Not subject to qualification review or not obtain the grade qualification certificate issued by the testing organization of the test data, verification reports shall not be used as the basis for acceptance of the completion of the project. Chapter II test room grade standards and duties, tasks Article 5 of the power construction project civil engineering test room is divided into three types: company-type, branch (Agency) type and mixing station type. The company type is divided into three levels, and its level is divided according to the "electric power construction project civil engineering test room level standard" regulations. Article 6 The work of the test laboratory must strictly follow the technical standards, norms and regulations issued by the state and departments related to construction projects. Test personnel should be familiar with the business of the post, and adhere to the principle, faithful to their duties. Article 7 The test room shall undertake the inspection and test tasks and issue test reports according to the business scope approved by the grade certificate. Article 8 The test laboratory shall be responsible for the data and conclusions of the test project. Issuance of test reports must be factual, accurate and reliable data, clear handwriting, and by the person in charge of the test room to review the signature and stamped with the seal of the laboratory. Chapter III qualification certification of testing organizations Article IX accreditation review of the main content:
1. organization and functions
2. staffing and quality
3. test project scope
4. environment and safety
5. instrumentation and measurement management
6. management system
7. technical specifications, standards
7. Standards
8. Technical data and archives
9. Quality Management Article 10 Certification Management Organization:
10.1 The Ministry of Energy Quality Supervision Center of Electric Power Construction Project is responsible for the certification of electric power construction projects (civil engineering) testing laboratory of the overall centralized management.
10.2 Declare the power construction construction company's company-level civil engineering test laboratory, the Ministry of Energy, Power Construction Engineering Quality Supervision Center, the General Administration of the Ministry of Energy to directly organize the evaluation, assessment and certification.
10.3 For the declaration of the second and third level of the company's civil construction test laboratory of electric power construction construction enterprises and the company's subsidiary branches (or Engineering Department) civil construction test laboratory, mixing plant test laboratory, by the network, the provincial bureau of the engineering quality supervision center station to organize the evaluation, assessment and certification.
Review team member list, assessment criteria, assessment and certification results shall be reported to the Ministry of Electric Power Construction Engineering Quality Supervision Center Station for the record. Article XI review, certification procedures:
11.1 Application
Application for certification of the laboratory in the unit on the basis of self-examination, fill out the application form, the unit's higher authorities review and agree to be handed over to the competent certification authority, the formal application.
In the application form submitted at the same time, the following pre-qualification information should be submitted:
1. Laboratory development experience and the current situation.
2. Organizational chart (if the company laboratory, should be submitted in addition to the network of test institutions within the company relationship map).
3. Laboratory layout and instrumentation layout.
4. Laboratory administrative positions responsible for the table.
5. Test personnel registration form.
6. Laboratory responsible for the post certificate of completion of post training (copy).
7. Enterprise measurement level certificate and test laboratory instrumentation inspected measurement certificate (copy).
8. Test business project scope table.
9. List of test instruments and equipment.
10. Laboratory rules and regulations catalog.
11. Laboratory has the relevant technical standards, regulations, norms catalog.
12. Laboratory has been organized and accumulated test technical information, file directory.
13. Laboratory quality management manual (refers to the declared level in the standard requirements of the laboratory).
11.2 pre-trial
The evaluation team to review the pre-trial information provided by the applicant, that the situation reflected basically meets the requirements of the application level standard, it can be considered pre-trial passed, and notify the applicant.
If the pre-qualification information provided is deemed incomplete or does not meet the requirements of the application level criteria in some major aspects, the pre-qualification may be considered unsuccessful. When notifying the applicant, it should point out the items and contents that need to be supplemented or rectified.
11.3 evaluation, assessment
Pre-audit passed by the competent accreditation body to organize the assessment team to carry out on-site assessment of the laboratory assessment, to make a comprehensive evaluation.
Review and assessment, the need for necessary on-site inspections and written tests, oral exams, operation of the random checks, at least one of which is the person in charge of the laboratory.
11.4 Certification
1. Those who have passed the evaluation will be issued by the Ministry of uniform issued by the qualification level certificate, valid for five years. Licensee units in the expiration of six months before the expiration date should apply for re-certification by the competent certification body to assess the verification, qualified for the issuance of a new certificate.
2. In the grade certificate is valid, the competent certification body shall, as appropriate, the laboratory for regular or unscheduled supervision and random inspection. Failure to meet the standard should be rectified within a certain period of time, otherwise, depending on the circumstances of the downgrading or revocation of the certificate of qualification level.