Application Report for Completion and Acceptance

Application Report for Completion and Acceptance (Generic 11)

In today's society, we use reports more and more, and there are different types of reports depending on their use. Are you still at a loss for writing a report? The following is a report on the application for completion and acceptance (generic 11) that I have helped you to organize.

Completion Acceptance Application Report Part 1

xx Investment and Development Company Limited:

Subject matter: Application report on the delivery quality inspection of the sixth contract section of the xx Bridge North Shore Connection Project

Content of the report:

The sixth contract of the Hangzhou Bay Bridge North Connection starts from the Shanghai-Hangzhou Expressway Buyun Junction, Pile No. k24+000, and finally ends at the north bridgehead of the xx Bridge, Pile No. k24+000, and finally ends at the north bridgehead of the xx Bridge, Pile No. k24+000. XX bridge north bridgehead, pile number k48+785, total length 24.785 kilometers. The total contract price of the pavement is 272,237,000 Yuan, which was awarded by ASEAN Company on January 24, XX, and the contract period is from February 15, XX to November 15, XX. After my department carefully organized, reasonable plan arrangement, now according to the contract agreement to complete the construction content.

I unit according to the Ministry of Transportation of highway engineering inspection and evaluation standards jtgf80/1-XX, the Ministry of Transportation on March 31, XX promulgated and implemented the "highway project completion (handover) acceptance methods" and related provisions of the requirements of the quality of the project for self-check. Each sub-item, sub-projects are qualified, and each sub-item, sub-projects are greater than 90 points, the rate of excellence is 100%, the self-assessment grade is excellent, to meet the design and quality requirements.

Now my unit has organized personnel to carry out the preparation of completion data, the information is complete, and strictly in accordance with the Ministry of Transportation and Communications of the content of the preparation is completed, in line with the provisions of the requirements. My project manager and supervision engineers have completed the contract section of the work summary.

So far, my unit has completed the Ministry of Transportation on March 21, XX promulgated and implemented the "highway project completion (handover) acceptance methods" stipulated in the handover of quality testing before the completion of the work, with the handover of the quality testing conditions, now I apply for my unit of the xx bridge north bank connection project six contract section for quality testing.

Hereby report.

Hereby

Salute! Engineering and technical information is complete, with acceptance conditions, and hereby apply for completion and acceptance.

Construction unit:

Date:

Completion Acceptance Application Report Part 3

xxx Responsibility Company:

Our unit construction of Guanzhong Tool Company shantytown renovation project 10# building project through the project department inspection and verification of the company that has the conditions for the completion of acceptance, and hereby apply for the completion of the acceptance, please organize the relevant units to give the inspection and verification.

Applicant:

Date:

Completion Acceptance Application Report Part 4

First, the project overview:

xxxx Phase II townhouse 36# project by Tianjin Development Area Taifu Property Development Co. Ltd., Tianjin Construction Engineering Group Architectural Design Co., Ltd. design, Beijing Zhongtiegong Architectural Engineering Design Institute survey; the construction area of this project is 458,43 square meters, *** counting 3 floors, brick structure.

Second, the construction process of quality control:

Construction process of the main building materials used in the construction of reinforcing steel, cement, bricks, gravel, concrete and other materials factory certificates, certificates of conformity are complete and valid; site sampling and retesting, retested and put into use, the quality of the design and specification requirements.

Foundation and foundation, the main body, decorative hidden works after the completion of self-inspection, do hidden works inspection records, and then reported to the supervisor acceptance, acceptance, after the next process of construction. The concrete strength test report is qualified and complete. The mortar has a standardized test block, and the strength test report is qualified and complete.

Roof waterproofing adopts Yuhong brand waterproofing materials produced by Tianjin Yuhong Construction Waterproofing Materials Co., Ltd; polyurethane waterproofing for bathroom floor adopts Yuhong brand waterproofing materials produced by Tianjin Yuhong Construction Waterproofing Materials Co. The broken bridge aluminum alloy windows are produced by Tianjin Dagang Changjiang Aluminum Co.

The materials, quality certificates and certificates of conformity for water supply and drainage, heating and electrical engineering are complete and valid.

Third, the project construction control information:

The project's quality control information and construction synchronization and basically complete; which **** occurred control information 21; safety function information 10, 10 items of quality of view information. Among them, roof drenching, bathroom water test, aluminum alloy window three performance testing, water supply and drainage and heating airtightness through the ball test, electrical lighting energized trial run and other safe use of functional qualification. All the above information is accepted by the supervisor all qualified in accordance with the construction specification requirements.

Conclusion

The project in the construction process to establish and improve the management system, quality assurance system and safety assurance system, the strict implementation of building laws and regulations and construction quality acceptance specification provisions, adhere to the process of control, the construction of problems can be rectified in a timely manner to prevent the occurrence of major quality accidents, to ensure that the quality of the project.

Now the company's technical quality department joint inspection, the project has been fully completed, after self-checking the quality of the project in line with the design requirements and construction quality acceptance specification provisions of the project quality is qualified to meet the completion of the requirements, special application for inspection.

Completion acceptance application report Part 5

xx City Water Affairs Bureau:

Jintang County in 20xx to solve the rural drinking water project for human and livestock, according to the provincial water conservancy department of Sichuan water letter [20xx] No. 130 on the Chengdu City, the second batch of the 20xx central budget special funds (state bonds) rural drinking water project implementation program approval, the project began on May 26, 20xx, 20xx January 30, completion. Completed on January 30, 20xx, completed the Qixian Township, Wufeng Township, Penny Township, and new township 4 townships, 10 villages, 0.97 million people, 0.55 million head of livestock drinking water difficulties. The main project content are: playing deep machine wells 3, build pumping station 4, build water supply pool 5 ****713 cubic meters, the new management room 4 461.22 square meters, pumping room 4 30.45 square meters, rack transmission line 0.95 kilometers, paving pe pipe, pvc-u pipeline 77.0252 kilometers. Completed a total investment of 2.7505 million yuan, of which: the central budget special funds 214.00 million yuan, the city supporting funds 485,000 yuan, local and mass self-funding 125,500 yuan. Comprehensive completion of provincial and municipal drinking water projects in rural areas under the construction of the task, as required by the completion of the information has been prepared, and is now applying for provincial and municipal leaders of the relevant business sectors of rural drinking water projects in my county to be completed and acceptance, in order to deliver the project unit for normal use, to play a good benefit of the project.

Properly, please approve!

Applicant:

Application Date:

Completion Acceptance Application Report Part 6

I. Overview of the project:

1, Project Name: Zunyi County XXX Center Kindergarten

2, Project Location: next to Zunyi County XXX Shawan Primary School

3, Floor Area and Number of Stories : The building area is about 1928m/-1+3 floors

4, quality target: to realize the qualified target specified in the contract.

5. Construction unit: Zunyi XXX Shawan Primary School

6. Supervision unit: Guizhou XXX Supervision Co.

7. Design unit: Guizhou XXX Building Design Co.

8. Geological survey unit: Shenzhou XXX Research Institute Co.

9. Construction unit: Zunyi XXX Building Engineering Co. Company

10, project characteristics: the project is -1+3 floors, structural form of frame structure, foundation form of hole pile and independent column base, foundation design grade C, structural safety grade II, structural design service life of 50 years. The intensity of defense in this area is less than 6 degrees, because this project is a teaching building, according to the key defense category for seismic design, seismic class C treatment. The concrete strength grade of this project: C30 for the hole pile, C30 for the ground beam, C30 for the columns of one to three floors, and C30 for the beams, slabs and staircases of all floors. The project started on July 20, 20xx, and was submitted for acceptance on May 25, 20xx.

Second, the project project completion brief:

According to the contractual agreement of the parties involved in the construction of the contents of the project design, construction, etc. are required to complete the task of the project to meet the quality level requirements of the contract, in the design of the project, the construction process, the strict implementation of the laws, regulations, quality assurance information, construction management and construction materials The file information such as factory inspection reports of construction materials, components and equipment are complete and effective. According to the agreed content of the construction drawings, the review is completed as follows:

1, the completion of the design project: foundation, main body, indoor and outdoor decorative works; water supply and drainage works, fire protection works; construction and electrical installation works; roofing works; the review of the foundation works qualified, the main body of works qualified, indoor and outdoor decorative works qualified, roofing works qualified; water supply and drainage works qualified; construction and electrical works qualified; fire protection works qualified. Fire engineering qualified.

2, technical files and construction management information: after reviewing the pre-construction, construction plan design review and other technical files are complete; supervision of technical files and management information is complete; construction technical files and management information is complete.

3, test reports: reviewed the main building materials (steel, cement, brick, sand, stone, waterproofing materials, electrical materials, etc.) test reports are complete and meet the requirements.

4, engineering quality warranty: engineering quality warranty has been signed, and the preparation of quality assurance and housing instructions.

Third, supervision and rectification of the situation:

In the construction of the project`s `every division, sub-process: construction, design, supervision, construction and other units to work closely together, better completed the inspection of the project, the inspection of the quality of the strict hold on the quality of the customs, the need to rectify the place, the construction of the convenience of the construction of the immediate and serious rectification, rectification. After the rectification of the supervisory party for review and acceptance, to meet the standard requirements before entering the next process of construction.

In the construction process, the supervision unit in strict accordance with the national construction quality standards for construction, with the various units involved in the construction of the project to complete the task of construction supervision, the construction process of the project in the course of each process are strictly in accordance with the supervision program, supervision procedures to do to ensure the quality of construction.

Fourth, the acceptance of the composition of the unit:

In accordance with the Ministry of Construction, "building construction and municipal infrastructure projects completion acceptance of the Interim Provisions," the requirements of the construction unit on May 20, 20xx group

Organization of the initial inspection, May 25, 20xx organization of the completion of the project's formal acceptance, to participate in the completion of acceptance Construction, design, survey, supervision, construction units and supervision station and other personnel composition meets the requirements.

Fifth, acceptance and rectification of the situation:

The project acceptance of the construction, supervision, construction, design and other units put forward acceptance, for the problems raised in the acceptance, the construction unit has been rectified, by the relevant units of the re-inspection through. The project also do indoor environmental testing, equipotential testing and other security testing, test reports provided by the quality supervision department, the test results qualified.

Six, the overall evaluation of the project:

After the construction, design, supervision, construction, supervision and other units *** with close cooperation, Zunyi County XXX center kindergarten project has been successfully completed. Reached the completion of acceptance conditions, is now officially organized completion acceptance.

Applicant:

Application Date:

Completion Acceptance Application Report Part 7

Project Completion Acceptance Application Report is based on the project funding application report for the type of funding application, the nature of the project to comprehensively assess the situation of funds in place, the use of funds and management of the situation, the completion of the project construction content, the quality of the construction project and the operation of the technical equipment, the production of a series of projects after the completion of the situation. The situation of a series of projects after the completion of the project and the issuance of the project construction situation.

1, completion and acceptance of the basis

(1) project approval (for the record) documents, project funding application report, project investment plan.

(2) environmental impact assessment report and approval, energy conservation assessment report and its review, as well as land, planning, production safety and other matters of approval.

(3) national and provincial standards and specifications for engineering construction, environmental protection, energy conservation, production safety, and other aspects of the product technical standards.

(4) project supervision, bidding and important equipment, raw materials procurement contracts.

2, acceptance conditions

(1) the project is completed in accordance with the requirements of the capital application report, the project investment plan construction, production and economic and technical indicators to meet and be able to meet the production and use requirements. Production preparations to meet the needs of production.

(2) The main process equipment and ancillary facilities by the linkage load test run qualified to produce qualified products in line with the provisions of the capital application report, the formation of production capacity, and can achieve the expected economic and social benefits.

(3) The quality of the project reaches the relevant national standards, the products meet the technical standards.

(4) environmental protection, energy conservation, production safety, fire and other facilities have been built and used in accordance with the design requirements and the main project at the same time, to meet the national requirements.

(5) project completion of the financial accounts report preparation is completed, and audited by the corresponding qualification accounting firm.

(6) project technical documents, information filed in accordance with the requirements to meet the needs of production, use and maintenance.

The project basically meets the conditions listed in the preceding paragraph, there are still sporadic civil works have not been implemented or a few non-major equipment is not in place, but does not affect the normal production and use of the main project, and the uncompleted investment accounted for the proportion of the total estimated investment is less than 10%, by the competent department of industry and information technology, the financial sector agreed, you can apply for the completion of the acceptance.

3, the completion of the acceptance content

(1) the completion of investment. Including project funds in place, the use of special funds for technological innovation and management, completion of the financial accounts audit and bidding.

(2) the completion of the project construction content. Including project land acquisition, civil engineering, equipment purchase, installation, construction of public utilities and other auxiliary facilities.

(3) construction project quality and technical equipment operation. Including environmental protection, production safety, energy-saving facilities, fire safety facilities to achieve results.

(4) After the project was completed and put into operation, the level of technology and equipment, product technology level, quality level, production capacity, economic and social benefits, energy saving and environmental protection, production safety.

(5) production readiness. Including production of working capital, raw material supply, energy supply, personnel training and so on.

(6) project technical documents, data archiving. Including approval, design, supervision, bidding and other aspects of the documents, as well as construction and installation works, process equipment, utilities and other technical documents, drawings filed.

(7) need to eliminate backward production capacity of the project to eliminate backward production capacity.

Applicant:

Application Date:

Completion Acceptance Application Report Part 8

Municipal Housing and Urban-Rural Development Bureau:

The construction of the project undertaken by our organization started on March 10, 20xx, with a total construction area of ㎡, 1# building: frame shear 11 floors, 2-5# buildings: brick 6+1 floors, 6# buildings: frame shear 16 floors. During the period of construction in strict accordance with the requirements of the drawings, has been fully completed. The project has been through the planning, safety, energy saving, lightning protection, fire and other acceptance, complete information, self-inspection has been qualified for completion and acceptance conditions.

Now apply to your bureau to organize the completion of acceptance.

Applicant:

Application Date:

Completion Acceptance Application Report Part 9

First, the project overview and completion of the situation:

xxxx field of overseas Chinese workers in the capitalization of the building project, is located in Nanning City, Jiangnan District, Youyi Road, Wu Wei section of the 26th compound, the cost of the project 3.18, 8 million yuan, the total floor space 3009,552 square meters, structural form of concrete frame structure / 6 floors above ground, the total height of the building is 17,15 meters, indoor and outdoor height difference of 300mm. building structure category for the third category, seismic intensity of six degrees, the building's reasonable service life of 50 years, waterproof grade for the third level, the building structural safety level for the second level.

Our company has completed the construction of foundation and foundation division project, main structure division project, building decoration division project, building roof division project, building water supply and drainage and heating division project, building electrical division project, building energy-saving project in accordance with the requirements of the design drawings and related design documents.

Second, acceptance conditions check results:

According to the relevant provisions of the unified standard of construction quality acceptance of building construction, the project has been completed according to the design requirements of the project construction tasks, engineering structural safety and use of functionality are in line with the requirements, have the project completion acceptance of the initial inspection conditions. Completion acceptance application report. The remaining individual details of the finishing work after the initial inspection by the construction and supervision unit to put forward the rectification requirements, our company according to the requirements of the rectification is completed in the form of a written report to the construction and supervision unit.

Third, the acceptance of organizational readiness:

Our company has completed the preparation of the xxxx field of overseas Chinese workers capital building project construction unit project quality evaluation report (draft), the completion of the project acceptance of the initial inspection by the construction unit of organization, the construction unit, the supervision unit, the design unit, the survey unit to participate in the composition of the acceptance of the acceptance of the acceptance of the group. The acceptance group will carry out the acceptance work. After the end of the acceptance of the construction units involved in the preparation of the corresponding project quality evaluation report, as the final completion of the acceptance of the necessary information.

Fourth, the proposed time and place of acceptance:

According to the completion of the project and the relevant requirements of the provincial and municipal authorities, the xxxx field of overseas Chinese workers capital building project completion acceptance of the initial inspection work is proposed to be drawn up on March 20, 20xx at 3:00 p.m., acceptance of the place: the xxxx field of the total plant.

In summary, the xxxx field of returning overseas Chinese workers capitalization building project has the completion of the acceptance of the initial inspection conditions, I implore you to arrange for the acceptance of the acceptance.

Completion and acceptance of the application report Part 10

First, the completion of the project:

XXX Reservoir Risk Reduction and Reinforcement Project by the provincial and municipal authorities to approve the project, the total approved investment of 10.06 million yuan, of which: 7 million yuan of national bond funds investment, the local matching funds of 3.06 million yuan. The main contents of the reservoir rehabilitation project are:

①, the front dam slope above 1563 elevation changed to slurry masonry, reinforcement of the upstream slope of the dam, in the left shoulder of the dam heart wall and the right wall of the spillway wall in contact with the tooth wall after the addition of a concrete seepage wall;

②, reinforcement of the spillway and the downstream river governance;

③, replacement of the arc work door and the flat plate access door, replacement of the arc door

The project began construction on May 31, 2001, and was fully completed at the end of June 2002, which lasted 13 months, and the main works have been completed in accordance with the program approved by the design, i.e.: the completion of the dam slope stabilization project; spillway stabilization and downstream river training project; the completion of the upper dam highway stabilization project, including 1.27 kilometers of highway berm and 3.2 kilometers of asphalt pavement paving, and the completion of the upper dam highway. Asphalt pavement, as well as a highway bridge, 6 flood culverts; complete the water spillway accident door, working door, opening and closing equipment system installation project; complete the installation of automated dam monitoring equipment and other projects, etc., at present, due to the impact of local matching funds dam concrete seepage barrier wall project can not be completed and the dam seepage level meter is not installed, the rest of the main project has been completed according to the design requirements. The project ****completed investment of 9.1524 million yuan (excluding pending inspection fee of 200,000 yuan), the completion of the main works are: earth and rock excavation 83,900 m3, earth and rock backfill 20,200 m3, slurry masonry 116,000 m3, 0.15 million m3 of concrete, consumed 1782T cement, reinforcing bars (steel) 40.54T, timber 112,600m3, asphalt 93.70m3, labor days 5.69million, and the project has been completed in accordance with the design requirements. Labor days 5.69 man-days.

Second, the acceptance conditions check results:

According to the Ministry of Water Resources, "water conservancy and hydropower construction project acceptance procedures" of the relevant provisions of the project according to the design requirements have been completed the main engineering construction tasks, although by the local supporting funds to make individual tailing failed to complete, but does not affect the project's normal safe use. The project investment use is reasonable, the final account has been completed and passed the completion audit. Completion information has been prepared, the quality of engineering construction has passed the xx city water conservancy basic construction quality supervision station quality inspection, and issued a "project quality inspection assessment report", the project quality is qualified. Completion of the project in the trial run, the project can operate normally, the economic and social benefits are significant, has the formal acceptance conditions.

Third, acceptance of organizational readiness:

xxx reservoir in addition to the risk of reinforcing the project has been prepared by the project legal person "engineering construction management work report" and "engineering completion and acceptance of the appraisal" (draft), engineering design, construction, supervision, operation and management of the unit have been prepared to complete the corresponding "work report ". According to the "water conservancy and hydropower construction project acceptance regulations" of the relevant provisions of the project, the project sponsor to the higher authorities to set up a "completion acceptance committee", responsible for the completion of the xxx reservoir reinforcement project acceptance work.

Fourth, the proposed acceptance time, location and participating units:

According to the completion of the project and the relevant requirements of the provincial and municipal authorities, xxx reservoir in addition to the risk of reinforcing the completion of the project acceptance is proposed to be prepared in 20xx, the acceptance of the location in the participating units are the Provincial Department of Water Resources, xx Municipal Bureau of Water and Electricity, Bureau of Finance, Bureau of Planning, xx River Basin Water Resources Management Bureau and the project owner, design, supervision and management, and the project manager, design, supervision and management. The project owner, design, supervision, construction, quality supervision, operation and management and other relevant units.

In summary, the xxx Reservoir Risk Reduction and Reinforcement Project has the conditions for completion and acceptance, and I urge the higher authorities to arrange for formal acceptance.

Applicant:

Date:

Completion Acceptance Application Report Part 11

First, the completion of the project:

xx County, xx home 1, 2 # building project by xx County Housing Construction Company eleven project department in xx in xx months xx construction, xx the end of the month of xx fully completed, lasted xx months, according to the design of the approved program has been the first time. months, in accordance with the design of the approved program has completed the main works, namely: civil decoration works; water supply and drainage works; electrical equipment installation works.

Second, acceptance conditions check results:

According to the relevant provisions of the state, the project has completed the main engineering construction tasks according to design requirements. Completion of the acceptance application report. The use of investment in the project is reasonable, the completion of the information has been prepared, the quality of engineering construction has passed the quality inspection of the quality supervision station, and issued a project quality inspection assessment report, the quality of the project is qualified, has the formal acceptance conditions.

Third, the proposed acceptance time, location and participating units:

According to the completion of the project and the relevant requirements of the provincial and municipal authorities, xx County xx home 1, 2 # building project completion acceptance work is proposed to be prepared in xxxx xx months xx, xxxx xx, acceptance of the location of the xxxxxxxxxx, participate in the unit are Project manager, design, supervision, construction, quality supervision and other relevant units.

In summary, xx County xx home 1, 2 # building project has the conditions for completion and acceptance, I implore the higher authorities to arrange formal acceptance.

Applicant:

Date of application:

;