2022 flood control work summary 7 articles

2022 flood control work summary chapter 1

In order to effectively do a good job in 20xx the company's flood control work, to ensure that the production runs normally, to put an end to the occurrence of accidents, the Division I held a timely regular meeting of the safety arrangements for the deployment of the relevant work, a clear flood control requirements and flood season work points, and throughout the flood season in strict accordance with the flood plan to carry out solid work to ensure that all the work goes smoothly. In accordance with the flood plan to carry out solid work to ensure the smooth progress of the work during the flood season. Now the work carried out is summarized as follows:

First, attach great importance to the timely deployment of related work.

In order to further clarify the responsibility to implement the relevant work requirements, our company held a regular meeting in a timely manner to emphasize the importance of flood control work, clear the specific requirements of our flood control work and work priorities. Requirements for each section of the scope of work belonging to the timely development of plant structures, equipment and facilities, process pipelines, water supply network, flood control materials and other aspects of the safety self-check, to do a good job in all flood control and flood preparation work. At the same time, in accordance with the requirements of the work to develop a detailed flood plan, to ensure that the implementation of the work of the process of planning, requirements, goals and guarantees.

Second, strengthen the leadership, the establishment of the organization

According to the head office on the clear flood control organization and members of the duties of the notice of the relevant requirements, in order to ensure that the process is running normally, the user's water safety, the flood season, the work of the smooth and orderly, our timely establishment of the leading group of the work of flood control. Clearly defined the duties of each member, refined the flood control work of each section of the task.

Three, solid work, the implementation of precautionary measures

(a) pay close attention to changes in the quality of water intake, reasonable adjustments to process parameters, to ensure that the water quality of the water to meet the standards.

(b) patrol line staff in accordance with the requirements of the flood control work, in advance of all pipe networks, valve wells for a comprehensive inspection, in a timely manner to see if there is no cover lost or damaged, effectively avoiding the occurrence of security accidents in the summer rainstorms. At the same time, the staff in the daily organization of the pipe network files and pipe network patrol at the same time, to further familiarize with the site valve wells specific location, for the rapid handling of emergencies to lay a good foundation.

(C) production and operation section of the plant before the flood of structures and process pipelines to carry out a comprehensive investigation. And in the daily work to strengthen the patrol, for the maintenance of the rain leakage point for a detailed view, to ensure the safety of the workshop switchboards and equipment. For the workshop with underground structures, prepare sandbags and other emergency items in advance.

(d) The workshop power distribution system for power outage maintenance, the workshop of the main electrical equipment, machinery and equipment for a comprehensive inspection and maintenance, to ensure that a variety of facilities and equipment intact.

(e) Regular flood control materials were carefully verified to ensure that the number of materials is accurate, intact and effective, according to the situation in a timely manner to replenish the equipment, and according to the requirements of the designated cabinet storage.

(F) Regularly check the valve wells and cable trench to ensure that the valve wells without water, cable trench environment dry.

(VII) maintenance personnel regularly on the junction panel, self-pumping and other emergency equipment to do maintenance, to ensure that in the event of an emergency can be used normally.

(h) Flood season in strict accordance with the requirements of flood control work, the implementation of 24-hour duty system, and do a good job on duty during the flood season necessary communication and reporting, supervision and inspection, coordination and processing work.

Fourth, strengthen the management of the flood season, do a good job of safety inspection

(a) During the flood control period will be included in the weekly organization of the safety and health inspection?

Check in, timely verification of materials equipped and stored.

(b) In the case of rainfall, the office building and workshops in a timely manner to carry out a comprehensive view, to ensure that the structures are not leaking, waterlogging.

(c) In accordance with the unified deployment of the head office, actively carry out special self-examination of flood control. Flood control work carried out during the period, our company through active publicity, extensive mobilization, enhance the majority of cadres and workers of the security responsibility and awareness of flood control. Through the strict implementation of the plan, solid work to ensure that the flood production and operation of normal, safe water supply, the work of smooth and orderly.

2022 flood control work summary chapter 2

Since entering the flood season this year, the form of flood control is increasingly severe. And persistent high temperature and hot weather in order to minimize or eliminate the main flood season in the construction may occur flood emergencies or accidents caused by the loss, according to the national "National Emergency Public **** Events Overall Emergency Response Plan", "Flood Control Act", "Flood Control Regulations" of the relevant provisions of the relevant provisions of the company's flood control system, combined with the construction project this year, the flood control situation facing the project, my project analysis of engineering flood control Safety form, the key parts of the flood control preparations and flood construction plan arrangements, the development of practical flood control and hot weather construction measures, now on the flood control work is summarized as follows:

A guiding ideology and objectives

The guiding ideology of the flood control is: to implement the safety first, unremitting and prevent the main full strength of the The policy of the rescue. Strengthen the sense of responsibility for flood control, based on flood prevention and flood resistance, early planning and early arrangements, flood control focus, pay close attention to the weak links, and effectively do all the preparatory work.

The basic goal of flood control is to ensure construction safety, construction quality on the basis of advancing the construction of the project in an orderly and smooth progress, to ensure that the project is safe for flooding, no safety accidents.

Second, the preparation of the flood control plan and the implementation of emergency rescue drills

The project department to prepare the flood control plan for flood control needs, the organization of emergency rescue drills and at the same time, for the deficiencies in the drill, and the flood control plan to modify and improve, to lay a solid foundation for the safety of the flood.

Third, the development and improvement of flood control and flood control work plan and measures

1, build the flood control organization, the implementation of the duties and responsibilities, the establishment of flood control duty. Formation of flood rescue teams, and related knowledge education and training.

2, for the unstable parts to strengthen the safety monitoring work.

3, according to the design requirements to complete the flood control construction.

Fourth, equipment and material security

1, seriously implement the requirements of the flood control work, do a good job of material and equipment management preparations;

2, the establishment of emergency supplies, equipment accounts, do a good job of the organization of the implementation of the work of flood control, implementation of the personnel implementation, implementation of the material implementation, implementation of the measures;

3, the establishment of the position of flood control Responsibility system, flood duty, pre-flood inspection, reporting system, flood control materials management system, etc.

V. Increase flood safety inspection efforts to implement the flood control measures to carry out special safety inspections.

Flood project department always construction safety management and flood control work together, the construction team to check the important dangerous parts of the arrangement of special people regularly patrol check.

In short, the project department conscientiously fulfill their duties and actively implement, and successfully complete this year's flood control and flood control tasks, but there are some shortcomings, will be corrected in the future work.

2022 Flood Control Work Summary Part 3

City Water Bureau, Flood Control Command on the seriousness of flood control and flood control notice issued, the town's flood control and flood control work in the municipal water bureau, the municipal command of the unified leadership of the relevant departments of the active cooperation and strong support, through more than half a year of painstaking and unremitting efforts to better Completed this year's flood control work of the various tasks. The work of the six months, we focus on the following five aspects.

First, the leadership attaches importance

After the notice was issued, the town government attaches great importance to this, and quickly put this matter on the agenda, and set up the town of x flood control leading group command, the mayor of the town personally served as the head of the group, the work of the flood control and flood control arrangements, members of the leading group also includes the flood control and flood control work of the leadership of the water conservancy, and the head of the key. Station chief and other backbone. The establishment of the leading group, to carry out flood control work to provide a reliable organizational guarantee.

Two, strengthen the publicity

In order to fully do a good job of flood prevention and control work, we pay great attention to improve the town's cadres and the masses of the awareness of flood prevention and control. Since the issuance of the notice, we have strengthened the publicity of the "Flood Control Law", from the study of the law, publicize the law, the implementation of the law and other aspects of the implementation of the "Flood Control Law" to strengthen the flood control and flood control publicity and education, the legal norms into the vast number of cadres and the masses of the people's conscious action, to enhance the awareness of all the people's flood control according to law, and vigorously promote the law of the flood control, the law of the work of the water.

Three, safety inspection

After the establishment of the flood control and flood prevention leading group, we quickly study the deployment, set up a specialized team responsible for the town's safety inspection. Under the unified leadership of the municipal level, we mainly carried out a comprehensive inspection of the flood control row station, as well as factories, villages and dangerous housing activities, found that the problem immediately take measures, in the problem solved before the flood disaster, to do before it is too late.

Four, material implementation

We strictly in accordance with the requirements of the higher level, grasp the material reserves. After the notice was issued, we quickly carried out a comprehensive inventory of the town's flood control materials, the insufficient part of the timely replacement, damaged and deteriorated as soon as possible replacement.

Fifth, the river check

We organized a large flood control inspection team, the town's river one by one over the hall, a comprehensive inspection. Problems found in the inspection, mainly peanuts affecting the smooth flow of water, are clearly responsible for the unit, a deadline to deal with the timely elimination of hidden dangers and weaknesses, to solve the more difficult but important issues affecting the safety of flood control, the adoption of temporary security measures. Through the town of small and medium-sized rivers comprehensive rectification activities, the river has been unimpeded, for the diversion of flood discharge provides an effective guarantee.

x years of flood control and flood control work has come to an end, but flood control and flood control work is not far from the end. In the future, we will continue to work in accordance with the overall deployment and requirements of the higher levels, from the practice of the "Three Represents" the important idea of the height of early mobilization, early deployment, layer by layer inspection, pay close attention to the implementation of the work, do not let up and do not stop, and always pay attention to unremittingly, and without compromise to the work of the flood control and flood control work as a long-term work to grasp to achieve the rule of floods according to the law, According to the law of water management, for the development of economic and social undertakings to provide a favorable environment.

2022 flood control work summary chapter 4

My school's flood control work in the county Transportation Management Office of the unified leadership, in the relevant departments of the active cooperation and strong support, through four months of hard and unremitting efforts to better complete this year's flood control work of the various tasks. Reviewing the work of the past few months, we focused on the following aspects.

First, attach great importance to the careful deployment

Driving school leadership attaches great importance to the flood safety training work, this work is listed as an aspect of the agenda of the office meeting is a weekly meeting of a problem must be spoken. Communicate in a timely manner to the higher authorities on the Department of Defense, flood control work instructions, put forward the implementation of the views of the establishment of a safety section of the flood safety leading group, a serious analysis of the impact of the summer flood season on the driving, a clear target responsibility, put forward the "awareness and then improve the measures to refine the management of the work in place again on the implementation of" the requirements of the leading group, the establishment of the summer flood season for the purpose of the work of the school. Requirements, the establishment of the leading group for the development of flood prevention and flood control work provides a reliable organizational guarantee. Improve the ability to prevent, without a personnel in the Department and drowning accidents, to ensure the smooth progress of the summer safety production.

Second, increase publicity, awareness

In order to fully do a good job of flood prevention and control work, we pay great attention to improve the awareness of all employees flood prevention and control. Since the issuance of the notice, we have strengthened the publicity of the "Flood Control Law", from the study of the law, publicize the law, the implementation of the law and other aspects of the implementation of the "Flood Control Law" to strengthen the flood control and flood prevention education, the legal norms into the majority of employees of the conscientious action to improve the awareness of the flood control according to the law, and vigorously promote the work of the flood season.

Third, seriously carry out the flood inspection

After the establishment of the leading group of flood control work, we quickly study the deployment of the establishment of a specialized team responsible for driving school safety inspection. Under the unified leadership of the principal, we mainly carried out a comprehensive inspection activities of vehicles, training site facilities, various sections of the circuit, warehouses, oil depots, substation rooms, found that the problem immediately take measures, the problem is solved before the flooding, to do before it is too late.

Four, the implementation of the flood control team, with sufficient flood control materials

seriously implement the rescue and relief transportation vehicles and personnel organization, set up by the business backbone of the various sections of the emergency rescue team. The rescue and relief vehicles to do a rapid assembly, the rescue and relief personnel, material transportation, to do without conditions, without discounts, how many transport, where the need to be transported to where required. And grasp the material reserves, after the notice was issued, we quickly on the driving school of flood control materials for a comprehensive inventory, the lack of part of the timely replacement, damaged and deteriorated as soon as possible replacement.

Fifth, strengthen the awareness of flood control, to ensure that nothing is lost.

Driving school focuses on improving the staff's awareness of flood control in the first place, to do a good job of long-term flood preparedness, to maintain a high degree of vigilance, to overcome the paralysis, based on the flood control, in accordance with the requirements of the contingency plan, everyone is well-prepared to follow the orders of the command, to keep the contact open to ensure that the order, can be pulled out of the way, go, do a good job.

Six, further revised and improved all kinds of flood control plans

Further revised and improved all kinds of plans to further improve the ability to prevent and deal with large floods.

2022 Flood Control Work Summary Part 5

Summer is approaching, the flood season will come. In order to conscientiously implement the higher flood control work instructions, to ensure that teachers and students and school property is not lost, so that "prevention is better than cure", specifically organized manpower on the school's flood control situation to carry out a comprehensive self-inspection of the net. Now the self-check situation is reported as follows:

A self-check of the school's flood control leadership and emergency rescue team system

The school has set up a leading group of flood control and safety work, set up a flood control and emergency rescue team, the implementation of the relevant responsibilities; to achieve the leadership, organization, and coordination of the unified command, there is a responsibility. Arrangements are as follows:

1, members of the leadership group:

Group leader: Tian Bing

Deputy leader: Yin Kai

Members: Zou Zhiming Wu Chunmei He Zhengping Shi Junfen Zhao Guohua Zhu Zhenxian Zhou Kaifu Tan Zhaoshan Nie Yuansheng Zhao Jiubi Rao Weiyan

2, the specific functions of the responsibility:

The leader of the group Tian Bing as a general director of the flood control emergency rescue: responsible for the unified scheduling and command of the overall flood control and emergency rescue. The head of the group, Tian Bing, is the general director of flood control and rescue: he is responsible for the unified scheduling and command of the overall flood control and rescue work.

Deputy head of Yin Kai as deputy commander-in-chief of flood control and rescue: in the event of danger, mobilization of the emergency rescue team, subdivided into the management of students, directing the classroom teacher for specific situations, timely measures to protect the safety of students.

Nie Yuansheng, head of the logistical support team: specifically responsible for the preparation and deployment of supplies during the flood season as well as the pre-flood flood inspection work, to ensure that before the flood occurs, the rescue tools, spare supplies are in place, and sufficient. In the event of danger, specifically responsible for the school entrance, drainage ditch flood dredging work to reduce the flood water does not enter the school door.

Second, self-checked the various flood control facilities

In order to ensure that the flood season does not occur dangerous, the principal of the organization of the relevant personnel of the school throughout the various parts of the safety inspection.

1, checked the safety of the school building, after checking, the situation is normal, no security risks.

2, checked the school's electrical facilities, power supply and indoor and outdoor electrical wiring, the results are intact, no security risks.

3, checked some of the campus facilities, drainage channels, found that some of the drainage channels on campus can not be normal drainage. There are security risks.

4, outside the rear fence of the school, the Songhui highway can not be drained, when it rains, the highway drainage flows directly to the school, resulting in the school fence faces collapse, there are serious safety hazards.

Third, self-checked the system, emergency plans and communication network

In order to strengthen the responsibility and ensure smooth communication during the flood season, our school revised the relevant system, clearly defined the relevant responsibilities; the development of a flood safety emergency plans to prepare for the flood season when the danger occurs, the school has developed a lightning storm to explain the evacuation of the plan, in accordance with the emergency plan in the Layout requirements, the effective implementation of risk management work; each class has established a teacher and students (parents), the school and parents phone, to ensure that the flood season communication is smooth, to ensure the safe evacuation of students.

Four, strengthened the teachers and students flood safety education

Make full use of the teachers and students assembly, blackboard newspaper, the theme of the class meeting in a variety of forms, the students carried out a drowning, lightning, storm, emergency escape and other aspects of safety education, so that the students to understand and grasp the general knowledge of flood safety. Combine the daily emergency evacuation drills with flood evacuation to improve students' self-protection awareness and preventive skills to ensure flood safety.

In short, through this self-check, our school from all aspects have done a good job of flood control and risk management work to ensure that the flood season does not occur.

2022 Flood Control Work Summary Part 6

To implement the May 21st region-wide flood control work conference, under the correct leadership of the company's leadership, serious arrangements for the deployment, the implementation of the flood control work plan, and seriously carry out the investigation of potential safety hazards, the development of countermeasures, and at the same time, strengthen the supervision and inspection of flood control work. Now the 20xx flood control work is summarized as follows:

First, the establishment of a sound flood control mechanism, the full implementation of the responsibility

In order to effectively grasp the work of flood control, the company set up a factory director as the leader of the various department managers as vice-chairman of the departments responsible for members of the. Flood control inspection team, a comprehensive deployment of the flood control work during the flood season focus, clear responsibilities and tasks, and issued a flood control work notice. Departments and according to the spirit of the meeting developed a flood control emergency plan, developed a flood control duty system, made preparations for flood control materials, equipment, and according to the union four situations and the nature of the work of the procurement of the appropriate spare parts. Each workshop carried out a comprehensive safety inspection of the hidden dangers found in a timely manner to rectify, and in the flood season before the arrival of all rectified.

Second, strengthen the safety education and publicity training, improve the awareness of prevention and flood control

In order to ensure the safety of the flood season, combined with the actual situation of the company, the organization carried out a pre-flood, flood season safety inspections, strengthen the transport management source inspection, secondary maintenance, personnel qualifications, licenses, vehicle technical condition, practitioners of whether or not on the Safety hazard awareness has been improved, the annual flood season, but also the hot weather, the phenomenon of spontaneous combustion of the vehicle occurs frequently, whether the driver attaches great importance to this, to strengthen their own vehicle inspection and other checkups. Throughout the flood season, the Department of Safety and Environmental Protection led the company's safety facilities for inspection, which identified 5 fire extinguishers failed, the organization staff in a timely manner on the 5 fire extinguishers to replace the configuration. On the inspection of the existence of irregularities in accordance with the provisions of the operation of the violation of penalties, the implementation of security risks rectification, and make every effort to grasp the work of production safety, up to now, in the "flood season" the company did not have a security incident. In addition, the company also often send flood safety knowledge to employees through SMS, flood safety work rooted in everyone's brain.

Three, a solid job of flood control to ensure the safety of the flood

1, do a good job of the pre-flood inspection

From the beginning of June, the inspection team on the entire plant and office area for a comprehensive pre-flood safety inspection, the inspection of the combination of self-checking and spot-checking, the first department of the scope of the jurisdiction of the self-checking, inspection team of the important areas of the spot-checking, the inspection team to take a few minutes, and the inspection team to take a few seconds. The team took a sampling of important areas, while increasing the intensity of the inspection.

2, do a good job of hidden trouble rectification

Each inspection of the problems found in the weekly production safety meeting to be put forward, and timely organization of personnel to rectify the hidden trouble, rectification is complete, the inspection team and then the hidden trouble rectification review, to ensure that the hidden trouble rectification in place.

3, do a good job of revising and improving the flood control plan

In order to further improve the flood control command system and work procedures, and constantly strengthen all levels and departments of the responsibility of flood control, in accordance with the requirements of the company, combined with the actual situation of the company, the preparation of the flood control plan and improve.

4, a good reserve of materials and equipment in order to effectively do a good job of flood control, the company in the plant and office area after a comprehensive inspection, verification of warehouse storage materials, the preparation of the procurement plan for spare parts, and timely procurement, to provide a guarantee of flood safety.

5, do a good job of flood control duty

(1) the leadership team every day to arrange duty, to ensure that after receiving the flood control duty call can be the first time to notify the project department all employees to emergency rescue.

(2) plant every day to arrange for three people on duty, every 12 hours to change the system, to ensure that in case of emergencies can be rushed to the scene in the fastest possible time and notify the leadership on duty, especially in thunderstorms, increase the frequency of inspection, but also to do the preparatory work ready to go.

With the end of the flood control work, the company seriously summarized the flood control work to ensure a successful conclusion of the flood safety work.

2022 flood control work summary chapter 7

Since this year, the flood control work in my district in the district party committee, district government and the higher authorities attach great importance to the correct leadership, adhere to the combination of the benefits of the combination of the open source and reduce the flow of water and drought prevention, and to accelerate the realization of the control of floods by the flood management to the flood management changes from a single drought to the overall drought change, adhere to the "drought", and to the "drought", and to the "drought". Drought change, adhere to the "prevention-oriented, combined with storage and drainage, scientific scheduling, all-out rescue, safety, more water storage" approach, adhere to the "limited guarantee, unlimited responsibility" principle of flood control, from the worst place to think, to the most beneficial efforts.

We are closely focused on the focus of the flood control work, seize the "flood control responsibility system, engineering construction, flood control plans, rescue teams, rescue materials," the five key links, to achieve six outstanding. At the same time, we adhere to both flood control and drought control, flood control to ensure safety, drought harvest. Ensure the lives and property of the people in the region to promote the sustainable development of the region's social and economic security. Now summarized as follows:

Awareness-raising, advance planning, flood control preparations in place in advance

According to the National Meteorological Administration predicted that this year, our region is in the Central Weather Bureau forecast in the northern part of the rainy belt within the scope of the actual situation, we renewed the concept of adjusting the idea, to determine this year's guiding ideology of flood control work: insist on In addition to the combination of pests and benefits, open source and concurrently focus on flood control and drought relief, and realize the change from flood control to flood management. The implementation of the "construction is more important than prevention, prevention is more important than grabbing, grabbing is more important than saving" approach to mobilize the whole society, actively prepare for floods, in case of floods within the design standard to ensure safety, to ensure that the main river embankments do not break, in case of floods exceeding the standard measures to ensure that the floodplain does not die, and to do our best to minimize the disaster.

First, since the beginning of April this year, the Water Affairs Bureau has deployed professional and technical personnel on the region's "four rivers", "four dykes", sixteen backbone channels, 26 gates and culverts, pumping stations and a rubber dam, 115 bridges were comprehensively inspected, and will be The problems identified were registered by river and township, and the tasks were clarified, responsibilities were realized and solutions were proposed. Also on the basis of full investigation and research to draw the first ever flood control project map in our region. Second, at the beginning of May, adjusted the flood control headquarters leading organizations, for the early convening of the region's flood control work conference to do all the preparatory work. Third, held a district-wide township offices, district departments to participate in the region's flood control work conference, this year's flood control work has been fully arranged and deployed. At the same time, the use of radio, television, newspapers and other forms of extensive publicity, so that the majority of cadres and masses of the severe situation of this year's flood control work has been fully aware of the situation and understanding, in order to improve the region's flood control, disaster preparedness for the full ideological preparations.

Two, detailed arrangements, careful deployment, flood control plan revised in place

We in accordance with the flood control, flood resistance, grab a big danger, save the requirements of the disaster, in order to ensure that the flood control plan to do fine, do, make it more operable. First, according to the actual situation in our region, with reference to the province, the city of the relevant information, re-revised and improved our region, "Flood Control Plan", on the territory of the region's major rivers, low-lying flood-prone areas and urban areas of the basic situation, flood control tasks, problems one by one to analyze and clarify. Second, the development of the river and the Busan East Stagnant Flood Zone in a variety of states under the implementation of the flood control program, clear a variety of flood states under the defense measures. Third, the development of flood control measures for flood control and Busan District flood control measures. Fourth, the state of various rescue teams, rescue materials for the fixed point, fixed section, fixed line arrangement, the task and responsibility of the implementation of the person level by level, so that the prevention of preparedness, rescue measures, stationed in a place, eat a supply, retreat route.

Three, in addition to reinforcement, careful construction, flood control project construction in place

In order to ensure that the flood control project to play a role in the benefits of our region, high standards, high quality to complete a number of water conservancy project construction. First, in accordance with the requirements of the municipal defense index, the main flood season before the arrival of high-quality on schedule to complete the river right dike dike in addition to reinforcing the project, eliminating the section of the flood control hazards; the second is the district management seat of the gate culvert pumping station and other machinery and equipment overhaul, oiling work; the third is to assume responsibility for the city's main leaching task of the East Busan flood control station for the test run; invested more than 600,000 yuan on the damage is serious, a direct risk to the city's safety of the locks carried out Maintenance and replacement, equipment maintenance; five is the "three rivers", "four dykes", sixteen backbone channels of various diseases and problems were dealt with.

Among them, the Busan New River around the embankment crossing ramp processing 42, fill 86 wolf nests, rat holes, the Busan River around the embankment of 43 dangerous sections, 6,850 meters, the Busan River around the embankment to fill in the dike ridge and ditch 16, dealing with the crossing ramp at 8, a total of **** move 19,368 cubic meters of earth. In accordance with the "Flood Control Law" "who set up barriers, who removed" provisions, *** removal of straw stacks 396.

Emergency measures have been taken to deal with the dangerous work, dangerous sections and so on. In the construction process, the governor, vice governor and other personal visits to the construction site to supervise and guide, and gave a high evaluation. The completion of these projects above, for the region's flood control and security provides a reliable engineering guarantee.

Fourth, unity and cooperation, coordination and linkage, rescue teams in place

In order to ensure that the flood emergency dikes do not break, we have arranged 90,000 people of the flood control rescue team, of which 8 rescue team 16,000 people, 8 standing team 68,000 people, 2 reserve team 0.4 million people, standing flood workers 280 people. In addition, the district also organized a 20xx mobile team, the Armed Forces Department organized a 200-person rescue commando and 500-person reserve team to undertake key sections of the river project rescue protection. Ensure that once the flood occurs, are able to pull out, rushed on, top, winning the battle, to ensure that the region's flood control work foolproof.

Fifth, multi-faceted financing, pay close attention to the implementation of the flood control materials reserves in place

We prepared last year's material on the basis of this year and the number of varieties of emergency materials, such as the number of substantial adjustments and improvements. In order to ensure that the flood control materials in place, the townships and townships, the relevant units have been assigned the task of item-by-item implementation in place, and item-by-item registration, pricing registers, to achieve a fixed number of fixed location, set a person responsible for the "three" responsibility system, the whole region **** reserve stakes 24,000, 400 tons of straw, woven sacks, straw bags, sacks, 600,000 pieces, Thatch 60, reed mat 9300 collar, 26 tons of wire, planks or door 20,000, 20,000 trees, masonry 5000 square, 100 tons of diesel fuel, the size of the vehicle 9000 sets (sets), 105 boats, lighting equipment 8950 sets, cables, wires, 28,000 meters and sufficient life, medical supplies, etc., to ensure that the flood control and rescue can be transported in time and in sufficient quantities to the place of the rescue.

Sixth, strengthen the leadership, sound organization, the implementation of the flood control responsibility system in place

After the district party committee, the district government decided to adjust the composition of the Flood Control and Drought Relief Command. Responsible for the leadership, organization and coordination of the region's flood control work. Secretary of the district party committee as a political commissar, the district mayor as the commander, executive deputy mayor as executive deputy commander, the district party committee, the district government and the relevant departments of the district comrades in charge of the command department members.

The townships and offices, units have also established a corresponding flood control command structure, and the implementation of the party and government responsible for the overall responsibility of the four kinds of responsibility: First, the district according to the administrative jurisdiction of the implementation of the party and government responsible for the overall responsibility of the hierarchy, signing a certificate of responsibility at all levels, which level of problems, which level of the party and government responsible for the responsibility of a person; Second, the four sets of district leading members of the leadership to lead the district departments to package the responsibility of the townships; Third, the main district-level leading cadres to package rivers, dikes, dikes, and other relevant departments responsible comrades. The main leader of the cadres package river, package embankment, package defense line responsibility system; four is the district government deputy director of the government according to the division of labor package line, package system, package unit responsibility system, really to do the forbidden, the task is clear, the responsibility is in place.

Seven, review the situation, and actively combat drought, to win a comprehensive victory in flood control and drought relief

I area this year's flood season precipitation into the September rainfall decreased significantly, in the face of drought we early planning, early work, the timely development of strong measures, the organization's technical staff to analyze the situation of drought and rainfall, to guide the farmers to make full use of the pipeline transmission of water, small borders of irrigation, We organized technicians to analyze drought conditions and rainfall, and guided farmers to make full use of pipeline water transfer, small-border irrigation, sprinkler irrigation, drip irrigation and other water-saving irrigation techniques to enhance drought prevention capabilities. At the same time, the timing of the situation, the camera water storage, in a timely manner to grasp the local and upstream flood conditions, rain conditions, scheduling of the river gates shut down water storage. At present, the river *** storage of more than 13 million cubic meters of water, providing farmers with sufficient irrigation water, so that the drought is reduced to a minimum.