1, according to the contract agreed to select the quota, according to the weight or equipment type sets of similar mechanical equipment installation subheading.
2, special specifications or special heavy outdoor equipment, before the installation of the preparation of a detailed construction program, especially the crane and measures must be detailed material. Part of the ground requires foundation treatment to meet the conditions of the crane in place.
3, special equipment and the owner of communication and negotiation, according to the tonnage of the installation fee.
Question 2: aluminum alloy equipment with (including bottom box) set what quota? You asked the aluminum alloy has a door and window sets have then set what quota?
A: Aluminum alloy has a door and window sets, sets of door and window sets of quotas.
Question three: the equipment base set with the implementation of the quota of what subheading set with the fifth book of metal structure of the equipment bracket subheading
Question four: the equipment base in the quota set with what quota appropriate set with the fifth book of metal structure of the equipment bracket subheading
Question five: the installation project, the inventory items have machinery and equipment installation, but the quota item is not done list you do not have any usefulness. Any use.
Which the "unit cost summary table", "list of sub-projects pricing table", "list of sub-projects comprehensive unit price analysis table", "list of measures pricing table", "measures the project fee analysis table", "sporadic work project pricing table", "other items list pricing table" are interlinked, according to the pricing specification layer by layer set out, each piece of equipment or each Each piece of equipment or each material of the project work is cataloged according to the quota is broken down into a number of construction links. The quota used by the national region is different, the same region in different years is different.
In the list has been done, it is difficult to change one of them alone (the resulting correlation is too much change, and it is difficult to count).
One of the "equipment price list", "the main material price list" is filled in directly. This is the same with or without the list.
So, you want to use the bill of quantities, only after determining the project needs to apply which year, which region of the quota, buy a set of the corresponding calculation software, use the software to do the information only.
Domestic popular bill of quantities software no less than a dozen, with the keyword "installation project budget software" search it.
Question 6: How to apply colored quotas for the installation of machinery and equipment? 15 points 2. Stainless steel, non-ferrous metal welding ring activity flange installation, the implementation of the flap activity flange installation of the corresponding quota, Lan connected to the pipeline installation, pipeline and flange calculation of the amount of work, and respectively, the use of the corresponding quota. 5.
Question 7: laboratory equipment installation set what quota according to the installation of the quota of water, electricity, wind and various types of equipment close to the corresponding subheading to set. Many need to be converted
Question 8: fire engineering part of the equipment set quota problems! 1, the two are the same, or set the same quota.
2, emergency stop spray button - fire installation project in the fire button subheading,
gas release indicator, manual automatic selector switch - these two sets of similar quota, change the price of the main material
Single area Gas extinguishing controller can set the fire alarm inside the controller related subheading.
3, repeater set module quota, button set fire button quota, the main stare price adjustment.
4, the second book of metal hose electrical equipment installation, piping and wiring in the corresponding quota.
5, the general use of RVS-1.5 can be, so set the second book of soft wires relative to the subheading can be.
Question 9: I am a novice installation budget, mainly weak power project, now in contact with Quanta, some equipment sets of quotas can not be found how to do ah set similar to it, some equipment sets of sets of installation costs, other on the main material. Do not need to be too accurate, anyway, intelligent does not rely on this installation fee to make money, mainly to look at the price of equipment and commissioning fees
Problem 10: general installation of the quota, a lot of equipment is not there, what to do Set a similar bar, there are sets of equipment sets of installation fees, the other on the main material. Do not need to be too accurate, anyway, intelligence does not rely on this installation fee to make money, mainly to see the price of equipment and commissioning fees