Commitment letter of civilized construction

Nowadays, the application of commitment letter is more and more extensive. The letter of commitment is a unilateral expression of will and has no contractual effect. So, have you understood the commitment letter? The following is my collection of 10 commitment letter for civilized construction for your reference, hoping to help friends in need.

Commitment letter of civilized construction 1 I have the honor to undertake the construction of this project. In order to promote the civilized construction of the city's construction sites, improve the construction environment of the city's construction sites, and establish a good image of our company, we hereby make the following commitments on the civilized construction of this project:

1. The project is fully enclosed for construction management. In accordance with the requirements of standards and specifications and the implementation plan of creating a "civilized construction site", brick walls are constantly set around. The height is not less than 2.5 meters. The gray brick column is painted with white paint, and the gray glazed tile is the top. The publicity slogans are written in standard fonts on the facade and the main facade wall along the street.

2. The main entrances and exits of the project construction should be equipped with gates with a width of not less than 5 meters, and the materials and production must be solid and beautiful. A guard should be set up at the gate and a duty system should be established. Construction personnel should wear a "work card" when entering the site.

3. The main import and export roads, material storage yards and processing plants on the construction site should adopt hard concrete floors and be hardened. Sidewalks can be paved with cinder or graded gravel soil. The whole construction site should keep the roads unblocked and the drainage unblocked, so as to prevent cross-flow of sewage.

4. Materials such as sand and gravel shall not be piled up outside the construction fence, and roads shall not be occupied for construction, and the roads along the street around the construction site shall be kept clean and hygienic at any time.

5. Vehicles transporting materials on the construction site should be kept as tight as possible, and personnel should be arranged to clean them up immediately if there is any.

6. Scaffolds on the construction site should be hung with dense mesh in two or more steps to keep them clean and tidy. Damaged scaffolds should be replaced in time.

7. Try to keep the construction site clean and tidy. Building materials, components and machines must be stacked and set up according to the layout of the general plan. Sand and gravel bulk materials should be enclosed by masonry, rod materials should be stored by vertical frame, all kinds of blocks should be neatly stacked, and signs such as materials, machine names and specifications should be hung separately.

8. Hang "six cards and one map" (project overview card, construction personnel overview card, ten safety discipline cards, ten safety measures cards, health notice cards, and site layout plan) in an eye-catching position on the construction site. The specifications of the cards are generally not less than 120×80㎝.

9, the construction site should be responsible for the safety and civilized construction management personnel, regular inspection, found that the problem timely rectification, the safety and civilized construction and other issues must actively cooperate and seriously implement.

10. If I fail to carry out the project construction according to the above commitment, I voluntarily accept the punishment that the Municipal Construction Management Office cancels the bidding qualification, suspends business or revokes the qualification certificate.

Commitment: xxx

Commitment of Civilized Construction 2 In order to further strengthen the dust control work on the construction site, implement the civilized construction management responsibility of the project department and improve the civilized construction management level of the contractor, this project makes the following commitments on civilized construction management:

1. This project has established the responsibility system of dust control and site cleaning with Jiangsu Shuanglou Construction Group Co., Ltd. (the main body) as the construction unit and all contractors working together. If the main construction unit is not determined, during the pile foundation construction, the construction unit of Jiangsu Geotechnical Engineering Company (pile foundation) will be the overall responsible unit, and other contractors will cooperate to implement the responsibility system for dust control and site cleaning. After the completion of pile foundation construction and before earthwork excavation, the construction unit shall promptly determine a major construction unit as the overall responsible unit, re-sign this letter of commitment, take the lead in handover, and report it to our station for the record.

Second, the scope of management of the overall responsibility unit

1. Set up enclosure according to regulations, establish guard system, manage by special personnel, implement closed construction management, and conduct patrol inspection on the integrity and cleanliness of enclosure.

2, according to the provisions, set up vehicle washing device, equipped with washing equipment, arrange special personnel to wash the vehicles entering and leaving the site, to ensure that the vehicles are on the road without mud.

3. Dust suppression measures should be taken in the site within the scope of construction work. During the construction of multiple units on site, the public roads on site should be cleaned and dusted, and measures should be taken to suppress dust by sprinkling water.

4, in accordance with the provisions, do a good job in front of the three bags of cleaning.

5. When the main construction unit or the general contractor is the overall responsible unit, it is responsible for the civilized construction management of the final stage of this project and the supporting project construction.

Three. Liability agreement of relevant units

1, in this project, the construction unit is determined as the organization responsible unit for dust control work on site, and the project leader is the first responsible person. The overall responsible unit is responsible for the implementation of dust prevention work on site, and the project manager is the first responsible person. The supervision unit is the responsible unit for dust prevention work on site, and the project leader is the first responsible person.

2, the overall responsibility unit to ensure the full use of civilized construction measures.

3, supervision units to strengthen the on-site inspection of civilized construction management, found that the problem in a timely manner to the overall responsibility of the unit.

Make rectification and report to the construction unit. If the overall responsibility unit fails to rectify in time, it shall report to the supervision institution or the relevant department.

Fourth, specific work measures

1. The enclosure on the construction site is continuously set around the construction site, and hard materials such as masonry and metal plate are selected without gaps; The enclosure height shall not be less than1.8m; ; The enclosure of stations, squares and construction sites that affect the city appearance and landscape in the urban area shall not be less than 2.5m, and the maximum shall not exceed 3.5m..

2. It is forbidden to pile up loose materials such as soil, sand and gravel, scaffolding steel pipes and templates. On the outside of the retaining structure, it is forbidden to use the retaining structure as a retaining wall.

3. The entrance and exit of the construction site shall be provided with a standard washing table, equipped with high-pressure washing facilities, and a perfect vehicle washing system shall be established. A vehicle cleaning account shall be established, and a designated person shall be responsible for cleaning. All vehicles can only be driven out of the construction site after the wheels and baffles are cleaned.

4. The entrances and exits of the construction site and the main roads should be hardened, and sprinkling or spraying measures should be taken regularly, and the road surface should be cleaned by special personnel. If necessary, you can rent a dust truck to clean the dust around the road and the door of the construction site.

5, it is forbidden to burn all kinds of waste on the construction site.

6, timely removal of construction waste, engineering residue; If the removal cannot be completed in time, a temporary dump shall be set up at the construction site, and dust-proof measures such as enclosure and coverage shall be taken for the temporary dump; Measures such as covering, maintenance or greening should be taken for earthwork piled up in exposed sites and construction sites.

Chief Engineer of Nanjing Suning Construction Supervision Co., Ltd.:

Jiangsu shuanglou construction group Yifeng garden projects department

Project leader:

date month year

Commitment Letter of Civilized Construction Article 3 According to the provisions of the Building Law on environmental protection and safety in production, in order to improve and maintain the urban environment of our city and standardize the construction behavior of construction enterprises, our unit formulates the Responsibility Letter of Civilized Construction Objectives of Construction Enterprises. Accept the supervision and management of relevant departments, and the main responsibility objectives are as follows:

1 Take measures to control and treat all kinds of dust, waste gas, waste water, solid waste, noise and vibration on the construction site in strict accordance with the provisions of the Building Law on environmental protection and safe production.

2. Formulate the responsibility system and management measures for environmental protection and civilized construction, decompose them layer by layer, and assign the responsibility to people.

3, the construction site should be standardized management. The enclosure on the construction site should be stable and beautiful, and the production and installation specifications of Xiamen should be clear, standardized and in line with the requirements of the city; On-site roads should be hardened and unblocked, and the drainage system should be unimpeded; All kinds of building components, materials and facilities should be neatly stacked; Mechanical equipment should have operating instruction cards; The construction area shall be marked conspicuously, and the prohibition of dangerous areas shall be obvious.

4, site construction should strictly control the dust, waste gas, garbage, sewage emissions and noise; Construction waste must be cleaned up in time and piled up at fixed points.

5, the construction site should be equipped with clean soil cleaning equipment and facilities, vehicles transporting dust and garbage, must be covered with tarpaulin, shall not be super-high, overload, speeding, vehicles must be cleaned when they leave the site, wheels shall not be sticky with mud, during transportation.

Dumping of construction waste is strictly prohibited.

6, enterprise leaders should regularly check the construction site, and will make a written record of the inspection, in the annual inspection or registration of enterprise qualification, as one of the materials submitted to the Xi Urban and Rural Construction Committee Building Management Office.

7. If the construction site of our unit fails to meet the requirements of the target responsibility book, we are willing to accept the punishment of the Municipal Construction Committee and relevant departments in addition to rectification.

Construction enterprise engineering project department

Legal Representative (Seal) Project Management

Year, month, sun, moon, sun.

Commitment to Civilized Construction Article 4 In order to successfully complete the construction task of the * * * * * general contracting project, the following commitments are made:

Conscientiously implement the national and provincial laws, regulations, mandatory standards and safety operation procedures related to safe and civilized production, establish and improve the guarantee system of safe and civilized production on the construction site, implement various specific measures, earnestly fulfill the responsibilities and obligations of safe and civilized production, protect the health and life safety of employees, ensure public safety, protect environmental sanitation, keep the construction site clean and orderly, and realize civilized construction. Strive for no fatal accident, no serious injury accident, no poisoning accident, no fire accident and no collapse accident, and the qualified rate of safe production and civilized construction will reach 100%.

1, ensure the investment in safe and civilized production, set up site signs (five certificates and one map) and safety warning signs in accordance with regulations, set up warning signs in a prominent position for social public safety, and take corresponding protective measures. Safety and civilized production facilities and equipment are set according to standards, with complete facilities, firmness and reliability.

2, the construction site closed management, the construction site should be clean and tidy in Dang Wei, along the street and important parts must be set according to the requirements of the construction unit, and ensure safety and beauty, construction slogan content must be approved by the construction unit, construction general contractor.

3. The construction site should be equipped with cleaners or health personnel on duty, to keep the construction site clean and orderly, all kinds of materials should be classified and stored neatly, and construction waste should be cleaned up and transported in time. After the completion of each type of work, the site should be cleaned up. It is forbidden to pile up materials and garbage outside the construction site. "Harden" the site to ensure that the roads in the site are unimpeded, without water, mud, waste water, dust and toxic and harmful gases.

4, the construction site layout and process arrangement should consider noise and lighting control, in strict accordance with the relevant provisions of provinces and cities, to avoid disturbing people; Special toilets must be set up on the construction site and managed by special personnel. Do not urinate at will. In the process of earthwork transportation, the operation procedures shall be strictly observed, and it shall not be spilled outside the construction site. At the same time, measures should be taken to avoid dust.

5, foreign construction personnel must handle the relevant documents, prohibit non-construction unit personnel to stay in the construction site, the construction site is prohibited to gather people to play cards, drink and make trouble, spread obscene articles; It is forbidden for construction workers to walk around in non-construction areas at will, and it is forbidden to have conflicts with local residents.

6. Construction vehicles should pay attention to traffic safety when entering and leaving the site, and must go slow. Large machinery should negotiate with the construction unit in advance to avoid the urban traffic rush hour. When the road construction must be closed, the consent of the construction unit must be obtained, and obvious warning signs should be set at the intersection.

7. Temporary power consumption on the construction site must conform to the Technical Specification for Safety of Temporary Power Consumption on the Construction Site, adopt TN-S system, achieve "one machine, one brake and one leakage box", use standard electrical boxes, and use qualified products such as wires, switches and leakage protectors; The fixed distribution box should be fenced with obvious safety warning signs. Non-professionals are forbidden to connect and disconnect wires to prevent electric shock accidents. It is forbidden to use electric appliances such as electric furnaces that hinder site safety.

8. On-site fire fighting equipment such as fire hydrants should be fully equipped, with reasonable location and obvious warning signs. Prohibit misappropriation to ensure the smooth flow of fire roads; Smoking is strictly prohibited in the construction site, and there must be a special person responsible for the management of toxic, flammable and explosive materials and hot work in construction.

9, site construction personnel must dress neatly, wearing badges, it is forbidden to other people to enter the construction site; Safety helmet must be worn when entering the construction site, and safety belt must be worn when working high above the ground. Workers are forbidden to work under the influence of alcohol, climb scaffolding, and throw objects down when working high above the ground.

10, scaffolding, foundation pit support, tower cranes, elevators and other large-scale machinery installation must have a construction plan approved by the superior safety department, all kinds of construction machinery certificates, inspection certificates and safety protection devices are complete, use the safety net that has passed the inspection, do a good job in four-port and five-limb protection, and clarify the person in charge of protection on each floor. Put an end to all falling objects, earth collapse and other construction safety accidents.

1 1. Building materials, building components, safety protection articles, safety facilities, machines and tools, mechanical equipment and electrical devices used in the construction site must meet the requirements of construction safety and other relevant technical specifications and standards, and shall be tested in accordance with regulations. Otherwise, it will not be put into use.

12, the workers' canteen must be clean and tidy, free of flies and rats, and the operators' licenses are complete, and the relevant regulations on food hygiene and safety should be seriously implemented to prevent workers from food poisoning; The dormitory of construction personnel should be clean and tidy, and it is forbidden to pull wires at will to keep warm in winter to prevent workers from gas poisoning.

13, the site should have management personnel responsible for safe and civilized construction, regular inspection, timely rectification when problems are found; In other aspects of safe and civilized construction, we must actively cooperate with the construction unit and the general contractor and earnestly perform them.

If there is any violation of the above terms, I (the unit) will accept any punishment from the general contracting project department and bear all civil or criminal responsibilities arising therefrom.

Person in charge of construction project (signature):

Date: May 30th, 20xx

Commitment to Civilized Construction Article 5 This project is: * * *, because the construction of Dongfang Intersection in this project is located in Metro Line 4, according to the decision of Shanghai urban traffic administrative license, the construction of slotted buried pipes and working wells close to the subway structure should be carried out from 10: 00 to 6: 00 the next morning. In order to ensure the smooth progress of the project and minimize the impact on the surrounding residents. * * * *, the contractor, submitted a letter of commitment for civilized construction at night to the local residents' committee, with the following contents:

1, carefully construct, reasonably arrange the construction process, and try to arrange the noisy process in daytime.

2, strengthen the education and management of operators, strictly abide by the relevant provisions of the civilized construction at night, night construction don't talk loudly.

3. Strengthen the control of construction noise, and it is forbidden to use pick machine, air compressor and other machinery that produces serious noise after 10: 00 at night for continuous and special processes.

4, construction vehicles in and out of the site at night are not allowed to honk.

5. The speed limit for construction vehicles entering the construction site at night is 5km/h. ..

6, construction at night to avoid iron impact, reduce the impact on the surrounding residents.

7. Choose new equipment as much as possible, and strengthen maintenance to avoid increasing noise due to equipment aging and lack of maintenance.

Hereby promise!

Commitment letter for civilized construction of Area 6 Construction Committee:

I have the honor of building 2#, 4# and 6# of Shangmashi low-rent housing project in Kaili City. In order to promote the civilized construction of the site in the whole region, improve the construction environment of the site in the whole region and establish a good image of our company, we hereby make the following commitments on the civilized construction of this project:

1. The project is fully enclosed for construction management. According to the document number, brick walls are continuously set around. Director of district construction bureau. The inner and outer walls of the wall are polished with cement mortar, and the surface is painted. The facade and the main facade along the street are written in standard fonts.

2. The main entrances and exits of the project construction are provided with gates, iron gates are installed, and the door head is provided with an enterprise door head plate with an advertising light box.

3. The main entrance and exit roads of the project are hardened, and concrete pavement with a width greater than 5m, a length greater than10m and a thickness of about10cm is poured. Washing equipment should be set up at the gate, and special personnel should be arranged to be responsible for washing.

4. Materials such as sand and gravel shall not be piled up outside the construction fence, and roads shall not be occupied for construction, and the roads along the street around the construction site shall be kept clean and hygienic at any time.

5. Vehicles transporting materials on the construction site should be kept as tight as possible, and personnel should be arranged to clean them up immediately if there is any.

6. Scaffolding on the construction site should be hung with a dense mesh safety net for more than two steps. The safety net should be kept clean, and the damaged safety net should be replaced in time.

7. Try to keep the construction site clean, the materials are neatly stacked and clearly marked, and the construction waste is cleaned up in time.

8. If I fail to carry out the project construction according to the above commitments, I voluntarily accept the punishment that the District Construction Committee cancels the bidding qualification, suspends business or revokes the qualification certificate.

Hereby promise

Supervisor: Commitment:

Year, month, sun, moon, sun.

When the design documents required to be completed by the contractor in Article 7 (1) of the civilized construction commitment are submitted,

Time: On the premise that the construction period will not be affected, the contractor must provide relevant design documents 30 days before the commencement of the project requiring secondary design.

(2) Name and completion time of plans and statements provided: a. Within 5 days after signing the contract, the contractor shall provide the supervisor and the employer with the total construction schedule in quadruplicate; B, on 25th of each month, report the project progress report (including monthly image progress, project settlement fee and monthly project price list) completed in that month to the supervisor, owner and agent construction unit (as of 20th of that month) and the construction progress plan, quantity plan and capital use plan for next month in quadruplicate.

(3) Undertake the responsibilities and requirements of construction safety and security work and non-night construction lighting: the contractor shall be responsible for all the work and bear all the expenses, and all the consequences arising therefrom shall be borne by the contractor.

(4) Requirements for office and living rooms and facilities provided to the owner: provide 2 on-site office rooms, each of which is 20 square meters, with 4 sets of office tables and chairs, 1 set of filing cabinets; 40 square meters meeting room 1 room, meeting tables and chairs 1 set; There are 2 on-site dormitories, each 20 square meters, each with 4 beds. The above expenses have been included in the total contract price.

(5) Relevant procedures for traffic, sanitation and construction noise management on the construction site that need to be handled by the contractor: The contractor is responsible for handling according to the relevant regulations of Xiamen, and bears corresponding responsibilities, and its expenses are implemented according to the relevant regulations, which have been included in the total contract price and used as lump sum.

(6) Special requirements and expenses for finished product protection of completed projects: Before the project is handed over to the Employer, the contractor shall be responsible for protection. During the contractor's protection, if the completed project is damaged, the contractor shall be responsible for repairing it and bear the corresponding expenses; If the Employer uses the completed project that has not been handed over in advance, causing damage to the project, the Contractor shall do a good job of repair in time, and the relevant expenses shall be borne by the Employer.

(7) Requirements and expenses for the protection of underground pipelines and adjacent buildings and structures (including buildings for cultural relics protection) and ancient and famous trees around the construction site: The contractor shall be responsible for protecting the buildings and structures around this project, and this part of expenses shall be included in the contractor's total tender offer. For the protection of underground pipelines and ancient and famous trees around the construction site, the contractor shall submit a protection plan, which shall be well protected after being approved by the engineers and supervision engineers stationed by the Employer. The protection fee shall be borne by the employer after it is approved by the employer. If the damage is caused by the contractor, the repair cost shall be borne by the contractor.

(8) Cleanliness and hygiene requirements of the construction site: The contractor shall ensure that the cleanliness and hygiene of the construction site conform to the relevant regulations of Xiamen and the requirements of civilized construction, and strictly abide by the management regulations on engineering quality, safety and civilized construction of the comprehensive service building of Automobile City during the construction process, so as to achieve safe and civilized construction; In accordance with the provisions, set up car washing slots and other facilities at the entrances and exits of vehicles in the venues; Before the completion of the project, clean up the site to meet the requirements of municipal environmental sanitation and ensure the cleanliness of the construction site. The expenses incurred shall be borne by the contractor, and the losses and fines caused by the contractor's violation of relevant regulations shall be borne by the contractor.

(9) Other work agreed by both parties that the contractor should do:

A, due to the underground pipeline information provided by the employer to the contractor is only provided by the urban construction archives, the contractor shall verify the authenticity of the information, and the contractor shall be responsible for all problems caused by the contractor's failure to verify clearly.

B the contractor shall effectively protect the leveling points, coordinate points and control points provided by the employer. In case of any damage or loss during construction, the Employer shall contact the original lofting unit for replacement, and the expenses incurred shall be borne by the Contractor.

C, if necessary, the contractor must cooperate with the construction of power supply, water supply, municipal, cable television, communication, network and other departments.

D, in a timely manner to the Xiamen municipal construction administrative department for project construction and construction procedures, to ensure the timely start.

E, the contractor must be responsible for coordinating the local relations around, to ensure the smooth completion of the project, all consequences caused by the adjacent relationship shall be borne by the contractor.

F, temporary land, occupied roads and temporary water and electricity needed in the construction shall be handled by the contractor and bear the corresponding expenses. The contractor is responsible for protecting the water meters and meters handed over by the Employer, and paying the water and electricity charges on time as agreed in this contract.

G. The projects contracted by the Employer alone include: municipal, power supply, water supply, gas, greening, cable TV, communication, video intercom, elevator and other professional projects. The contractor is responsible for the general contracting management and cooperation during the construction period, and its general contracting management fee and cooperation fee have been included in the total contract price. During the construction period, the contractor shall not charge the general contracting management fee and cooperation fee from the employer, and the contractor shall be responsible for providing vertical transportation and cooperation with related disciplines (excluding elevator scaffolding). The utilities used by the above subcontractors shall be collected by the contractor from the relevant subcontractors, and the owner shall provide assistance.

Commitment to Civilized Construction 8 In order to further strengthen the management of safe production and civilized construction, the construction unit and the project department should establish and improve the management system, safety measures, civilized construction measures and construction waste treatment measures for safe production, civilized construction and closed transportation of bulk building materials. The construction project shall ensure the effective investment of various measures and capital expenses, and the construction supervision shall strictly supervise the construction unit and earnestly do the following work:

1. A solid, beautiful, environmentally-friendly or landscape-creative closed enclosure (fence) must be set up at the site of the construction area in accordance with the Safety Inspection Standard for Building Construction (JGJ59-99), and the height shall not be less than1.8m. A neat and tight dense mesh safety net or closed construction must be set up at the outside of the building.

2. The gatehouse must be set up at the gate, the enterprise logo should be set up at the entrance and exit, and the car washing platform, car washing equipment and garbage sedimentation tank should be set up, so that there is no leakage and pollution in and out of the net car.

3. The main construction roads and yards must be hardened with concrete, hardened with solid materials or afforested. The reserved land and construction waste must be transported in corresponding containers or pipelines, piled up in a centralized way, and covered or regularly sprinkled with water to control dust. It is forbidden to throw objects in the air.

4, it is forbidden to burn all kinds of waste in the construction site.

5, the site must be reasonable arrangement of drainage facilities, drainage to unobstructed, can not have water phenomenon.

6. The site and its surroundings must be kept clean and tidy, and materials should be stacked in an orderly manner.

7, living quarters and construction areas should have obvious isolation measures, dormitory and site canteen settings must meet the specified requirements, and meet the safety conditions and health standards.

8, in order to ensure the construction on time, not on-site mixing concrete, do not produce noise nuisance, noise equipment should be set in the work area to reduce the volume.

9, the construction site environmental maintenance and hygiene standards must strictly implement the JGJ 146-20xx) standard and the Ministry of health, the Ministry of construction "on further strengthening the construction site canteen hygiene management notice".

10, the construction waste generated by the project construction should be declared and disposed of to the residual soil management center of the municipal urban management bureau five days in advance, and the disposal procedures should be handled, and the transportation contract for consumption and cleaning should be signed, and the implementation can be organized only after approval.

1 1. If it violates the above commitments, it is willing to accept the administrative punishment of the competent department.

Commitment: xxx

Commitment Letter for Civilized Construction 9 In order to further implement the spirit of Shanghai Municipal People's Government (1994) No.20 Document "Interim Provisions on the Management of Civilized Construction in Shanghai", accept the supervision of all sectors of society, and implement various rules and regulations of civilized construction, we hereby notify you of our commitment to civilized construction on the construction site as follows:

1. This station started on 20xx 101October 25th and was completed on May 28th. During the construction period, strictly implement the document No.20 issued by Shanghai Government (1994) and the standard JGJ 59-99, formulate civilized construction measures that will not disturb the people, and do a good job in noise prevention and pollution prevention. Please forgive the trouble and inconvenience caused to you during the construction period, thank you!

2. Strictly implement the relevant regulations of environmental protection and relevant departments on night construction. If night construction is really necessary, it is necessary to apply for night construction permit (post notices) in time to minimize the noise impact of daily construction time (6: 00-22: 00).

3, do a good job in site management of construction work, improve the dust, light, pollution prevention measures, put an end to the impact of construction on the city appearance and environment.

4. Strengthen the safety management of roads around the construction site and implement protective measures to ensure the safety of pedestrians.

5. If the construction is carried out at night without permission, the noise will seriously affect the surrounding environment, causing light pollution and environmental pollution. People from all walks of life can call the following telephone number to make complaints: on-duty telephone number 50892437.

Company Tel: 5696450 1

Complaint telephone number of Environmental Protection Bureau: 588 1 18 12.

Commitment unit of civilized construction: Project Manager of Oriental Pearl International Apartment Project Department of Zhejiang Haibin Hengdao Branch: Hang Tao 20xx65438+1October 25th.

Civilized construction commitment 10 Temporary occupation and excavation of urban roads Civilized construction commitment Due to the safe operation and construction of gas pipeline network, our unit needs to temporarily occupy and excavate Jiangyan Road and Jiangnan Avenue in Haizhu District to implement gas pipeline projects. In order to ensure the civilized construction and smooth traffic of urban road excavation (construction), our unit promises to strictly follow the Road Traffic Safety Law, Regulations on the Administration of Municipal Facilities, Notice on Standardizing the Enclosure Facilities for Civilized Construction of Municipal Projects (Sui [20xx] No.218) and Notice on Strengthening the Civilized Construction Management of Municipal Gardens and Pipeline Construction Projects (Municipal Gardens [20xx]

Bright card structure. Hanging urban road excavation permit or urban road temporary occupation permit at the construction site.

2. Shell structure. According to the relevant regulations of civilized construction management, standard enclosure facilities should be adopted for enclosure work within the construction scope.

3. Construction on time. Strictly follow the approved construction plan and traffic organization plan. Rational allocation of human machines and tools, to avoid the construction peak and busy hours.

4. The construction site shall be provided with obvious traffic guide signs and warning lights at night. For engineering construction that has a great impact on vehicles and pedestrians, in addition to taking traffic diversion measures, special personnel should also be assigned to assist the public security traffic management department in traffic diversion. Repair the roads within the construction scope in time to ensure the traffic safety and smoothness within the construction scope.

Five. Construction materials, machines and tools shall not be placed outside the scope of the construction enclosure, and living facilities unrelated to the construction shall not be built on the temporarily occupied construction site. On the premise of not affecting traffic and pedestrians, temporary facilities such as warehouses and temporary offices should be installed at approved locations, but temporary facilities such as bamboo and wood structures that affect urban landscape should not be installed.

6. The construction of large machinery should be completed before 10: 30 pm as far as possible, and effective measures should be taken to reduce construction noise and dust.

Seven. The residual mud generated during construction shall be cleaned up and transported in time, and the stacking time of residual mud shall not exceed 24 hours, and the key sections shall be cleaned up and transported immediately. Vehicles carrying spare parts and construction waste must pass the qualification examination, hold a transportation permit, and may not be discharged into the road. Avoid affecting the city appearance and traffic safety. Other facilities damaged during the construction period and within the construction scope, the construction unit and the construction unit shall be liable for restoration or compensation.

Eight. The above construction measures, promise to do a good job of self-inspection every day, and consciously accept the supervision and inspection of the municipal management department, the public security traffic management department and the municipal urban management comprehensive law enforcement department. If there is a violation, in addition to timely correction, the law enforcement departments should be punished according to relevant laws and regulations. If traffic personnel, vehicles and other property losses are caused by improper construction measures or inadequate management responsibilities, the construction unit and the construction unit will be liable for compensation according to law.

Construction unit: (seal) Construction unit: (seal)

Person in charge: contact person: person in charge: contact person: