Dear **** Health Bureau:
Your bureau in **** * month ** day of my store inspection, the existence of problems put forward rectification advice. My unit organizes all staff to seriously rectify, rectification report is as follows:
1, set up food safety management personnel.
2, the kitchen is set at a distance of toxic, harmful pollution sources outside the scope of influence, set up the corresponding roughing and other operating places, as well as food storage and other places. The processing operation places according to the raw materials into the processing, semi-finished products processing, finished product supply in the order of reasonable layout and clear partition. For raw materials, semi-finished products, finished products, utensils and containers have a clear distinction between the mark, and separate storage.
3, the kitchen floor leveling, no cracks, set up a sufficient number of hand washing equipment, doors and windows set fly net.
4, set up an independent dining utensils decontamination room, the structure of the closed special for the storage of disinfection of dining utensils cleaning facilities, the use of centralized disinfection enterprise supply of tableware.
5, set up a roughing table and a sufficient number of dish racks, food contact equipment, tools in line with food safety standards and requirements.
6, food and non-food stored separately, with obvious signs.
7, set up independent air conditioning, tool cleaning and disinfection facilities, special refrigeration equipment, special sampling refrigerator and identification.
8, the establishment of health management files of employees.
************ ************ fast food restaurant
July 1, 2014
Question 2: How is the rectification report written? To Customs:
This received your customs issued on my factory does not meet the relevant regulatory requirements of the matter, our management attaches great importance to, and ordered to rectify, now the rectification report is as follows:
1, bonded and non-bonded materials have been differentiated from the placement of bonded materials, storage of bonded materials location set up a clear sign, marked "Customs Bonded Goods "words;
2. Improve the relevant financial system of our company, and formulate the corresponding operating rules, and strictly implemented. Has been on the books of bonded and non-bonded goods, in accordance with the principle of unified records, separate accounting for the accounts.
In the future, we will strictly follow the requirements of relevant laws and regulations to do a good job.
Hereby.
Attachment: Revised financial system.
------ Company
Month of the year
Question 3: How to write a rectification report 5 points Shenyang **** Pharmacy Limited medical insurance inspection and rectification report
Honorable leaders:
According to the "Chinese People's Republic of China **** and the State Drug Administration Law" and the "Shenyang City, urban workers' basic medical insurance fixed-point retail drugstore management approach"
The city of urban workers' basic medical insurance fixed-point retail drugstore management approach (Shen people's social development [2010] No. 68 document) of the provisions. Our store as a medical insurance designated pharmacy accepted the city medical insurance center and the Pharmaceutical Supervision Bureau of the joint inspection. In the process of inspection, the leadership of the overall image of the store to give a full affirmation, but also on the store in the details of the shortcomings of the pertinent criticism and rectification advice.
The details are as follows: (write down the problems written by the inspectors)
I. **********
ii. ************
iii. *********
iv. ************
In response to the above comments I store to make adjustments, the specific corrective measures are as follows:
1. ******************
2. *****************************
3. *************** ******
4. **************** Dan ********
The above are the corrective measures of our store, and I hope that you will give more valuable advice.
****** ****** Pharmacy Limited
February 2011 **Month**
Question 4: Improvement of the book of reasons how to write In order to better complete the task of study, reflecting on their own shortcomings in the last semester of study, combined with their own actual situation, to formulate a reasonable study plan to complete my studies.
I. Reasonable arrangement of time, on time to complete the study task.
Reasonable arrangement of study time, allocation of study time for various subjects, and increase investment in bad subjects.
Second, develop the habit of taking notes.
Before the class, do a good job of pre-study notes, focusing on understanding the key points of the course difficulties, the class, do a good job of listening to the notes, and develop good study habits.
Third, seriously complete the assigned homework, develop self-initiated learning habits.
According to the requirements of the teaching program, we should complete the homework and learning tasks assigned by the teacher according to the quality and quantity. Learning to learn independently.
Fourth, more to teachers and classmates to ask for advice.
When encountering difficult problems, we should ask the teacher for advice, or contact our teachers and classmates through email to seek counseling and help.
v. Do your review work before the exam in time.
The pre-test review is an important part of learning, to check and supplement the whole course and summarize the experience.
Sixth, the use of spare time, through the computer network to enhance learning.
With the development of new technologies, new media, distance open education to advanced science and technology applied to teaching, I want to use my spare time, through the network regularly browse, in order to adjust their learning progress and strategy in a timely manner. Learning through the network online courseware and learning management platform. Contact with fellow teachers and students through e-mail to seek counseling and help.
VII, complementary deficiencies, to determine the major to be remedial
To strengthen the comprehensive quality, strengthen the practice in the study, self-exercise. Absorb new skills and knowledge to enrich themselves, improve the ability to analyze and deal with the work, pay attention to summarize the experience and improve themselves. Supplementary social practice experience.
I will follow the plan, step by step, to complete the study program.
In order to realize the goal of my plan, I will reasonably arrange the time, heart, hard learning, hard work, challenge themselves!
Question 5: Who is Bablu? 10 points Don't know
Question 6: How to write a report on the improvement of printing text leakage 1, the cause of the problem analysis;
2, the measures taken on the emergence of the problem (increase the inspection, etc.);
3, the training of the processing process;
4, to strengthen the process of inspection, to prevent the problem from recurring.
Question 7: how to write a rectification report on my company's interior decoration fire rectification report Dear Xuhui Fire Supervision Department: My company is located in the ** Road 000 No. 00 building 00 floor. The company at all levels *** and the strong support of the department, especially your office on the company's renovation project program confirmation and project completion acceptance through, greatly facilitating the progress of our work, the company has been operating normally. Due to the importance of fire protection work, according to your office 00123456 notice, certain fire matters still need to be rectified. To this end, we in accordance with the requirements of your office, combined with the completion of the current project, and actively improve the situation is reported as follows: 1.&n......
Problem 8: how to write a rectification report quality management system
Table of Contents
General
In order to comprehensively improve the quality of construction of our projects, we will continue to improve the quality of construction of our company. Comprehensively improve the construction quality of our project, the strict implementation of the enterprise quality first, customer satisfaction, continuous improvement of the quality policy, adhere to the principle of who is in charge of who is responsible, who is responsible for the construction, to achieve the project quality management objectives, especially the formulation of the rules, the company's departments, project departments, subcontracting units and construction teams should be strictly enforced.
Management Content
Material Inspection Management Regulations
Material Inspection Certificate
Raw materials, finished products, semi-finished products, building components, appliances, equipment, and other materials into the field of use, there should be a factory certificate of conformity, sampling and inspection certificates and other quality assurance information.
Self-inspection of materials
Participation in the material inspection of the three members (materials, warehousemen, quality assurance officer) should be responsible for, in particular, quality assurance personnel, should be designated to participate in the inspection, and the professional counterparts, civil materials inspection by the participation of civil quality assurance officer, decorative materials inspection by the participation of decorative quality assurance officer, plumbing and electrical materials by the water and electricity quality assurance officer to participate in the material self-inspection should be in accordance with the corresponding terms of the contract and technical requirements for inspection. and technical requirements of the contract to carry out checks.
After the material into the field, by the material supervisor to organize the quality and safety team leader, warehouse supervisor or other professionals to participate in the acceptance, acceptance of the contents of the manufacturer's production license, certificate of conformity, inspection reports, quality of the object, checking the material samples and delivery of the bill of lading, price, quantity, specifications and models.
After passing the inspection, the warehouseman issued a "receipt (goods) sheet", unloading into the warehouse.
Doubts about the quality of incoming materials, the site by the deputy manager in charge of the project and the supply unit to re-acceptance, and still can not reach a consensus, all parties can apply to the regional company or headquarters engineering management center level by level to coordinate the processing of the (controversial when sent to the testing agency inspection).
Material into the field, the supply unit needs to fill out the material acceptance application form to the acceptance group check.
The materials purchased according to the sample must be checked against the sample.
For large quantities of decorative and piping materials, important equipment into the field, the regional company quality and safety supervision and management center should strengthen supervision and management: the first batch of materials into the field, the project quality and safety team should be reported to the regional company quality and safety supervision and management center and together with the relevant professionals to carry out acceptance.
Inspection personnel in the acceptance of materials should be strictly check, the main quality assurance information is incomplete or expired materials, materials testing failed, etc., the inspector shall not sign.
Inspection personnel in the inspection of materials, should be truthfully fill in the inspection opinion, shall not be false.
Material inspection
Materials after self-checked, the construction personnel in charge should promptly fill out the "project materials inspection sheet" and attached to the certificate of conformity, inspection reports and other quality assurance information to the construction (supervision) unit inspection, acceptance and acceptance of qualified before being allowed to enter the field of use.
The professional machinery and equipment, materials, should be organized construction (supervision) units and supply units of professional and technical personnel **** with the acceptance, acceptance of the supply unit should be used after the unit to make a detailed briefing, instructions.
The material without inspection or acceptance of unqualified materials should be withdrawn from the field, shall not be used without authorization.
After the acceptance of materials, the relevant information should be sent to the data clerk in a timely manner for classification and archiving.
Technical briefing, training management regulations
Technical briefing management regulations
Technical briefing is divided into the regional company, the project department and the team three levels.
(1) regional companies
For technically complex projects, the chief engineer of the regional company on the quality and safety supervision and management center, project management center and project manager, director of the engineer for the briefing, mainly on the quality of the target, safety targets, schedule targets, cost targets, the contents of the project contract, as well as the key construction technology, technical requirements, attention to a full range of macro-technical briefing. Attention to a full range of macro-technical briefings, and the formation of "the company's technical briefings minutes.
(2) Project Department
The project manager or chief engineer organized by the engineering group, quality and safety group of all managers and teams to carry out pre-construction technical briefing, mainly to the construction quality objectives, construction progress targets, safety targets, cost targets, drawings and design of the approved construction organization design program, the company's development of technology standards, quality acceptance criteria as the basis for the establishment of technical responsibility, quality responsibility system, and the establishment of a system of accountability. Responsibility system, quality responsibility system, safety responsibility system, cost responsibility system, to strengthen the construction quality inspection, supervision and management. On-site construction of specific content including: construction layout, the main project construction methods, quality, technical requirements, key points, difficulties and environmental protection measures, civilized construction, etc., and the formation of the "Ministry of the project technical briefing minutes".
(3) group
By the project department professional constructor or technician to the group and the operator for the briefing, mainly combined with the characteristics of the project and the actual situation, detailed arrangements for sample projects,....... >>
Question 9: How to write a report on the improvement of mixing material How to write a report on the continuous improvement of mixing material
It is not easy to type, if you are satisfied, hope to adopt.
Question 10: How to write a report on the rectification of existing problems What aspects of the problem, what aspects of the rectification ah
For example, I write the son is not good, rectification, I want to strengthen the practice of calligraphy in the future, write more practice, and strive to catch up with Wang Xizhi.
For example, I'm not good at writing.