Dongguan City, the construction project construction license for the cost of how many

To handle the environmental impact assessment of construction projects (a) procedures (to the environmental protection department) 1, the construction unit to fill out the "Guangdong Province construction project environmental protection declaration form", submitted to the township and district environmental protection sub-bureau; 2, by the Municipal Environmental Protection Bureau or environmental protection sub-bureau according to the extent of the impact of the construction project on the environment to determine the preparation of an environmental impact report, report form or fill out an environmental impact registration form (pollution projects determined by the Municipal Environmental Protection Bureau, the General projects are determined by the environmental protection sub-bureau); 3. If it is necessary to prepare an environmental impact report or report form, the construction unit itself shall entrust the preparation to a unit with the qualification certificate of environmental impact assessment (before preparing an environmental impact report, an outline of environmental impact assessment shall also be prepared). If the environmental impact registration form needs to be filled in, it shall be filled in by the construction unit itself; 4. The construction unit shall submit the environmental impact report, report form, registration form and outline of environmental impact assessment to the relevant environmental protection department for approval. Projects generating pollution must also provide design plans for pollution prevention and control facilities. For projects approved by the Provincial Environmental Protection Bureau, after the Municipal Environmental Protection Bureau has added the preliminary opinion, the construction unit shall submit the environmental impact report, report form and EIA outline to the Provincial Environmental Protection Bureau for approval. For projects approved by the municipal government, after discussion at the office meeting of the director of the Municipal Environmental Protection Bureau, the preliminary opinion will be added and submitted to the municipal government for approval. Approval of the project by the Municipal Environmental Protection Bureau, the township environmental protection bureau plus the initial review opinion, reported to the Municipal Environmental Protection Bureau Project Approval Section. 5, the Municipal Environmental Protection Bureau received the environmental impact report, report form, EIA outline and related information, the organization of site investigation. The report and EIA outline of the project with more complex environmental issues, and organize expert review and demonstration. The Municipal Environmental Protection Bureau decides whether the construction project is feasible according to whether the project site is in line with the requirements of urban construction and environmental planning, whether it is in line with the requirements of relevant national and local laws and regulations, policies and industrial policies, whether it will cause pollution and ecological damage to the surrounding environment, whether it will generate cross-regional environmental impacts and disputes, whether the emission of pollutants is in line with the relevant emission standards and the total amount of control indexes, and whether the pollution prevention and control facilities satisfy the requirements, and so on. Whether the construction project is feasible or not. If it agrees with the construction, the environmental impact report and report form of the construction project shall be approved, and if it does not agree with the construction, a written reply shall be given. With the approved environmental impact report, report form and registration form, the construction unit shall go to the departments of industry and commerce, foreign trade and economics for other relevant approval procedures of the construction project. (ii) Time Limit for Completion The environmental impact report, EIA outline and report form approved by the Municipal Environmental Protection Bureau shall be approved within 25, 12 and 12 working days respectively from the date of acceptance. The environmental impact registration form and the environmental impact report form of the preliminary examination approved by the township environmental protection sub-bureau shall be within 5 working days from the date of acceptance. Annex VII: The seismic safety assessment of construction projects is required to prepare the "Seismic Safety Assessment Report" through bidding or entrusting qualified seismic safety assessment units and report it to the Seismic Safety Assessment Committee for approval. Annex VIII: The following materials are required to be submitted for pre-approval of land use for new construction projects (to be handled by the land department): 1. Application form for pre-approval of land use for construction projects; 2. Feasibility study report of the construction project (the chapters of site selection and land use should be attached to the report, including the situation of site selection for the project, the scale of the land use, the occupation of state-owned land, the situation of collective land, the proposed type of land to be occupied, the overview of the occupation of arable land, and the compensatory measures, etc.); 3. Land use general planning map; 4, the latest annual land change survey map; 5, planning red line map (urban areas subject to planning permit or project site selection opinion); 6, "Guangdong Province, the use of forestry land use permit" (involving the occupation of forest land) 7, construction unit qualification certificates; 8, other relevant documents. 9, villagers' representatives hearing opinions and proof of payment of funds for land acquisition. The above information shall be reported to the province in duplicate and to the city in duplicate. Approval period: from the date of receiving all the materials, the pre-trial report will be completed within 10 working days. Among them, 5 working days for the Land and Resources Sub-bureau and 5 working days for the Municipal Land and Resources Bureau. Annex IX: for the project project (a) documents and information to be provided (to the Municipal Development and Reform Bureau) 1, general projects are required to provide the following information: (1) project application report; (2) feasibility study report on the project; (3) the owner of the unit's business license and a copy of the corporate identity card; (4) the City Planning Bureau approved the project siting opinion; (5) the City Land Bureau approval of the land use certificate; 2, belonging to the following In the following cases, it is also necessary to provide the following corresponding information: (1) projects that have an impact on the environment, it is necessary to provide the opinions of the Municipal Environmental Protection Bureau on the construction of the project. For example: sewage treatment, garbage disposal, etc.; (2) projects that have an impact on fire safety, need to provide the municipal fire department's opinion on the construction of the project. For example: gas stations, oil depots, gas storage and supply facilities, etc.; (3) For projects stipulating the need for industry management, it is necessary to submit the opinions of the municipal industry authorities on the construction of the project. For example: hotels and tourism infrastructure (Municipal Tourism Bureau), karaoke and dance halls (Municipal Bureau of Culture), saunas, foot baths and health care (Municipal Health Bureau), education (Municipal Bureau of Education), etc.; (4) if it is a gas station, wharf, and some other important government resources and financial investment projects, the municipal government is required to submit consent to the construction of the document; (5) according to the "Guangdong Province, implementation of the" Chinese People's Republic of China * * * and State Bidding Law> Measures" stipulates that the project must be bidding by law, you need to fill out the "Dongguan City, the basic situation of the project bidding form"; (6) reported to the national and provincial approval of the limited project (see the approval authority), you need to provide proof of the project's capital and proof of financing the project. (ii) Approval authority 1, town (district) approval authority: for domestic investment projects, Guancheng, Shilong, Humen three major towns for a total investment of 15 million yuan below (excluding 15 million yuan), the remaining towns (districts) for a total investment of 10 million yuan below (excluding 10 million yuan), the approval of the project is subject to confirmation of the city before it takes effect. If the project must be approved for bidding, regardless of the total investment, it will be reported to the city for approval; 2. City approval authority: domestic investment projects with a total investment of 30 million yuan RMB or less (excluding 30 million yuan); 3. Provincial authority: domestic investment projects with a total investment of 30 million yuan RMB or more. In addition, if it is one of the following cases, regardless of the total investment, it will be reported to the province for approval: (1) Although it is in line with the industrial policy, but the city can not raise funds on its own, or can not balance the conditions of production support; (2) "Guangdong Province, industrial investment policy directory" of the restricted development projects; (3) the national and provincial regulations for the approval of the projects reported. (C) acceptance time limit upon receipt of complete project information, regardless of whether the project approval or not, the Municipal Development Planning Bureau within five working days to give a clear answer, if it is the city's authority for approval, to give approval or confirmation, if it is the national and provincial authority for approval, forwarded to the Provincial Development Planning Commission. Annex X: whether the land for construction projects overburdened mineral resources review and assessment of geological hazards (a) for the land for construction projects overburdened mineral resources review: the need to submit the following materials (in duplicate) (to the Provincial Department of Land and Natural Resources): 1, the application letter (explaining the name of the project and the reasons for the application). 2, the approval of the construction project approval documents (approval of the project approval or the approval of the feasibility study report documents). 3, the construction project Brief description of the project (a brief description of the project, including: project source, project investment, project location, the scope of the request query; for linear projects should be marked with the starting point of the route, the stake point, the route through the name of the place). 4, the construction project site location map (the map should be marked with the latitude and longitude or national coordinates, the project red line, the query scope). (ii) Handling the assessment of geologic hazards of construction projects: it is necessary to prepare the "Geologic Hazard Assessment Report" through bidding or entrusting qualified geologic hazard assessment units and report it to the Provincial Land Office for approval. Annex XI: The following materials are required to be submitted for the "Construction Land Use Planning Permit" (to be handled by the planning department): 1. 1 copy of "Application Form for Planning Land Use (Demolition of the Old and Construction of the New)"; 2. 1 copy of the copy of the approval document of the project by the planning department or real estate authority; 3. 1 copy of the red line map of the selected site; 4. 1: 500 to 1: 1000 topographic map of current status boundaries (the land use position and boundaries of the topographic map of any land use involving the Junction land boundaries, must *** with the official seal of the territory to confirm the boundaries) 1 copy; [with electronic documents] 5, 1 copy of the general plan of the proposed program; (design unit stamped with a map, with electronic documents) 6, the proposed building program map (flat, elevation, section); [with electronic documents] 7, the general plan effect map, along the street elevation, the night effect map, bird's-eye view of the map of each; [with electronic documents] 8, the land board 1 copy of land use pre-approval or related documents of Land Bureau; 9, 1 copy of boundary comparison map before and after adjustment for adjusted projects; 10, 1 copy of approved planning program. (Submitted due to circumstances) Commitment time limit: 15 working days (excluding the city government argumentation)

Remarks: Where copies are required, they must be photocopied on A4 paper and proofread with the original before submission. Annex XII: for the approval of land for construction projects The following materials need to be submitted (to the land department): (a) batch of new construction land for approval of materials: 1, new construction land application report; 2, "Construction Land Project Submission Instructions"; 3, agricultural land diversion program, supplementary arable land program (involving the occupation of arable land), land expropriation program (involves the expropriation of collective land); 4, "General Land Use Planning Map" (marked with red line); 5, "Land Change Survey Map" of the previous year; 6, "Permit for the Use of Forestry Camps in Guangdong Province" (involving the occupation of forest land); 7, "Geological and Disaster Assessment Report" (reported to the State Council); 8, Technical Report on Land Survey and Boundary Demarcation (involving the expropriation of land); 9, Red Line Map for Land Acquisition Survey and Boundary Demarcation (involving the expropriation of land); 10, Digitized Topographic Map; 11, "Land Development and Finishing Planning Map" or "Supplementary Arable Land Location Map" (if it involves the occupation of arable land, it can be marked on the land use general planning map, and if it adopts easy land development to supplement arable land, it may not report this map). (ii) Approval materials for agricultural land conversion for individual projects: 1. Application Form for Individual Site Selection of Construction Land; 2. Instructions for Submission of Construction Land Projects; 3. Feasibility Study Report of the Project; 4. Approval Document for Preliminary Examination of the Land Use of the Construction Project; 5. Approval Document for the Establishment of the Construction Project; 6. Opinion on Selection of Sites for the Construction Project or Planning Permit for the Construction Land Use and Planning Red Line Diagram; 7. General Land Use Planning Map" (partial); 8, digital topographic map (in principle, 1:500; at present, 1:1000 can be used as a substitute); 9, "Land Development and Consolidation Plan", "Supplementary Cultivated Land Location Map" (involving the occupation of arable land in the construction project, the adoption of easy development of supplementary arable land, may not be reported to the map); 10, "Agricultural Land Conversion Program", "Supplementary Cultivated Land Program" (involving the occupation of cultivated land in the construction project), "Land Acquisition Program" (involving the occupation of cultivated land) ), "Land Acquisition Program" (involving land acquisition) and "Land Supply Program"; 11, "Permit for the Use of Forestry Land in Guangdong Province" (involving the occupation of forest land); 12, "Geological Hazard Evaluation Report" (reported to the State Council); 13, Technical Report on Land Survey and Boundary Delimitation (involving land acquisition); 14, Land Change Survey Map of the previous year; 15, Red Line Map for Land Acquisition and Boundary Delimitation (involving land acquisition); 16, Proof of land ownership by the land administration department at or above the county level (involving land acquisition); 17, other relevant documents. Thirteen copies of the above text form materials to be reported to the State Council, four copies to be reported to the province, three copies to be reported to the city, two sets of drawings, and at least one set of all materials to be originals.18. Approval period: no commitment. (C) administrative allocation, agreement to grant land approval: 1, "construction project land application form. (positive, copy, cover and page 1 of the unit seal, legal representative signature); 2, construction project land use questionnaire (unit seal), two copies; 3, business license and legal identity card copy (unit seal), each in duplicate; 4, village representatives opinion (three of these two or more signatures); 5, certificate of payment of land premium for the construction site; 6, bank credit certificate; 7, the village committee and land use Unit signed by the village committee and the land agreement copy (unit seal), two copies; 8, project feasibility report, a; 9, Planning Commission of the project document copy (unit seal), two copies; 10, "construction land use planning permit" copy (unit seal), two copies; 11, planning red line map copy (unit seal), two copies; 12, pre-trial approval copy (unit seal), two copies; 13, Status quo red line map (village and unit in the map of the four corners of the diagonal seal) five copies, two copies of the map. 1 copy;

4, architectural design plans (including general layout) 2 sets (with electronic files);

5, 1 set of perspective drawings; larger groups of buildings shall provide a bird's-eye view; in the city on both sides of the main road or designated road building program shall provide lighting night effect;

6, is a real estate project, real estate projects shall be submitted to the documents;

7, is a re-reported project, shall submit the real estate project;

p> 7, is a re-reporting of the project, shall be submitted to the previous has reviewed the program and approval documents; 8, confirmed by the local Public Security Bureau of the "construction project (building) address details" 1.

Commitment time limit: 15 working days (excluding the time of the city government argumentation)

Remarks: Where copies need to be provided, they must be copied on A4 paper and hold the original to proofread before submission. Annex XIV: human defense construction (to the Human Defense Office for) 1, self-built air-raid basement (1) ground building design plan review, the construction unit with the approval of the planning department of the "Construction Engineering Architectural Program Review Opinion", the master plan and architectural design program to the Municipal Office of Human Defense to apply for the "Dongguan City, the air-raid basement design points," according to the points of the air-raid basement commissioned by the design of the program. (2) After the completion of the air-raid basement design plan is sent to the Municipal Human Defense Office for review, the Municipal Human Defense Office will issue the "Letter of Opinion on the Review of Dongguan Air-Resistant Basement Plan" after the review is passed (among them: high-rise buildings with more than sixteen floors and ground floor area of more than 20,000 square meters, or large-scale projects, a preliminary design review must be carried out) before the construction drawing design can be carried out. (3) After the completion of the construction drawings design to the Municipal Human Defense Office for construction drawings review, the review passed by the Municipal Human Defense Office issued the "Dongguan City, air defense basement construction drawings design review opinion", the construction unit with this document for the application for the "Construction Project Planning Permit" and "Construction Permit for Building Projects" procedures. (4) After the completion of the project to the Municipal Human Defense Office to apply for special acceptance of the air defense basement, acceptance of the acceptance of the comprehensive acceptance of the construction project can only be handled after the acceptance. 2, the air defense basement easy to build (1) the ground after the review of the architectural design plan, the construction unit with the planning department approved by the Construction Engineering Architectural Program Review Opinion, the overall planning plan and the architectural design plan to the Municipal Office of Human Defense to fill in the Dongguan City, the application form for easy to build air defense basement. (2) The Municipal Human Defense Office will handle the approval of the construction fee according to the review of the "Dongguan Air Defense Basement Construction Application Form" and issue the "Air Defense Basement Construction Fee Payment Notice". (3) The construction unit will pay the air-raid basement construction fee to the designated bank with the Notice of Payment for Air-raid Basement Construction Fee, and obtain the receipt for payment of the fee. (4) The construction unit shall go to the Municipal Human Defense Office with the payment receipt to apply for the Certificate of Payment of Air Defense Basement Construction Fee. (5) The construction unit with the "air-raid basement construction fee certificate" to the municipal planning department and the construction department for the relevant construction procedures. Annex XV: declaration of building fire design review (a) declaration of preliminary design fire audit need to submit the following materials (to the Municipal Public Security Fire Bureau for): 1, the general layout of the construction project, layout, building plan, elevation, section; 2, the construction of fire design of building projects, a special section of the description; 3, the preliminary design of the automatic fire protection system. (B) the declaration of building construction plan design review need to submit the following materials: 1, "building fire protection design and fire audit declaration form"; 2, the planning department's opinion ("Construction Land Planning Permit" and the land red line map); 3, a set of architectural design drawings; 4, fire protection design of a special compilation of instructions (including automatic fire protection system). (C) the declaration of automatic fire protection facilities design review need to submit the following materials: 1, "automatic fire protection facilities design fire audit declaration form"; 2, automatic fire protection system design unit's valid qualification certificate and the certificate of conformity of the designers; 3, the relevant fire protection system design drawings; 4, "building construction drawings, design review opinion" copy. (D) declaration of building interior decoration engineering design audit need to submit the following materials: (1) "building interior decoration design fire audit declaration form"; (2) interior decoration design drawings and power, lighting and other electrical wiring layout, air conditioning ducts towards the plan, a set of system diagrams; (3) "construction drawings, design and approval of a copy of the opinion". Annex XVI: for the design of lightning protection facilities need to provide the following materials (to the City Lightning Protection Facilities Testing Institute for): 1, "Lightning Protection Facilities Design Audit Registration Form"; 2, the foundation grounding plan; 3, the surface of the lightning protection plan; 4, elevation (including the east, west, south, north elevation of the four); 5, the general layout of the plan. Annex XVII: for the "Construction Project Planning Permit" need to submit the following materials (to the planning department): 1, "Reporting Form" 1;

2, "Construction Reporting Project Schedule I" or "Construction Reporting Project Schedule II" 1 (respectively, applicable to civil buildings or industrial buildings);

3, declared the project's "Technical Indicators and Functional Situation Sheet" 1;

< p> 4, 1 copy of "Construction Land Use Planning Permit"; 1 copy of planning land red line map; 1 copy of "State-owned Land Use Certificate" or the Land Bureau approval document; (bring the original for verification)

5, "Construction Engineering Architectural Program Review Opinion"; 1 set of approved architectural design plans;

6, 2 sets of architectural drawings (including the general plan), structural construction drawings 2 copies), 1 set of structural construction drawings. Declare the building program shall provide night lighting effect diagrams of the project, shall provide 1 set of construction drawings of the night lighting; [building construction drawings and effect diagrams with electronic files] 7, and provide a general plan, the first floor plan each 1 copy (for placement)

8, "air defense basement easy to build the application for the examination and approval of opinions" or "air defense basement easy to build the certificate of payment," or "the Dongguan City, the construction of the basement construction drawings Design Review Opinion" 1 copy; (check the original)

9, (real estate projects) real estate project documents, "Dongguan real estate development project manual" 1 copy each;

Commitment time: 15 working days Remarks: Where a copy is required to be provided, must be copied on A4 paper and hold the original to proofread the original before submission. Annex XVIII: Handling of "Construction Permit for Building Projects" The approval and management of construction permits for building projects within the administrative area of Dongguan, energy, petrochemicals, manufacturing and other industrial projects and agriculture, forestry, municipal public utilities, environmental protection facilities and other civil engineering works, wiring and piping and equipment installation and renovation works, municipal infrastructure projects, and other construction projects are the responsibility of the Municipal Bureau of Construction.  (A) Application materials directory (to the Municipal Construction Bureau): 1, "Dongguan City, construction project construction permit application form" (a copy);

2, a copy of the construction project planning permit (stamped with the official seal of the construction unit or the owner's private seal);

3, the Municipal Bureau of Construction issued a copy of the record of the contract (construction, supervision) vouchers;

4, the Municipal Bureau of Construction issued a copy of the Housing construction and municipal infrastructure projects construction plan design document review certificate" copy of the record;

5, construction general contractors, professional contractors, a copy of the safety production license (stamped with the official seal of the enterprise, the need to submit the original verification).

6, a copy of the project manager's certificate (stamped with the official seal of the enterprise);

7, has been registered in the town and street planning office where the project is located in the Dongguan City Construction Project Supervision and Registration Form;

8, construction projects to ensure the safety of construction measures for the record information (see the guide to the filing of safety measures for the construction of the construction of the construction of the construction of a guide);

9, "the contract for the purchase and sale of commercial concrete Copy (stamped with the official seal of the construction unit, the original must be submitted for verification) and the commercial concrete company has been for quality supervision of the "Dongguan City, ready-mixed (commercial) concrete production enterprise supervision and registration form" (copy) or apply for the use of bagged cement and on-site mixing of concrete in construction projects to apply for approval of the following information: (1) "the use of bagged cement and on-site mixing of concrete in construction projects application form"; (2) the construction, Construction and supervision units stamped site plan (stamped with the official seal of the construction, construction and supervision units).

10, a copy of the geological survey report of the construction project (in duplicate, stamped with the official seal of the survey unit);

11, a copy of the certificate of insurance for construction accidents, the insurance contract, insurance invoices (the insurance contract should be a clear agreement on the type of insurance purchased, the amount of insurance, the insurance area or number of people, the payment of fees and the agreement to bear the responsibility for the damage caused by the provisions of the original to be submitted to the verification) )

12, a full set of construction drawings stamped with the seal of the review body, a copy of the building construction drawings;

13, is an existing building renovation, addition, alteration, expansion projects are also required to submit the following information:

(1) "change in the nature of use of the house and the structure of the part of the registration form" (a);

(2) the safety of existing building consulting reports and consulting Unit qualification certificate, a copy of the business license (stamped with the official seal of the consulting unit);

(3) existing building construction permit and a copy of the completion and acceptance report.

14, new wall materials special fund, construction project bulk cement special fund, construction project quota determination fee, construction project quality supervision fee payment vouchers original (b) construction projects before the start of construction, should be handled for quality supervision of early intervention, the need to provide the following materials (to the municipal construction quality supervision station for): 1, "Dongguan City, the construction quality supervision of construction projects registration form" (in triplicate.); Can be downloaded online at www.dgjs.gov.cn); 2, a copy of the construction project planning permit; 3, should be bidding for the project issued a copy of the notice of award;

4, construction engineering geological survey report and has been stamped with the review body seal of the construction drawings (one set each); Attachment: a copy of the construction drawings and design documents review of the letter of conformity;

5, construction A copy of the contracting contract; 6. A copy of the supervision contract and supervision plan. (C) Before the construction project starts, safety supervision should be applied for early intervention, and the following materials are required (to be handled by the Municipal Construction Engineering Safety Supervision Station): 1, application form for early intervention; 2, copy of insurance policy, insurance contract, insurance invoice; 3, copy of construction contract; 4, construction drawings; 5, two copies of Dongguan Construction Engineering Safety Supervision Registration Form; 6, proof of civilized construction measure fee (including bank Transfer bill, cash receipts and other proof); 7, a copy of the safety production license; 8, the township safety supervision certificate and number; 9, the project's construction program; 10, civilized construction measures and insurance contracts of the additional terms, including: a clear agreement on the amount of safety measures, payment, earmarked for civilized construction measures, as well as agreed to cause damage to the compensation and other terms. Clearly agree on the purchase of the attached species, the amount of insurance, the cost of payment, and agreed to cause damage to the liability and other terms. The person in charge of A and B signed and sealed. (D), municipal engineering projects before the commencement of construction, should apply for "traffic engineering quality supervision application" to submit the following materials (to the municipal traffic quality supervision station for): 1, application for quality supervision of the project; 2, the project overview list; 3, the project owner's organizational structure and personnel; 4, the supervision unit personnel table; 5, the construction unit personnel table; 6, the project project approval documents; 7, preliminary design Approval documents of project establishment; 7, preliminary design approval documents; 8, ground investigation information; 9, construction drawing design approval documents; 10, construction drawing design review documents; 11, a full set of engineering design drawings; 12, financial audit of the maximum price of the project issued by the document; 13, design bidding documents; 14, a copy of the design contract; 15, practitioners of the unit's credibility, qualification certificates; 16, supervision of the bidding documents; 17, a copy of the contract; 18, supervision of the unit's credibility, qualification certificates; 18, supervision of the unit's credibility, qualification certificates. Unit credibility, qualification materials; 19, Supervision organization composition, personnel qualifications; 20, Supervision work planning, implementation details; 21, Supervision Center Laboratory list of instruments and equipment and personnel composition; 22, construction bidding documents; 23, copies of construction contracts 24, construction unit credibility, qualification materials; 25, organization composition, personnel qualifications; 26, quality assurance system; 27, general Construction organization design; 28, approved by the supervision of the unit works, parts of the project, process engineering division table; 29, site laboratory instrumentation list and personnel composition. (E), water conservancy projects should be handled before the commencement of the "water conservancy and hydropower project quality supervision book" such as the project for the water conservancy project, declared that before the commencement of the project, should go to the municipal water conservancy quality and safety supervision station to fill out the project quality and safety supervision book, for quality and safety supervision procedures. By the quality and safety supervision station of the construction unit to put forward review comments, to determine the form of quality and safety supervision, quality and safety supervision personnel and testing units; approved quality supervision fee. (F), for the "water conservancy project construction license" such as the project for water conservancy projects, should be to the Water Resources Bureau for the "Water Conservancy Project Construction License", for the license to provide the relevant materials: 1, the construction contractor to provide:

(1), a copy of the notice of award (a copy)

(2), the construction unit to be put into the project's technical staff (a copy)

(3), the construction unit to be put into the project's equipment (a form)

(4), construction safety measures commitment (a form) 2, the construction unit to provide:

(1), Dongguan City, Dongguan City, Water Conservancy Project Construction License Application Form (a form)

(2), Dongguan City, Dongguan City, Water Conservancy Project Quality Supervision (a copy)

(3), Dongguan City, a copy of water conservancy project supervision contract (a)

(4), such as planning, land department for planning and land use approval need to provide a copy of the approval (a copy of each)

(5), more than medium-sized projects to provide the relevant project approval and source of funds to provide a copy of the supporting documents (a copy of each) Description: Annexes I to XVIII listed in the contents of the only as a reference, specific operations Should be handled in accordance with the implementation of the relevant provisions of the relevant departments.