1, residential and conventional commercial building projects: such building modeling is more regular, there are previous mature project design drawings and other resources for reference, the use of conventional 3D BIM design tools can be completed, and such projects are the best choice to set up and exercise the BIM team. Starting from the architectural profession, first master the most basic BIM basic design functions, construction drawings design process, and then gradually from easy to difficult to complex projects, multi-disciplinary, multi-stage and design the whole process of expansion to avoid risk.
2, stadiums, theaters and cultural centers and other complex shape building projects: such buildings have complex shapes, there are no design drawings and other resources can be used for reference, and the traditional CAD design tools of the flat, elevation, section and so on can't express their design ideas. Existing models are not intelligent enough and can only express design ideas at one time, and such projects can give full play to and reflect the value of BIM design. In order to improve the design efficiency, designers should start from the conceptual design scheme design stage, write programs based on BIM design tools, customize tool plug-ins, etc. to complete the heterogeneous design and design optimization, and then carry out the integrated design of pipelines in Revit series.
3, factories and medical and other building projects: such buildings are more regular shape, but the professional electromechanical equipment and piping system is complex, pipeline integration is a design challenge. Can be involved in the construction drawing design stage, especially for general contracting projects, can fully realize the value of BIM design. Due to the different content of the project participants are concerned about, the focus of the application of BIM technology in the project varies, **** the same goal is to better manage the project through the application of BIM technology.