Engineering title self-appraisal 5
Normally speaking, self-appraisal that is self-summary, self-appraisal can summarize the past thoughts, carry forward the achievements, why not take immediate action to write a self-appraisal it. But what are the requirements for self-identification? The following is I help you to organize the engineering evaluation of self-identification, only for reference, we take a look at it.
Engineering evaluation title self-identification 1
My name is xx, 20xx xx graduated from xx university xx professional, after graduation to join the xx company, after joining the job has been in the equipment department, engineering department work, as a new join the company's staff, the most important thing is to get through the shortest possible time, the "period of adaptation As a new employee, the most important thing is to get through the "adaptation period" in the shortest possible time, adapt to the working environment as soon as possible, and quickly change roles. For the development of the company to make a contribution to the value of their own embodiment, now will be the main work in the past few years reported as follows:
First, equipment maintenance during the Ministry of Equipment
After coming to the company I was assigned to the Ministry of Equipment, heat control professional, in the new post to my biggest feeling is the company's standardized management, not only embodied in the work, but also in the corporate image of the company's management. In the work, at the same time in the corporate image, personal image can also be reflected. Thermal control overhaul of the actual work experience requirements are very high, and it is in this regard that I lack, I will work through the work to exercise their own, improve their own, mold their own. Let yourself adapt to the work of knowledge and skills, so that the self hope that through learning can enhance their competitiveness, but also enhance the competitiveness of the company.
During the equipment department is mainly involved in a limestone system renovation, unit size repair and daily maintenance of equipment, limestone system renovation of the control part of all by the heat control professional themselves, the system access dcs to achieve automatic monitoring and control of the operation, I entered the plant after the fortunate catch up with the renovation, a period of 2 × 150wm generator set dcs (decentralized control system) using the Shanghai Xinhua control company produced xdps400 + system, in the configuration did not ask Xinhua technicians, all the work done by themselves, in the transformation process I did graphic configuration and part of the logic, in the process of participation in the system so that I am more quickly familiar with the system, and accumulated experience.
In the unit size repair and daily maintenance, I actively participate in, and often work overtime to successfully complete the task. In particular, the second unit overhaul at the beginning of 20xx is the first overhaul of the unit, overhaul projects, personnel experience is relatively inexperienced, before the overhaul of the team organized a number of seminars, put forward rectification proposals, early development of the various systems of the overhaul project and the implementation of the program. Spare parts early arrangement early arrangement, in the overhaul process overhaul and site cleanup synchronization, through the efforts of the completion of the unit's first overhaul, overhaul in addition to a "tired" word, I also learned a lot of things to enhance their own, training for their own, for the future work of the big under a good foundation.
The second phase of construction during the Ministry of Engineering
20xx year transferred to the Ministry of Engineering to participate in the second phase of construction, during this period is mainly responsible for the acceptance of equipment and system commissioning work. Equipment acceptance work is more cumbersome, heavy workload, involving a wide range of aspects, the most important thing is to eat through the contract, technical agreements and related technical standards, which is both a challenge to me and an opportunity to learn to improve the acceptance process adhere to the principle of a good number of quality, weekly organization of the supervisory, construction units, on behalf of the custodian of the unit, the manufacturers, materials and specialists in the arrival of the equipment acceptance and the project with the various units of each of the relevant units. Professional cooperation with the inspection, inspection of the arrival of the number of equipment, the quality of qualified, and the professional and technical personnel to actively cooperate with the strict control. Coordinate to deal with various problems found in the acceptance process. For problematic equipment, if not resolved, never let it enter the field installation.
20xxx x month, the unit began commissioning I began to participate in the commissioning of the unit, nothing when I went to turn the system, more familiar with the equipment, to master the first hand 'site information, the problems found in a timely manner to contact the construction unit, the commissioning unit to solve. For example, in the commissioning process found that the electric actuator exposed to more problems, after checking that some problems are not followed by the actuator adjustment steps led to the request to participate in the debugging personnel in strict accordance with the steps of the debugging, effective solution to the problem, to ensure that the equipment is not damaged in the commissioning process, in order to ensure that the unit is put into operation after the normal and stable operation of the unit, taking into account the convenience of our operators to operate, monitor the convenience of the unit. In order to ensure the normal and stable operation of the unit after commissioning, considering the convenient operation and monitoring of our operation personnel, we have put forward a number of suggestions for modification of the thermodynamic value and protection logic to improve the equipment and system, which plays an important role in the safety and stability of the whole set of start-up, and also provides a strong guarantee for the long-cycle operation of the unit in the future. Supervise and check the interlocking protection test of each equipment and system before startup, especially the interlocking protection test of unit tripping and oil system, and carry out signal simulation test and equipment linkage test to ensure the correctness and reliability of each protection action. The company has taken various measures to overcome difficulties and ensure the quality of commissioning under the premise of ensuring personal and equipment safety.
Infrastructure period involves more units, the need to solve more problems, many issues related to the handling of the interests of the various parties involved in the project, when I encountered specific problems, I am strictly based on the contract, specifications, in order to be fair and just as the principle of reasonable problem solving. It is in this discussion, negotiation, argument, dispute in the growth of their own, exercise their own.
Three, learning and improving
In my mind I am actively demanding progress, usually consciously learn advanced thinking theory, according to pdca management principles and methods to deal with their own learning and work in every matter, the work of my compliance, solidarity with colleagues, pragmatic, always maintain a rigorous and conscientious attitude and meticulous work style. Meticulous work style, honestly do people, hard work. Electricity production and construction is a highly technical work, but also a management project, to do a good job, you must master a lot of theoretical knowledge and practical experience, in the company's entry into the past few years, in all aspects of the work have been practiced and improved, coupled with a long period of professional learning, I have a more systematic theoretical knowledge and professional and technical knowledge, and accumulated a certain amount of work experience, in the technical and business level, Management ability and other aspects have a certain ability and conditions, now declare the title of engineer, I urge the judges to approve.
Engineering evaluation title self-identification 2Four years of time passed quickly, in four years, I was in the company's leadership and colleagues care and help to successfully complete the work, their own quality, ability to get a certain degree of improvement. Now the work of this period of time is summarized as follows:
First, professional knowledge, work ability and specific work
I came to the company in 20xx to work in the Department of Manufacturing scheduler. Organize, coordinate and balance the work of alumina production and operation. Scheduling work is trivial, but in order to improve production, I am not afraid of trouble. If you don't know, ask the leader for advice, learn from your colleagues, and practice by yourself. In four years, from theory to practice, from no knowledge to be familiar with alumina production. Clear work procedures, direction, improve the ability to work in the specific work to form a clear working idea, can carry out the work smoothly. In these four years, I in line with the "do a better job" as the goal, to develop a sense of innovation, and actively and successfully complete their work.
In order to schedule the smooth progress of work and coordination between departments, in addition to doing their jobs, I also actively cooperate with other colleagues to do a good job.
Second, the work attitude
Love this job, can correctly and seriously treat every job. Work commitment, conscientiously comply with labor discipline, effective use of working time, adhere to the post, to ensure that the work can be completed on time.
Third, the quality of work achievements
Before the work can do a good job of work planning, there are primary and secondary successive and timely completion of the work, to achieve the desired results, quality and quantity of work, work efficiency. At the same time in the work of learning a lot of things, but also exercise their own, after unremitting efforts, so that the level of work has made great progress, creating a new situation of work.
Summarize the work of the year x, despite certain progress and achievements, but in some areas there are still deficiencies. For example, creative work ideas are not a lot of individual work is not perfect, which is to be improved in the future work. In the future, I will seriously study the policies and regulations, and strive to make the ideological awareness and work efficiency into a new level.
Engineering evaluation title self-identification 3Since I joined the work, I strictly abide by the state's laws and regulations, and have never participated in a variety of illegal and undisciplined activities. I firmly support the leadership of the Chinese **** production party, adhere to the party's reform and opening up, and make their due contribution to the construction of socialism with Chinese characteristics. I strictly abide by the rules and regulations formulated by the organization, and play a leading role by being strict with myself and lenient with others. In the work, I continue to study, research, summarize experience and lessons learned, from a construction industry "layman" to the present professional and technical ability and management ability are fully mature engineering data technician, independently undertake housing construction, bridges, roads and drainage projects and other data work, in the political ideology, professional ethics, professionalism, etc. have made great achievements. In terms of political thinking, professional ethics, professional level, etc. have made great achievements, is summarized as follows:
First, the work attitude and career path
As the work of the data clerk itself is relatively cumbersome, but since entering the company I have been to deal with the work of the things encountered with a positive attitude to work, although occasionally there will be some emotional problems, but I will be able to deal with their own problems, and actively involved in the work of the job Diligent, conscientious, hard-working, start and finish, can correctly and seriously treat every job; seriously study the company's rules and regulations, conscientiously abide by labor discipline, to ensure that on time attendance, for even more difficult and tiring projects, I insist on the successful completion, and make results, never care about personal gains and losses, stick to their posts, to complete a project, looking at a high-rise building and a silver-gray boulevard completed, I feel immensely proud of my heart. Completion, I feel immensely proud and honorable, I have paid countless hard work and sweat, and got the praise of the community, I have no regrets, I am satisfied.
Second, the level of knowledge, professional ability
In the work, I continue to learn cultural knowledge and professional knowledge, and strive to improve their own level of knowledge and specialized capabilities. For the construction industry's new norms, new standards and new quotas, every time a introduced, I must buy and seriously study and research, master the new norms, new standards and new quotas, the norms, standards and quotas applied to the construction of the project, and constantly summarize the experience and lessons learned. When each project is completed and accepted, I carefully make a good project acceptance records, and collated into a book, stored in their own project completion acceptance records file, often analyze and study the completion of the acceptance records, to find out what problems exist in the construction of the project, which aspects are worth improving, which aspects are worth continuing to carry forward.
Third, some of the technical data technician work:
1, clear division of responsibility, supervise the implementation of the process. Timely collection and organizing, timely problem feedback. Regular information rectification, once again information verification. Catalog timely follow-up, perfect information archiving. Through the above measures, problems were identified in time and rectified at the first time, bumpy and successfully passed one inspection after another.
2, construction technical information is strictly controlled: construction technical information is to guide the correct, standardized, scientific construction documents, as well as engineering changes in the situation of the official documents, and changes, negotiation, drawing review to be signed by the design and construction units, Shi group, the program to be approved at the company level, the handover to the construction team to sign. Once encountered engineering disputes or other special circumstances, such cases are the most basic and important information to resolve disputes, therefore, such information should be strictly managed, generally do not lend, beware of loss, have to borrow, the implementation of a strict borrowing registration system. In addition, the project side design and construction, frequent engineering changes, design changes, engineering negotiations. Design changes, engineering negotiations directly affect the construction progress, project settlement. If because of the change,
Negotiation is not timely and cause economic losses, then the whole project department's hard work will lose its meaning. Therefore, it must be timely to change, negotiation issued to the hands of the relevant personnel of the project department, and by the technical staff in the first time in the form of delivery to the construction of the front line of the construction team.
3, construction surveying records should be illustrated exhaustive: construction surveying records are to ensure that the project positioning, size, elevation, location, etc. ` information. "A lapse of a tiny bit, the fallacy of a thousand miles", due to the negligence of the release of the line to the subsequent construction of the example of the trouble is not uncommon. Therefore, the measurement data must have detailed diagrams to ensure the accuracy of the measurement construction. Such as the floor plan of the release records, hole release to draw a profile sketch, indicating the release of the elevation of the dimensions, there should be a plane sketch, if the plane release requirements note axis size, explaining the size of the wall and column section, the location of the door and window dimensions, the axis control line and wall and column edge size, if the external wall, door and window openings release to draw a profile sketch, indicating the release of the elevation of the dimensions.
4, construction records should be detailed and specific: construction records are formed during the construction process, to ensure project quality, safety of various checks, records, etc.. The content of the record should be detailed and specific, not generalized, and to maintain consistency with the technical delivery, such as hidden inspection of reinforcing steel binding, to write clear reinforcing steel varieties, specifications, quantities, location, joint location, lap length, protective layer thickness, reinforcing steel and pads binding and rusting of reinforcing steel and other conditions. When there is data, calculate the specific value and avoid the use of prescriptive language. When changes occur, negotiation, but also write the content of the change and indicate its number.
5, construction test records should be timely and complete. Qualified construction test is a prerequisite for the acceptance of the test lot (sub-division) project. Such as reinforcing steel connection test report is the premise of reinforcing steel installation test batch acceptance, concrete test report is the premise of concrete construction test batch acceptance. So the construction test records should be carried out step by step, so as not to omit, affecting the subsequent construction.
6, test batch acceptance record check items to be filled out: test batch is the smallest unit of acceptance of the project is the sub-projects and even the whole construction quality acceptance of the foundation. Therefore, the test batch in the assessment of the qualified or not directly affects the sub-projects and even the whole construction project quality acceptance. Inspection lot should be checked in each project should not be missed. Such as pre-embedded parts of the rebar installation inspection lot of pre-embedded parts, construction joints parts of the concrete construction inspection lot of construction joints.
In short, the information work from the Ministry of Technology, Ministry of Engineering to the Ministry of Materials and even the Ministry of Operations has been infiltrated into all corners of the project department, each department, personnel, each with their own responsibilities and mutual constraints, interlocking, especially the information cross-circuit requirements, more like a rope will be all the information related to the Ministry of the project department, personnel tightly tied up in the up, which requires that all the information-related personnel must be in step with the perfect cooperation, and resolutely prevent the domino effect of the project. Prevent the occurrence of the domino effect. Lone hand, strong leadership and system is a hardware guarantee, with high quality and excellent business level of staff is a software guarantee, both can shape an invincible, invincible excellent team, excellent team in order to do a first-class work.
With the rapid development of municipal infrastructure construction, the requirements of the municipal engineering information content more comprehensive, perfect, the only way to do a good job is to continue to learn and master the new finishing methods. Rain to snow, the wind through the clouds away, I will continue to adhere to the spirit of hard work and stand hard, continue to explore, rise to the challenge of the fighting spirit, hold high the great banner of quality engineering, adhere to the good, abandon the bad, as long as they continue to improve their own cultivation, love and dedication to their work, and will certainly be rewarded. The road is long, I will go up and down and seek.
Summarizer: Wang Jinglin
January 12, 20xx
Engineering evaluation title self-identification 4Many years of large-scale project construction site management experience, responsible for the management of engineering technology, progress, quality, cost, safety and other aspects. Familiar with building construction standards and acceptance specifications; familiar with the project operation throughout, mastering the requirements of various engineering technologies. Can effectively organize, lead and coordinate the work of general contractors and subcontracting units, strictly fulfill the contract requirements, and complete the set quality, progress and cost targets. Dedicated to work and lead by example with strong team coordination and management skills. Holds a junior title in construction and obtains the national second grade constructor's license. Skilled in the use of autocad, office series office software.
I have a wealth of knowledge, excellent self-regulation ability, good health, can maintain a good working condition for a long time. Character is indifferent, grew up in a military family, has a strong self-discipline, with a sense of teamwork. He has a conscientious and responsible working attitude and strives for perfection in the performance of his duties. He has worked in China Construction Bureau, China Construction - Dacheng Company, etc., engaged in construction general contractor site management for a long time, familiar with the general contractor, contractor and supervision of the project management process, the construction organization, construction technology, communication and coordination, etc. Deep understanding. In 20xx, the first batch of the National Registered Secondary Constructor, and strive to become an outstanding project manager (production manager), reflecting the value of their lives.
Has been in the project department of the xx Limited by technical work. The main thing is to participate in the bidding, the preparation of programs and proposals, drawing site construction drawings, office negotiation, dealing with the supervisor, the A party, make as-built drawings and other work. 20xx x to date in the construction of an electronic plant as a civil engineer on site.
I have participated in the work of nearly x years, long years of work in the field of construction, from the initial maintenance, building leakage to the supervision of high-level decoration, high-rise buildings, municipal roads, bridges and so on can be said to have experienced a wide range of infrastructure section as a member of the section, the constructor, deputy project manager, project manager, project director and other positions. From the grassroots to management to bear the heavy work pressure.
I know that only with excellent technical expertise, good communication skills and teamwork spirit, can I work effectively. I am eager to have more space for development in the new environment.
Also has been in the xx limited company work nearly x years, long as the project technical engineer and project manager, which once served as more than 20,000 square meters of project engineer, and more than 10,000 square meters of project manager, has a wealth of practical experience in construction. People work enthusiastically and actively, with good interpersonal skills.
Engineering evaluation title self-identification 5to the network management project department as a technician, has been more than a year, in this year, review this year's work history, summarize a year's work experience, lessons learned, is conducive to the future work in the work of the strengths and weaknesses of better technical work, the following I report to the leadership of their own work for a year:
In the past year, thanks to the support of the company and the project department, the company and the project department. Thanks to the support of the company and the Ministry of the project, the Ministry of the pipe network project as a technician position, the past year's construction, the Ministry of the project under the care and help of many seniors, regardless of technology or quality control and management, so that I have made great progress in my work, of course, the results only represent the past, I will redouble my efforts to do a better job in the future work; Previously, I learned from the book to "Scientific things can not come to half hypocrisy and pride". In the project, the technical content is high, which requires us to treat the work of technical personnel can not be people, do good old man, but to be practical, rigorous attitude towards work, do not know something to learn, have understood something more to strive for excellence, because technology is constantly progressing and updating, only through continuous learning, supplemented by pragmatic and pragmatic style, down-to-earth style, in order to be able to work in their own positions. All engineering construction, technology and quality control work throughout, in the accumulation of work experience, and gradually cultivate their foresight, in order to play the style of technology first, the construction industry is different from other industries, it needs to be constantly on the scene to check, supervise, and at any time to find the problem, solve the problem, and these jobs are carried out in the field of the more hostile environment, which requires us to continue to cultivate the spirit of hard-working and enduring to be Not afraid of hard work, not afraid of tiredness, put down the managers of the high attitude, from the engineering of the actual work to enrich their own learned talents, so that their comprehensive processing capacity of the scene to be exercised and improved.
As a member of the construction company, have the opportunity to learn and exercise in such conditions, feel immense pride, this environment and external conditions give us a kind of self-confidence and honor, but more is the spur to our future work, we are required to work at all times to the image of the enterprise to constrain their own, all of our words and deeds to comply with the standards of the special enterprise, and gradually cultivate their own personal qualities and cultivation, in order to have no fear of hard work. Personal quality and cultivation, in order to be worthy of the leadership's trust and training. By summarizing the work of the year, to find out the shortcomings of the work, in order to overcome in the future work, but also need to read more books, seriously study the norms and regulations and the relevant documents and materials, to master the professional knowledge, to improve their ability to work, and to strengthen the sense of responsibility for the work, and to do a good job in a timely manner in the work of the individual.
In short, in the future work and study, I will continue to summarize and introspection, and constantly stimulate their own and enrich the energy, and strive to improve their own quality and business level, in order to adapt to the times and the development of the enterprise, and the company *** with the progress, *** with the growth.
;