Site construction
(1) the construction site should be set up in a conspicuous position in the temporary erection of the building conspicuous signs, in different locations shall be based on the use of functions and characteristics of the hanging of the safety signs, weight-limiting signs, etc..
(2) The on-site processing shed shall be built by steel pipe and painted red and white.
(3) safety shed foundation must be flat, solid, the ground is not waterlogged, the roof of the shed for the double protection of the shed, and in the channel on both sides of the 1m high protective railing, the outside of the hanging safety net fully closed. Railings and poles are painted with yellow and black paint intervals, and hanging signs and signs.
(4) edge work shall be set in accordance with the provisions of the safety protection facilities, including guardrails, safety nets, safety gates, etc., safety gates or guardrails should be stereotyped, tooling type, and can be interlocked or automatically open. The height of the upper pole of the guardrail from the ground is 1.2m, and the height of the lower pole from the ground is 0.6m, and brush red and white paint.
Materials stacking
(1) Materials are stacked next to the processing site to ensure that all kinds of materials are neatly stacked.
(2) The materials shall be covered with rainproof cloth, the materials pay attention to waterproofing, can be set at the bottom of the pads or pouring plain concrete table, should be stacked in the high terrain, and set up 0.2% slope.
(3) The waste materials on site shall be cleaned up in time, centralized and stacked in the garbage pool, and it is strictly prohibited to discard them at will.
Site cleanliness
(1) to ensure that the construction site is smooth and clean, temporary water supply and drainage facilities without running, bubbling, dripping, leaking phenomenon, sewage recycling or discharge in a timely manner. (2) construction materials storage area, machinery and equipment placement area, machinery and vehicle parking area, office area, warehouse, etc. should be clearly divided according to the site layout plan, clear area signs and responsible person. (3) keep the processing surface clean and tidy, clean up the rebar head, wood chips and other waste materials in a timely manner, finished products and semi-finished products are required to yard neatly and do a good job of protection.
Electricity measures
(1) The site electrical equipment must be set up to prevent leakage of electricity, and must have the qualification of the electrician to operate. (2) switch and electrical appliances in the box must be intact, wiring is correct, and set leakage protection and sub-switch to ensure that "an empty leakage, a machine and a gate", set up outside the distribution box guardrail, rain shed, box locked and set up a person in charge. (3) All electrical equipment must be installed leakage protector, equipment and lines must be good, all kinds of electric equipment must be connected to zero, grounding. (4) night construction shall be set up enough lighting equipment, wet parts shall use low voltage lighting.
"Of course, it is more important to start from the management, at the root of the problem, the specific system is as follows.
Safety management system
(1) the establishment of safety leadership at all levels;
(2) the implementation of quantitative target management;
(3) strengthen safety education and training;
(4) the development of scientific operating procedures;
(5) adhere to the safety inspections;
(6) pay attention to the safety inspection and rectification;
(6) the importance of safety inspection and rectification. p>
(7) Handle accidents correctly;
(8) Establish a safety reward and punishment system.
Civilized site system to create a safe and civilized site activities held, and develop the corresponding system is as follows:
(1) construction site environmental protection management system;
(2) construction site security system;
(3) construction site janitorial system;
(4) staff dormitory management system, the code of civilization for workers;
(5) construction site sanitation and medical system;
(6) construction site fire prevention system;
(7) construction without disturbing the people system.
More about engineering/service/procurement bid writing and production, to enhance the winning rate, you can click on the bottom of the official website customer service free consultation:/#/?source=bdzd