Metal Chip Briquetting Machine of Briquetting Machine

Metal Chip Briquetting Machine is mainly used to cold press metal raw materials such as cast iron chips, steel chips, copper chips, aluminum chips, high-quality mineral powder and other metal raw materials directly through high pressure into a cone or other shapes of 3 to 6 kilograms of cake blocks, so as to facilitate the storage and transportation and to reduce the loss of transportation and smelting in the process of recycling and reuse.

Model classification:

This series of equipment is divided into vertical and horizontal models.

Vertical model is now widely used in the promotion of models, designed for large tonnage, large output, a wide range of applications; Horizontal model due to the main cylinder placed horizontally, seals due to the effect of gravity, the design pressure increases, the seals are unbalanced by the local wear and tear of the larger use of the metal chip briquette machine vertical model

Life is greatly weakened, and can not meet the requirements of the large output of long-term continuous use, mostly used in small tonnage machine, and the use of the machine is not enough. It can not meet the requirements of long-term continuous use of large production capacity, and is mostly used in small tonnage models (design pressure should not exceed 2000KN), with a smaller range of applications. Acceptance and handover of equipment installation works.

(1)The construction acceptance of the equipment foundation is carried out by the quality inspector of the construction department together with the civil construction worker, and the construction acceptance form is filled in. The construction quality of the foundation must comply with the foundation plan and technical requirements.

(2) the final acceptance of the equipment installation project, after the equipment commissioning qualified. By the equipment management department and process technology department together with other departments, in the installation, inspection, safety, use and other aspects of the relevant personnel *** with the participation of acceptance, to make identification, fill in the installation and construction quality, precision inspection, safety performance, test run records and other vouchers and acceptance of the transfer of the single signatures of all parties involved in the acceptance of the completion of the personnel.

(3) equipment acceptance for handover procedures

Equipment acceptance (or equipment installation and handover acceptance form), equipment operation test records signed by all parties involved in the acceptance of the equipment and technical documents brought with the equipment, by the equipment management department into the equipment file management; with the equipment accessories, spare parts, should fill in the spare parts inventory list, sent to the equipment warehouse storage and storage. Safety management department should be archived on the safety issues in the installation test.

(4) equipment transfer is complete, signed by the equipment management department of the equipment put into operation notice, and copies were handed over to the equipment management department, the use of the unit, the financial sector, the production management department, as an archive, notification of the start of the use of fixed asset management vouchers, assessment of the basis of the project plan.