Second, implement the approval system for construction projects. The construction unit shall complete the environmental impact assessment document review and approval process before submitting the feasibility study report. For construction projects that implement the approval system, the construction unit shall complete the project application report before submitting it. For environmental impact assessment document review and approval procedures, for construction projects that implement the filing system, the construction unit should complete the review and approval procedures after completing the filing procedures, and before starting the environmental impact assessment document review and approval procedures for the project.
Article 23 The environmental protection administrative department of the State Council is responsible for examining and approving the environmental impact assessment documents of the following construction projects: (A) special nature, nuclear facilities, top secret engineering construction projects.
(2) Construction projects directly under the central government of the provinces, autonomous regions, and municipalities within this administrative region;
(3) Approval, construction projects approved by the State Council or relevant authorities, authorized by the State Council department.
The authority to review and approve environmental impact assessment documents for construction projects other than those specified in the preceding paragraph is stipulated in all provinces, autonomous regions, and municipalities directly under the Central People's Government.
If the construction project may cause adverse environmental impacts across administrative regions, the environmental protection administrative department in charge of the dispute is responsible for the environmental impact assessment results of the project, and the environmental impact assessment document approved by the environmental protection administrative department* **Enjoy. Publish the catalog of construction projects that directly review and approve environmental impact assessment documents, construction projects commissioned by the Ministry of Environmental Protection, and the catalog of environmental impact assessment documents of provincial environmental protection departments approved by the Ministry of Environmental Protection
Announced in 2009
p>Approval regulations "(Ministry of Environmental Protection Order No. 5), in accordance with the Environmental Impact Assessment Law of the People's Republic of China" and the "Classification of Construction Project Environmental Impact Assessment Documents" The Ministry of Environmental Protection directly approves the environmental impact of construction projects Catalog of Environmental Impact Assessment Documents (2009)" (see Annex 1) and Catalog of Environmental Impact Assessment Documents of Construction Projects (2009) (see Annex 2) entrusted by the Ministry of Environmental Protection for Environmental Protection Approval of Provincial Environmental Protection Departments. Since March 2009 Starting from the 1st, the Ministry of Environmental Protection will directly review and approve the catalog of environmental impact assessment documents for construction projects (2009 Attachment: 1.)
2. Entrusted to the Ministry of Environmental Protection for approval. Catalog of Environmental Impact Assessment Documents of Construction Projects of the Environmental Protection Department (2009)
00 February 20, 2009
Catalog of Environmental Impact Assessment of Construction Projects with Subject Headings Announcement
Attachment 1:
The Ministry of Environmental Protection has approved the directory of construction project assessment documents for investment scale or large-scale construction projects that have a direct impact on the environment (2009)
(a) Water
International river projects in reservoirs and rivers in various provinces (autonomous regions, municipalities directly under the Central Government)
Other water projects require central coordination with the government. The project involves the adjustment of water resources allocation in various provinces (autonomous regions and municipalities).
(2) Energy and power hydropower station construction projects in major rivers and projects with a total installed capacity of 250,000 kilowatts and above.
Power plants,
Coal-fired power generation projects of thermal power plants (except back pressure unit projects)
Nuclear power plant projects: 750 kV and The above AC and DC projects and 500 kV DC projects, cross-border, cross-provincial (autonomous regions, municipalities) 330 and 500 kV AC projects
Nationally planned coal mines with an annual output of more than 1.5 million tons of coal. Development project.
A new oil field development project with an annual output of 1 million tons; provincial (autonomous region, city) trunk pipeline network (excluding oil field gathering and transportation pipeline network).
Annual natural gas production capacity is one billion cubic meters, new natural gas field development projects, provinces (autonomous regions, municipalities directly under the Central Government) or natural gas pipeline networks with annual gas transmission capacity of 5 million cubic meters (excluding oil and oil and gas field gathering and transportation pipeline networks) .
(c) The above-mentioned new projects (including additions) in provinces (autonomous regions, municipalities) or 100 kilometers of transportation railways.
Projects of highways, national trunk highways, national highway networks, provinces (autonomous regions, municipalities directly under the Central Government).
lt;BR/Xingang District? Coal, ore, oil and natural gas projects with berths in waterways and dedicated container terminals with an annual throughput capacity of more than 2 million tons;.
Director of Civil Aviation at New Airport; expansion of joint military and civilian airports.
(4) Ferrous metal smelting
Iron ore development projects with proven industrial reserves of 50 million tons and above, new construction (including relocation), expansion (including technological innovation and improvement) Production efficiency), ironmaking (including sintering, pelletizing, coking, direct reduction and smelting reduction), steelmaking projects.
Non-ferrous metals, mining development projects with a total investment of 500 million yuan and above, electrolytic aluminum alumina projects, new and expanded copper, lead, and zinc smelting projects.
Rare earth mining, smelting separation and rare earth deep processing projects with a total investment of 100 million yuan or more.
gt;
Gold ore mining projects of 500 tons per day and above.
(e) Chemicals and Petrochemicals
New petrochemical refining and expanded refining projects, once new and renewed and expanded to new ethylene production capacity of over 200,000 tons of ethylene project.
Chemical chromium, cyanide production projects; purified terephthalic acid (PTA), paraxylene (PX), diphenylmethane diisocyanate (MDI), toluene diisocyanate (TDI) projects, coal Methanol, dimethyl ether, olefins, oil and natural gas projects.
(F) Mechanical
Automotive New Automotive Project.
More shipbuilding facilities in the new 100,000-ton ship (slipway, dock) project.
(7) Light industry
Papermaking project with an annual output of 100,000 tons of wood pulp.
All denatured fuel ethanol. ...... / agt;
Corn deep processing new construction and expansion project.
(H) Urban construction and urban rapid rail transit projects; water supply projects with daily water diversion of 500,000 tons or more in each province (autonomous region, municipality directly under the Central Government).
(IX) Social undertakings
Tourism national key scenic spots, national nature reserves, national key cultural relics protection units with a total investment of 50 million yuan and above in the region, tourism development and resource protection Facilities, world natural and cultural heritage protected areas, a project with a total investment of 30 million yuan.
A large theme park for entertainment.
(10) Nuclear and Radiation
Nuclear facilities (including scientific research laboratories related to nuclear facilities).
Radioactive uranium (thorium) mines and related departments approved by the State Council or associated radioactive mine development and utilization projects
Electromagnetic radiation facilities and projects approved by the State Council or relevant departments.
(11)
Top Secret Projects
Additional Catalog (12) (a) to (j) Other Foreign Investment Industry Guidance Catalog ", Total Investment Restricted projects of US$50 million (including capital increase) and above
Foreign investment
(13) In the Party Central Committee, the State Council and the National Hazardous Waste and Medical Waste Disposal Facilities Construction Plan. “Hazardous waste disposal facility construction project.
"Catalog of environmental impact assessment documents for construction projects entrusted to provincial environmental protection departments approved by the Ministry of Environmental Protection (2009)," in accordance with the provisions of the "Environmental Impact Assessment Law of the People's Republic of China", by The Ministry of Environmental Protection approves construction projects with environmental impact assessment documents.
Note: This appendix project does not indicate a new, expansion or renovation, including new construction, expansion and technological innovation.
Attachment 2: lt; BR/Ministry of Environmental Protection entrusted by the provincial environmental protection department to review and approve the construction project directory of environmental impact assessment documents (in 2009)
Investment scale or construction scale of project category
gt; Energy and electricity: pumped storage power station; coal-fired thermal power station using back pressure unit, wind power plant with total installed capacity of 50,000 kilowatts and above project.
Power grid project: 330,500 kV AC projects that do not cross provinces (autonomous regions, municipalities directly under the Central Government).
The national coal mining area plans a coal development project with an annual production capacity of 1.5 million tons.
Petroleum: National crude oil storage facility.
Gas: Imported LNG receiving, storage and transportation facilities.
Transportation roads: the development of western highway projects, cross-border, independent highway bridges and tunnel projects across major rivers (navigable or above).
Water: Navigation structure 1,000-ton inland waterway shipping project.
Civil Aviation: Total investment of 100,000 yuan and above, airport expansion project.
Information industry telecommunications: domestic trunk transmission networks (including radio and television networks), international telecommunications transmission circuits, international gateway stations, dedicated telecommunications networks and international communications facilities for information security telecommunications infrastructure projects.
Published: International gateways and other information security postal infrastructure projects.
Electronic information product manufacturing: satellite TV receivers and key parts production projects.
Fourth, non-ferrous metal metallurgical steel rolling project.
, chemical industry, petrochemicals and fertilizers: potash fertilizer projects with an annual output of 500,000 tons and above. lt; BR/Chemical industry: PTA, PX projects with an annual output of more than 100,000 tons.
Mechanical vehicles: In addition to new automobiles, projects that require state approval.
Ships: civil ships, low-speed diesel engine production projects.
Others: Urban rail transit vehicles, signaling systems and traction transmission control system manufacturing projects.
, light industry, textile and other textiles: polyester projects with a daily output of 300 tons and above. BR/gt; Tobacco: Tobacco cellulose diacetate and tow projects.
Salt: All (including state-owned thermal power excluded).
8 Urban construction of urban bridges and tunnel projects across large rivers (navigable sections).
9 Social undertakings, university towns, medical towns and other park construction projects.
Involving three and four level biosafety laboratory construction projects.
F1 racing track project.
10. , financial banknote printing and coinage banknote paper project.
"Foreign Investment Industry Guidance Catalog" for encouraged and permitted projects exceeding US$100 million.
Note: The items in this appendix do not indicate a new, expansion or renovation, including new construction, expansion and technological innovation.