize the selection and positioning, and finally form the site layout of the equipment.

Third, matters needing attention

1, the overall design and new construction of professional design institutes can also refer to the above contents;

2, according to the standards and specifications of design and construction, especially the supporting water, electricity, gas and medicine to meet the relevant requirements;

3, after the above work, according to the project for single machine commissioning and linkage operation.

The above are only personal opinions, please select after screening.