Steps of heatstroke prevention and cooling activity plan (selected 7 articles)

?When going out in summer, you need to protect yourself from the sun and carry heatstroke prevention supplies with you. We are about to welcome a new summer. The scorching heat is also a kind of disastrous weather, which has a negative impact on people's work, life and body. Do you know how to write down a summer heatstroke prevention and cooling plan? For this purpose, I have carefully compiled the following content "Steps of the Heatstroke Prevention and Cooling Activity Plan (Selected 7 Articles)", I believe it will be helpful to everyone. Steps of heatstroke prevention and cooling activity plan (selected 7 articles) Part 1

? 1. The purpose and requirements of the exercise.

?In order to implement occupational health and safety management system standards, respond to potential heatstroke prevention and cooling accidents, ensure the personal safety of employees, clarify emergency rescue procedures, and ensure the orderly implementation of first aid plans, this plan has been specially prepared.

? 2. Basis for preparation.

?1. "Production Safety Law of the People's Republic of China".

?2. "Regulations on the Safety Management of Hazardous Chemicals".

?3. "Guidelines for Preparing Emergency Plans for Work Safety Accidents in Production and Business Units"

?3. Exercise time, location, and participants.

?1. Exercise time: 13:00-13:30 on xx, xx, 20xx.

?2. Exercise location: The area around the 1# stack on the operating side of the production department xx.

?3. Participants in the exercise: exercise leadership group, operation area A, warehouse class A, and package turning team.

?4. Exercise leadership group.

?1. Team leader: xx.

?2. Deputy team leaders: xx (command), xx (organization), xx (organization).

?3. Planning: xx.

?4. Team members: xx, xx, xx.

?5. Rescue equipment and supplies:

?First aid kit (medical alcohol, Rendan, Ten Dishui, Huoxiang Zhengqi water, bandages, disinfectant), communication tools, towels , mineral water, electric fan.

?6. Exercise process:

?1. Crosscut employee xx fell to the ground due to heatstroke while working on stacking #1 (simulating an accident). After the squad leader xx found out, he notified The shift leader is xx.

?2. After receiving the accident report, the operation leader xx immediately reported it to the exercise leadership group, activated the emergency plan, and organized on-site rescue.

?3. xx: While rescuing, isolate and protect the scene, evacuate irrelevant personnel, and protect the accident scene.

? 7. First aid steps:

? 1. Relocation: Operation leader xx organized on-site personnel to quickly carry the heat stroke employee xx to a ventilated, cool and refreshing place to make him stable Lie down, raise your head, and unbutton your clothes, loosen your belt and cuffs.

?2. Cooling: Cover the patient's head with a wet towel and bathe with cold water to speed up heat dissipation. However, do not blow directly on the patient to prevent colds.

?3. Hydration: If the person with heat stroke is conscious and has no nausea or vomiting, he or she can drink salt soda to cool down and replenish blood volume. When replenishing water, do not rush to replenish a large amount of water to avoid causing vomiting, abdominal pain, nausea and other symptoms.

?4. Promote awakening: If the patient has lost consciousness, you can pinch Renzhong, Hegu and other points to wake him up. If breathing stops, artificial respiration should be implemented immediately.

?5. Transfer: Patients with severe heat stroke must be sent to a doctor for diagnosis and treatment in time. During transportation, physical cooling should be carried out as much as possible to protect important organs such as the brain, heart, and lungs. You can use a cold compress on the head, or use medical alcohol to wipe and bathe until the skin becomes red.

?6. Employees with heatstroke slowly wake up after emergency rescue.

?7. After confirmation, the operation leader Yan Wei reported to the exercise leadership group that the on-site exercise of the heatstroke prevention and cooling emergency plan was completed.

? 8. The exercise leading group summarized the exercise and announced the end of the exercise.

?9. Exercise personnel evacuate the exercise location and all units resume operations.

?10. Summarize the problems existing in the exercise and formulate improvement plans.

Steps of heat stroke prevention and cooling activity plan (selected 7 articles) Part 2

?In order to promptly and effectively prevent and deal with heat stroke events caused by high temperature meteorological conditions, guide and standardize health emergency work for high temperature heat stroke events, and protect society In order to protect the health and life safety of the public and maintain normal social order, this plan is formulated as follows:

?1. Earnestly implement the responsibility system for heatstroke prevention and cooling. Relevant units must conscientiously implement a series of requirements on heatstroke prevention and cooling at construction sites. They must take a highly responsible attitude towards the lives and health of front-line construction workers, effectively strengthen the organization and leadership of heatstroke prevention and cooling work, improve and implement the responsibility system, and formulate Contingency plans shall be implemented and preventive measures shall be implemented to prevent workers from heatstroke and various production safety accidents caused by hot weather.

?2. Arrange work and rest time reasonably. We should pay close attention to weather forecasts related to high-temperature weather. Meteorology defines a "high-temperature day" with a daily maximum temperature greater than or equal to 35 degrees Celsius, and a "high-temperature day" for more than five consecutive days is called a "sustained high temperature." Strictly implement the "grasp the two ends and rest in the middle" measures to avoid high temperatures, appropriately adjust the labor and rest system for high-temperature operations in summer, reduce labor intensity, strictly control outdoor operating time, avoid operating during high-temperature periods, and ensure the health and life safety of workers. In principle, if the temperature exceeds 37°C, outdoor work is strictly prohibited from 11:00 to 15:00.

?3. Ensure adequate supply of drinking water on site. Sufficient drinking water, beverages, tea and various soups that meet hygienic requirements should be provided on site to effectively prevent heat stroke and reduce heat stroke.

?4. Strengthen rotation breaks at work. In the summer, according to the construction process, the labor organization should be adjusted as much as possible, and frequent shifts should be adopted to shorten the continuous operation time and strengthen rotation and rest during work. Strengthen on-site inspections, increase the publicity of heat stroke prevention and cooling knowledge and heat stroke first aid knowledge, and improve the safety awareness of all employees.

?5. Actively improve the production and living environment at construction sites. It is necessary to conscientiously implement construction site management regulations, actively take measures to strengthen ventilation and cooling, ensure that construction workers' dormitories, canteens, toilets, showers and other temporary facilities meet the needs for heatstroke prevention and cooling, and provide construction workers with refreshing drinks and commonly used heatstroke prevention medicines. Fans must be installed in dormitories and canteens at construction sites. Units that have conditions should install air conditioners in dormitories.

?6. Implement heatstroke prevention and cooling items. We should pay close attention to the vast number of front-line construction workers who insist on construction in hot weather, strengthen the publicity of heatstroke prevention and cooling knowledge, and require construction workers to carry heatstroke prevention medicines, such as: rendan, cooling oil, Fengyoujing, etc., and implement the heatstroke prevention measures for every worker. Cooling items.

?7. Do a good job of fire prevention in summer. In view of the actual situation that fire accidents are prone to occur due to hot and dry weather in summer, we further strengthen fire prevention measures, conduct regular inspections of flammable places such as power distribution rooms, warehouses, and paint rooms, deal with problems immediately if any problems are found, and equip fire-extinguishing equipment in accordance with regulations.

?8. Effectively carry out health and epidemic prevention work. It is necessary to effectively carry out sanitation and epidemic prevention work at the construction site and living areas, strengthen the sanitation management of drinking water and food, strictly implement the food hygiene system, and avoid poisoning incidents caused by food spoilage; strengthen the monitoring of diseases prone to summer, and on-site workers should Notifiable infectious diseases and food poisoning should be reported to the relevant competent authorities in a timely manner. Steps of heatstroke prevention and cooling activity plan (selected 7 articles) Part 3

?The summer is hot and the temperature is gradually rising. In order to further improve the work of summer heatstroke prevention and cooling, ensure the physical and mental health of employees, improve employees' work enthusiasm and enthusiasm, and ensure the safe, efficient and high-quality completion of various tasks in high temperature environments, the company has decided to carry out summer cooling activities. Now we will The relevant activity plans are as follows:

?1. Activity time

?August 5 to August 10, 20xx

?2. Activity requirements

p>

?1. The department head shall coordinate the arrangements for the cooling activities for the assigned projects.

?2. Each department will promptly deliver heatstroke prevention and cooling items to each project department within a week.

?3. During the event, special attention should be paid to the weather forecast, and event plans should be adjusted in a timely manner to ensure cooling services during key days and periods.

?4. All departments are required to communicate more with the project department employees while sending cool drinks, understand the needs of employees, and convey the company's concern to every employee. Steps of heatstroke prevention and cooling activity plan (selected 7 articles) Part 4

?Due to the high temperature and hot weather in summer, everyone is reminded to take all sun protection and heatstroke prevention measures before going out, pay attention to the adjustment of indoor and outdoor temperatures, and drink more Water to keep your body healthy.

?Meteorology defines a "high temperature day" when the daily maximum temperature is greater than or equal to 35 degrees Celsius, and a "high temperature day" for more than 5 consecutive days is called a "continuous high temperature". If the temperature is too high, the gastrointestinal function of a person will be relatively weakened due to the stimulation of heat, and discomfort symptoms such as heavy head, fatigue, chest depression, loss of appetite, etc. may easily occur, and even cause heat stroke, which is harmful to health.

? When the weather is hot, try to avoid outdoor work or activities under strong sunlight, especially during the high temperature period in the afternoon and for the elderly, weak, sick, and young people; when doing outdoor work or activities, avoid prolonged exposure to When exposed to the sun, take sun protection measures at the same time: wear light-colored or plain-colored clothing, wear a sun hat, a straw hat or a parasol; drink plenty of water, especially salted water, and carry heatstroke prevention medicines with you, such as cooling oil and Fengyoujing. wait. In high-temperature workplaces, enterprises must take effective measures to prevent heatstroke and cool down, strengthen the publicity of workers' knowledge about heatstroke prevention and cooling, reasonably allocate workers' working hours, avoid outdoor work during high-temperature periods, and reduce labor intensity. You can also adjust your diet, drink some mung bean soup, and cook porridge with lotus seeds, mint, lotus leaves, japonica rice, and rock sugar. It is not only sweet and refreshing, but also an excellent heat-clearing and heat-relieving medicine, which can effectively prevent heat stroke and reduce the temperature.

?The scorching heat of midsummer often makes people eat tasteless, sleep poorly, and are prone to symptoms such as dizziness, headache, fatigue, and even nausea and vomiting. In order to spend the summer safely, families should prepare some heatstroke prevention drugs , common medicines and foods are:

?Ten drops of water: can clear away heat and dispel cold. Suitable for dizziness, nausea and vomiting, chest tightness and diarrhea caused by heatstroke.

?Huoxiang Zhengqi Water: It can clear away heat and relieve symptoms. It is suitable for those who suffer from dizziness, abdominal pain, vomiting and diarrhea caused by cold in summer.

? Cooling oil: can clear away heat and detoxify. It can treat dizziness and headache caused by heat, or diarrhea caused by greed for cold.

?Honeysuckle: It has the effects of dispelling summer heat, clearing away heat, detoxifying and stopping dysentery. Use boiling water instead of tea.

?Chrysanthemum: has the effects of relieving heat, calming the liver, and diuresis. It is especially suitable for patients with high blood pressure. Use boiling water instead of tea.

?Lotus leaf: Suitable for people with upset, chest tightness, dizziness and headache caused by heat stroke, especially those with high blood pressure.

?Watermelon: Watermelon is a natural white tiger soup, which has a good effect of clearing away heat and nourishing yin. It is a good drink to relieve summer heat.

?Symptoms of heatstroke and first aid methods

?1. Symptoms of heatstroke

?(1) Premonitory signs of heatstroke: profuse sweating, thirst, headache Fainting, tinnitus, chest tightness, palpitations, nausea, elevated body temperature, and general weakness.

?(2) Mild heat stroke: In addition to the above symptoms, body temperature is above 38°C, flushed complexion, chest tightness, pale complexion, nausea, vomiting, profuse sweating, clammy skin, decreased blood pressure and other respiratory and circulatory failure early symptoms.

? (3) Severe heat stroke: In addition to the above symptoms, symptoms such as fainting and convulsions, dry skin without sweating, and body temperature above 40°C may occur.

?2. First aid measures after heatstroke occurs:

?(1) Quickly move the heatstroke patient to a cool and ventilated place.

(2) Take off or loosen clothes and let the patient lie down to rest.

?(3) Give the patient a salty refreshing drink or cold water containing 0.1%~0.3% salt.

(4) Wipe your body with cold water or alcohol (focus on both armpits and groin) to help dissipate heat.

?(5) Patients with severe heat stroke should be sent to the hospital immediately for emergency treatment.

Steps of heatstroke prevention and cooling activity plan (selected 7 articles) Part 5

1. Purpose:

Entering the midsummer season, the sunshine intensity is high and the high temperature weather continues. In order to effectively prepare for the summer This measure is specially formulated to prevent heat stroke and other types of production safety accidents caused by hot weather to protect the health of construction workers, continuously improve working conditions, and prevent heatstroke and other types of production safety accidents caused by hot weather.

?2. Scope of application:

?This system applies to the xx project department of xx Electric Power Construction xx Company.

?3. Specific provisions:

? (1) Conscientiously implement the responsibility system for heatstroke prevention and cooling.

? Relevant units must conscientiously implement a series of requirements on heatstroke prevention and cooling at construction sites, and effectively strengthen the organization and leadership of heatstroke prevention and cooling work with a high degree of responsibility for the lives and health of front-line construction workers. , improve and implement the responsibility system, formulate emergency plans, and pay close attention to the implementation of preventive measures to prevent worker heat stroke and various production safety accidents caused by high temperature weather.

? (2) Arrange your work and rest time reasonably.

? Pay close attention to meteorological forecasts related to high temperature weather. Meteorology defines a daily maximum temperature greater than or equal to 35 degrees Celsius as a "high temperature day", and a "high temperature day" for more than 5 consecutive days is called a "continuous high temperature" . Strictly implement the "grasp the two ends and rest in the middle" measures to avoid high temperatures, appropriately adjust the labor and rest system for high-temperature operations in summer, reduce labor intensity, strictly control outdoor operating time, avoid operating during high-temperature periods, and ensure the health and life safety of workers. In principle, if the temperature exceeds 37°C, outdoor work is strictly prohibited from 11:00 to 15:00.

? (3) Strengthen rotation breaks at work.

?In the summer, according to the construction process, labor organization should be adjusted as much as possible, and frequent shifts should be adopted to shorten one continuous operation time and strengthen rotation and rest during work. Strengthen on-site inspections, increase the publicity of heat stroke prevention and cooling knowledge and heat stroke first aid knowledge, and improve the safety awareness of all employees.

? (4) Ensure adequate supply of drinking water on site.

? Sufficient drinking water, beverages, tea and various soups that meet hygienic requirements should be provided on site to effectively prevent and cool down the heatstroke and avoid heat stroke events.

? (5) Implement heatstroke prevention and cooling items.

? We must pay close attention to the vast number of front-line construction workers who insist on construction in hot weather, strengthen the publicity of heatstroke prevention and cooling knowledge, and require construction workers to carry heatstroke prevention medicines with them, such as: Rendan, cooling oil, Fengyoujing, etc. , Implement heatstroke prevention and cooling items for every worker.

? (6) Actively improve the production and living environment at construction sites.

It is necessary to conscientiously implement construction site management regulations, actively take measures to strengthen ventilation and cooling, ensure that temporary facilities such as dormitories, canteens, toilets, and shower rooms for construction workers meet the needs for heatstroke prevention and cooling, and provide cooling for construction workers Beverages and commonly used anti-stroke medicines. Fans must be installed in dormitories and canteens at construction sites. Units that have conditions should install air conditioners in dormitories.

? (7) Effectively carry out health and epidemic prevention work.

? It is necessary to effectively carry out sanitation and epidemic prevention work at the construction site and living areas, strengthen the sanitation management of drinking water and food, strictly implement the food hygiene system, and avoid poisoning incidents caused by food spoilage; For disease monitoring, when on-site workers develop notifiable infectious diseases or food poisoning, they should report to the relevant competent authorities in a timely manner.

? (8) Do a good job of fire prevention in summer.

?In view of the actual situation that fire accidents are prone to occur due to hot and dry weather in summer, further strengthen fire prevention measures, conduct regular inspections of flammable places such as power distribution rooms, warehouses, and paint rooms, and deal with problems immediately if they are found , and at the same time be equipped with fire extinguishing equipment as required. Steps of the heatstroke prevention and cooling activity plan (selected 7 articles) Part 6

? It is currently the high temperature season, and the continuous hot and muggy weather has a great impact on people's physical and mental health, especially in production. Workers are physically and mentally fatigued, which can lead to various accidents. Based on the actual conditions of our construction site, we must pay attention to summer protection and minimize the incidence of summer accidents.

?To this end, the project department has established a leading group as follows:

?Team leader: Zhao Xianping

?Members: Mao Jiaping, Liu Longbing, Qu Qinghua, Zheng E, Zheng Ying

? 1. In line with a highly responsible attitude towards the lives and health of front-line construction workers, the leading group effectively strengthens the organizational leadership for heatstroke prevention and cooling, improves and implements the safety production responsibility system during high temperatures, and formulates Contingency plans and implementation of preventive measures to prevent workers from heatstroke and various production accidents caused by hot weather.

? 2. Practically care about the safety and health of front-line construction workers who insist on construction in hot weather, reasonably allocate time, avoid outdoor work during high temperature periods, improve working conditions, reduce labor intensity, and create a good environment. Work and rest environment.

? 3. Ensure that temporary facilities such as construction workers’ dormitories, canteens, toilets, shower rooms, etc. meet the standards and meet the needs of heatstroke prevention and cooling work.

?4. Heatstroke prevention and cooling measures

?1. Reasonably arrange the labor and rest time of workers working in high temperature, reduce labor intensity, shorten or avoid working time in high temperature environment, And ensure that workers working in high temperatures have adequate sleep time.

?2. The construction site and team leaders must continuously supply tea, refreshing drinks and heatstroke prevention medicines.

?3. Properly arrange employees’ rest time and pay attention to the balance between work and rest. If the temperature exceeds 35℃ on that day, the working hours can be appropriately reduced and the workers’ noon rest time can be extended.

?4. Strengthen the management of employee dormitories, provide dormitory ventilation facilities, improve dormitory environmental sanitation, regularly disinfect and prevent mosquitoes, and do a good job in comprehensive environmental sanitation management of the construction site.

5. Prepare some common heatstroke prevention and cooling medicines, such as Rendan, Shidishui, Jieshu tablets, Musk Zhengqi pills, cooling oil, etc.

?6. Establish a medical rescue agreement with local hospitals as a guarantee for medical rescue at the construction site, so as to promptly handle sudden personal casualties on site.

?5. Emergency plan

?(1) Premonition and mild heat stroke

?1. Leave the high temperature environment immediately and go to a cool and ventilated place to rest quietly. And unbutton your clothes to help cool down your body, and give them a refreshing, salty drink as appropriate.

?2. Use Rendan, Ten Dishui, Jieshu Tablets (1-4 tablets), Shexiang Zhengqi Pills, or apply cool oil, and scraping therapy can also be used.

?3. Acupuncture Hegu, Dachong, Dazhui, Fengchi, Zusanli.

?4. People with high body temperature can use cold compress or cold water or ice water to rub the body to help dissipate heat.

?5. Patients with peripheral circulatory failure can be given intravenous infusion of glucose and normal saline.

? (2) Severe heatstroke

?1. Physical cooling: Use cold water (ice water or water with a small amount of alcohol added to the water) to quickly rub the whole body to make the skin red, and add a fan To cool down, put water or ice packs on the head, neck, armpits and groin.

?2. Send to the hospital immediately.

? Sixth, adjust the daily diet, require regular heatstroke prevention and cooling work, be responsible for every employee, and ensure the efficient and high-quality completion of engineering tasks. Steps of the heatstroke prevention and cooling activity plan (selected 7 articles) Part 7

?In order to effectively carry out summer personal safety work and ensure the safety and health of employees in the hot and humid weather in summer, according to relevant documents from superiors, Handan The Public Works Section has formulated a labor protection implementation plan for heatstroke prevention and cooling in the summer of 20xx.

?Deploy specific measures for heatstroke prevention and cooling. There are more high temperatures, hot and humid weather, and thunderstorms in summer, which have a greater impact on workers' occupational safety. They are key points in labor safety risk control. All departments and workshops must follow the "level-by-level responsibility, strengthen leadership, education first, and system guarantee" and "early In accordance with the principle of “planning, early preparation, and early treatment”, we should raise awareness, implement responsibilities, implement personal safety control measures during the summer, and regularly carry out safety warning reminders, safety inspections and heatstroke prevention knowledge education.

? Strengthen the publicity, education and training of employees on heatstroke prevention and cooling safety knowledge.

Led by the Vocational Education Department, with the cooperation of the Safety Department, the Labor and Human Resources Department, and the Party Committee, in conjunction with the Safety Production Month activities, the company will distribute heatstroke prevention knowledge materials, produce summer personal safety bulletin boards, and conduct mobile phone reporting on heatstroke prevention knowledge. The operators should conduct a systematic publicity, education and training examination on safety, health and hygiene protection knowledge against heatstroke, safety measures against collision injuries, electric shock injuries, and limited space operating injuries, as well as on-site emergency response measures and self-rescue knowledge, to ensure the quality of the team. Adapt to and control safety, and improve employees' ability to prevent high temperature risks and protect themselves safely during summer.

? Carry out inspection and rectification of hidden dangers in electrical lines and electrical equipment. Led by the Safety Department, full-time (part-time) electricians from the Handan Comprehensive Machine Repair Workshop and other workshops were organized to conduct a comprehensive, registered inspection of various electrical lines, power tools, power supply box switches, household appliances, leakage protectors and other facilities. Hidden risks discovered during inspections must be promptly filed and registered, rectification measures must be formulated, responsible persons and time requirements must be implemented, and account cancellation and rectification must be carried out immediately.

? Strengthen the organization of summer high-temperature labor production. The Labor and Human Resources Department (Labor and Management) is responsible, and other departments cooperate. The Labor and Human Resources Department (Labour and Management) will issue notices during the extreme weather of high temperatures and hot and humid weather in the summer. According to the characteristics and specific conditions of production operations, while ensuring the quality of work, the summer high temperatures will be adjusted in a timely manner. The operating labor and rest system reduces operations during high-temperature periods, shortens one continuous operation time, increases rest, reduces labor intensity, strictly controls and avoids overtime and overtime, ensures adequate rest, ensures that employees are energetically engaged in production operations, and minimizes Occupational hazards caused by high temperature and heat stroke ensure the health and life safety of production workers.

?Personal safety in the card-controlled electrified section is key. The summer online operations of each workshop strictly implement the requirements and operate according to the regulations. First, walkways and sleepers are prohibited on rainy days, and it is strictly prohibited to take shelter under catenary poles and trees. Second, it is strictly prohibited to use metal pole umbrellas near lines in rainy weather. Third, in thunderstorm weather, operators are strictly prohibited from approaching catenary poles, pull wires, and grounding wires. , it is strictly prohibited to stay under trees or metal components near the catenary (within 5 meters); fourth, when inspecting equipment on rainy days, pay attention to the trees on both sides of the line. When trees are found leaning or dumped on the line, it is strictly prohibited to approach dangerous trees. , to prevent personal injury accidents such as electric shock, smashing, etc., and immediately report to the station and section safety production dispatching command center to take corresponding safety measures; fifth, for rail car loading and unloading operations, the tools used must not be above the head and away from the live parts of the contact network Keep a safe distance of more than 2 meters.

?At the same time, it is required that monthly safety analysis meetings (end-of-quarter safety committees) during the summer vacation should analyze the implementation of personal safety measures during the summer vacation and solve existing problems in a timely manner. Monthly safety analysis meetings for each workshop and team The personal safety situation will be analyzed.