Detailed process for company registration as well as EIA procedures! What industries need to do EIA,

EIA procedures process: 1, municipal approval projects (1) registration form type projects ① process: Ⅰ. Administrative Office of the environmental protection window acceptance; Ⅱ. Hall and Environmental Protection Bureau staff on-site investigation; Ⅲ. Fill in the environmental impact assessment registration form; Ⅳ. Environmental Protection Bureau to put forward pre-approval opinions; Ⅴ. Municipal Environmental Protection Bureau for approval. ② materials to be provided: project approval, the proposed selection of views, environmental impact assessment documents for approval application, environmental impact assessment registration form. ③ time limit: complete materials are closed on the same day. (2) report form or report type of project ① Procedure: Ⅰ. Administrative Office of the environmental protection window acceptance; Ⅱ. Hall and Environmental Protection Bureau staff on-site investigation; Ⅲ. In the qualification unit to prepare the environmental impact assessment report form or report; Ⅳ. Environmental Protection Bureau to put forward pre-approval opinions; Ⅴ. Municipal Environmental Protection Bureau for approval. ② materials to be provided: project approval, the proposed site views, environmental impact assessment documents for approval application, EIA document text version (the report also requires an electronic version), the report of the project to increase the report assessment of the report, the expert review, expert signature form, the report to modify the list, the registration form for approval of environmental assessment. ③ Time Limit: 15 working days to complete the report with complete materials, and 5 working days to complete the report form. 2. EIA Projects Approved at Provincial Level ① Procedure: Ⅰ. Provincial Environmental Protection Bureau acceptance; Ⅱ. Provincial Environmental Protection Bureau and municipal environmental protection bureau staff on-site investigation; Ⅲ. In the qualification unit to prepare the environmental impact assessment report form or report; Ⅳ. Municipal Environmental Protection Bureau to put forward pre-approval; Ⅴ. Provincial Environmental Protection Bureau for approval. ② materials to be provided: project approval, the proposed site views, environmental impact assessment documents for approval application, EIA document text version (the report also requires an electronic version), the report of the project to increase the report assessment comments, expert review comments, expert signature form, the report of the list of modifications, the registration form for approval of the EIA. ③ Time Limit: 60 working days to complete the report with all the materials, 30 working days to complete the report form, 15 working days to complete the registration form. 3, the EIA organization to compile the environmental impact assessment report form or report Ⅰ. Materials to be provided: (1) the name of the project, the construction unit, the legal person, the approval of the project, the competent department. Project preliminary design specification, project feasibility study or project proposal. Contact person, contact telephone number and zip code. (2) Project investment, scale (annual output, daily output). Project area, floor area. Number of employees, production days, daily working hours, date of commissioning. (3) Product program, product sales price, annual profit, payback period. (4) Geographic location of the plant site: distance from the urban area, orientation, details of the location, the natural environment, social environment and economic conditions of the location of the plant site, transportation conditions. (5) The geographical location of the plant site map, plant general plan, process flow diagram, water balance diagram, material balance diagram. (6) Process flow, list of major equipment, raw and auxiliary materials (unit consumption, annual consumption), sources and storage and transportation) and material balance diagram. (7) "Three wastes" emissions, emission points, emission methods, emissions (t/h, m3/h, t/a, m3/ a). Pollution control measures and facilities. (8) Energy consumption of water, electricity, coal or oil (t/month, t/year, t/h). (9) Volume of discharged wastewater, solid waste discharge, exhaust gas emissions, location of drainage outlets. (10) boiler t / h, supporting dust removal facilities, fan air volume, exhaust diameter, height. (11) the project (the capital technical reform) of the amount of environmental protection investment and its detailed list, environmental protection investment infrastructure costs, operating costs, etc.. (12) Weekly situation of the project site (east, west, south, north), sensitive targets around the project (villages, village orientation, distance, population, number of households, their sources of livelihood, etc.). (13) The main vegetation and coverage of the mountains around the enterprise, whether there are rare animals and plants, places of interest, nature reserves. (14) The original nature of the project site (farmland, mountain, forest, barren mountain, etc.). What functional area the local planning belongs to, and what types of standards are implemented for water, gas and sound. Ⅱ. Processing time limit: 15 working days for the report form and 50 working days for the report. Ⅲ. Charges: "State Planning Commission, the State Environmental Protection Administration on the standardization of environmental impact consulting fees on issues related to the notice" (Planning Price [2002] No. 125).