Dali State Hospital Medical Core Construction Project Environmental Impact Assessment Public Participation Information First Public Notice

In accordance with the provisions of the Measures for Public Participation in Environmental Impact Assessment (Ministry Decree No. 4), Dali Medical Investment Management Co., Ltd. has commissioned Yunnan Huber Environmental Protection Science and Technology Co.

I. Project Overview

Project Name: Dali Bai Autonomous Prefecture People's Hospital Medical Core Construction Project

Nature of Construction: New Construction

Construction Location: No. 22, People's South Road, Xiaguan Town, Dali City, Yunnan Province (former Yunnan Provincial Dali Health School site range)

Content and Scale of Construction:

The People's Hospital of Dali Bai Autonomous Prefecture was established in 1941. People's Hospital was founded in 1941, located in Dali City, Yunnan Province, No. 35, Renmin South Road, is a set of medical care, teaching, scientific research in one of the three Grade A general hospital.

In order to optimize the allocation of medical and health resources in Dali Prefecture, and to provide better medical and health services for the people of all ethnic groups in the prefecture, under the guidance of the state party committee and the state government's overall requirement of "based on the present, focusing on the long term, scientific planning, and rational layout", it is now proposed to build a new hospital in accordance with the urban planning at No. 22, Renmin South Road, Xianguan Town, Dali City, which was formerly known as the Yunnan Provincial People's Hospital in Dali Bai Autonomous Prefecture. (former Yunnan Province Dali Health School site range) within the Dali Bai Autonomous Prefecture People's Hospital medical core area of the construction. With the goal of creating a leading hospital in the medical center of western Yunnan with "first-class environment, first-class technology, first-class equipment, first-class management and first-class service", and in accordance with the basic design concepts of unified planning, reasonable layout, clear zoning, convenient transportation, convenient management, controllable operation and sustainable development, the hospital is constructed as an energy-saving, intelligent and ecological Grade III-A general hospital. A-class general hospital.

The hospital has a total site size of 78,493.73 square meters (117.74 acres), and a general practitioner training base has been built on the site, with a total construction area of 11,515.21 square meters. This project proposes to carry out the construction of the core parts of the hospital, such as emergency and first aid center, outpatient diagnosis and treatment center, inpatient department, ****health medical and technical center, intensive medical and technical diagnosis and treatment center, scientific research department, conference center, etc., with a total floor area of about 320,000 square meters, and a total of 2,000 beds designed. It is planned to start construction in December 2019 and be completed and put into use after a 3-5 year construction cycle.

Second, the name and contact information of the construction unit

Dali Medical Investment Management Co Ltd

Contact: Luo Yuhang

Address: 22 Renmin South Road, Dali City, Dali Bai Autonomous Prefecture, Yunnan Province (5th floor of the administrative office building of the state hospital)

E-mail: dlzytgs@126.com

Third, Name and contact information of the environmental impact assessment organization?

Yunnan Huber Environmental Protection Technology Co., Ltd

Contact: Fan Lini

Address: 166 Qianfu Road, Xishan District, Kunming, Yunnan Province

Zip code: 650034

Fourth, the environmental impact assessment of the working procedures and work

The working procedures of the environmental impact assessment is divided into three stages: The first stage for the preparatory stage, collect relevant documents, environmental impact assessment of the work of the first public notice, a preliminary field survey; the second stage for the formal work stage, further engineering analysis and investigation of the current state of the environment, and part of the environmental impact prediction and evaluation; the third stage for the preparation of the report stage, the main work of which is to summarize and analyze the second stage of the work of a variety of information, data, and to give The third stage is the report preparation stage, the main work is to summarize and analyze all kinds of information and data obtained in the second stage of work, give conclusions, and complete the preparation of environmental impact report documents.

The main work of the environmental impact assessment of the project includes: through the site investigation and status quo monitoring, to grasp the current state of the environmental quality of the project construction area and the main environmental problems that exist at present; through the engineering analysis to demonstrate the pollution characteristics of the project, accounting for the project's main pollutant emissions; prediction and analysis of the scope and extent of the project's pollution impact on the local environment may be caused by the project to put forward further prevention and control of pollution countermeasures; from the environmental protection of the project to the local environment to prevent and control pollution. Pollution countermeasures; from the environmental point of view on the feasibility of the construction of the project to make a clear conclusion for the higher authorities and environmental management departments for decision-making, construction units for environmental management and design units to optimize the design of their specific projects to provide a scientific basis.

Fifth, the main matters of public opinion

Mainly to solicit the public on the environmental impact of the project, pollution prevention and control measures, site selection and other aspects of environmental protection comments and suggestions.

Sixth, the main way of public opinion

After the information is publicized, the public can download the "public opinion form" to fill in, to e-mail, letter and other ways to feedback comments and suggestions, or directly by phone, face-to-face, etc., with the construction unit or the environmental impact assessment unit to contact, express the project and the environmental impact assessment work opinions. project and the environmental impact assessment work. Please leave your name, address and valid contact information for a return visit if necessary.

VII. Time limit for public comments

From the date of publication of this public notice to the completion of the draft of the environmental impact report, the public can submit comments related to the environmental impact assessment to the construction unit.

Dali State Medical Investment Management Company Limited

September 29, 2019