Total power of equipment in the room: W
Area of the room*150W~250W: (floor area) square meters; unoccupied area of the room*150W, and the area of intensive activities*250W
Cooling power:
Air conditioner cooling capacity: W (nominal air conditioner cooling capacity*95%~85%)
Considering the regional summer outdoor temperature and the influence of the fresh air system, the duct supply air to reduce the efficiency of air conditioning, etc. should be configured. p>
Considering the outdoor temperature in summer in the region as well as the influence of the fresh air system and the reduction of air-conditioning efficiency by pipeline air supply, etc., the air-conditioning cooling capacity should be configured Air-conditioning cooling capacity=total heat load*1.1~1.25; this coefficient should be set to 1.3~1.5 if the constant temperature and humidity air-conditioning dedicated to the machine room is not used.