The use of centralized air conditioning of the building should be set up building equipment management system.
Building equipment management system shall meet the following requirements:
1, should include a comprehensive use of information and communication, computer networks, automation and intelligent technology of building energy efficiency integrated management system, should have the building mechanical and electrical equipment and renewable energy use device measurement, monitoring and control functions;
2, it is desirable to use the centralized control system;
The design elements of the building equipment management system should be in accordance with the Intelligent Building Design Standards GB/T 50314-2006.
Building energy efficiency management system should meet the following requirements:
1, the system composition should include energy information collection, information communication and energy efficiency management system;
2, should be implemented in the energy equipment and system information collection, display, analysis, processing, maintenance and optimization of the management, with real-time, global, systematic and controllable energy efficiency integrated management functions
3. It should be associated with building intelligence integration system, building equipment management system, etc., so as to form the optimal integration of measurement and control, energy saving, energy distribution and economy of energy consumption cost of each energy-using equipment and system.
More about tender writing production, improve the winning rate, click the bottom of the customer service free consultation.