Analyze the workflow of deaerator

The water to be treated is transported to the ejector by the deoxidizing pump, and when the water passes through the ejector with a certain flow rate, a certain negative pressure is formed, and the anoxic gas is sucked in. The water and the oxygen-free gas are fully mixed in the mixing tube, and then enter into the resolver, the oxygen dissolved in the water diffuses into the oxygen-free gas in the resolver system. Oxygen with oxygen from the top of the resolver into the gas-water separator, through the gas-water separator dehydration into the heat exchanger to warm up to about 60 ~ 80 ℃, into the heater, and then into the reactor, and the reactor in the reductant after the reaction of the oxygen-free gas, and then into the next cycle, so as to achieve the purpose of continuous work of the deaerating oxygen.

Installation precautions

1, the equipment only needs a single foundation, it is recommended that the bottom of the desorber is pre-buried steel plate, welded on the spot during the installation; the bottom of the reactor only needs to be horizontal;

2, the equipment is no less than 30cm away from the wall, and the relative position of the equipment can be changed according to the specific situation;

3, the power distribution cabinet is placed on the wall near the equipment, and the power varies according to equipment Model varies;

4, according to the process according to the site conditions of the equipment in place, should pay attention to keep the top of the desorber higher than the highest level of the tank more than 2 meters;

5, the proposed deaerating pump head 45 ~ 50 meters; deaerating pump flow rate should be equipment for the output of 1.25 ~ 1.5 times

6, according to the process of the equipment is connected to the interface in addition to a specific specified to the welding of the best; Equipment and pipelines should be free of leakage;

7, under the premise of ensuring a reasonable process, the equipment can be flexibly arranged, it is recommended to be arranged against the wall or the corners;

8, equipment layout difficulties, can be ejector, desorber gas-water separator and heat exchanger, heating reactors, electronic control cabinets are arranged separately (eg, divided into the indoor and outdoor, on different floors, etc.);