Medical Ability of Shenyang Anorectal Hospital

Shenyang Anorectal Hospital has a building area of 20,000 square meters, advanced anorectal specialized testing equipment and fixed assets of 654.38+300 million. This hospital has 500 beds. According to the construction standard of modern three-level first-class specialized hospital, there are single senior ward, double senior ward, three-person intermediate ward and general ward, and the wards are equipped with central air conditioning system and 24-hour circulating hot water system. The hospital currently has 372 employees, 263 professional technicians, 45 medical staff with deputy senior positions or above, 84 intermediate professional technicians and 0/7 graduate students.