Commitment letter of time limit for a project and quality

Commitment letter of time limit for a project and quality

With the continuous progress of society, we all have direct or indirect contact with the commitment letter, which is completely voluntary. Do you know how to write a letter of commitment? The following is the time limit for a project and the quality commitment letter I have compiled for you. Welcome to share.

1 commitment letter for construction period and quality of co., ltd.:

Upon receipt, your company will immediately organize relevant personnel to conduct careful research, and make the following commitments to the tenderee according to the scope, time limit, quality, safe and civilized construction, settlement materials, wage payment for migrant workers, warranty and other matters of the tender documents and contract conditions:

1. Commitment to contract conditions: acknowledge and accept the requirements of your tender documents and the constraints of contract conditions;

2. Time limit commitment: If our company wins the bid, our company promises to start construction within the specified time after receiving the notice of commencement, and complete all the project construction according to the contract time limit and node requirements;

3. Project quality commitment: ensure that the construction is carried out in accordance with the technical requirements and quality requirements of the bidding documents, and ensure that the project is qualified and meets the excellent engineering standards;

4. Commitment to safe and civilized construction: Strictly abide by the People's Republic of China (PRC) Law on Work Safety, Regulations on Work Safety Management of Construction Projects, Regulations on Work Safety License and other laws and regulations to ensure that no major accidents occur and achieve the following objectives.

5. Submit complete and effective settlement data;

6. Commitment to pay migrant workers' wages: establish a roster of migrant workers, publicize the payment of migrant workers' wages on time every month, and accept the supervision and verification of the labor and social security department and your company to ensure that migrant workers' wages can be paid in full and on time;

7. Warranty commitment: Our company promises to be responsible for any quality defects and their consequences of this project within the warranty period stipulated in the contract, and fulfill the warranty obligations in time according to the contract. Commitment unit:

Legal representative: xxx

Date: xx, xx, xx, XX

Commitment letter for construction period and quality 2 to: Co., Ltd.

Upon receipt of your tender documents, our company will immediately organize relevant personnel to make a careful study and prepare the tender according to the scope and requirements of the tender documents. Now, in combination with the actual situation of our company, we make the following commitments to the tenderee in terms of contract conditions, time limit, quality, safe and civilized construction, settlement data, wage payment for migrant workers, warranty and so on:

1. Commitment to contract conditions: acknowledge and accept the requirements of your tender documents and the constraints of contract conditions;

2. Time limit commitment: If our company wins the bid, our company promises to start construction within the specified time after receiving the notice of commencement, and complete all the project construction according to the contract time limit and node requirements;

3. Project quality commitment: ensure that the construction is carried out in accordance with the technical requirements and quality requirements of the bidding documents, and ensure that the project is qualified and meets the excellent engineering standards;

4. Commitment to safe and civilized construction: strictly abide by the People's Republic of China (PRC) Law on Safe Production, Regulations on Safety Production in Construction Projects, Regulations on Safety Production License and other laws and regulations to ensure that there are no major accidents and the construction site reaches the first-class safe and civilized site;

5. Commitment to submit settlement data: submit complete and effective settlement data at one time within the day after the formal handover of the project;

6. Commitment to pay migrant workers' wages: establish a roster of migrant workers, publicize the payment of migrant workers' wages on time every month, and accept the supervision and verification of the labor and social security department and your company to ensure that migrant workers' wages can be paid in full and on time;

7. Warranty commitment: Our company promises to eliminate any quality defects of this project within the warranty period stipulated in the contract.

Be responsible for the consequences caused by this and fulfill the warranty obligations in time according to the contract.

Commitment unit:

Legal representative:

Date:

Year month day:

Duration and quality commitment letter 3. If our company wins the bid, we must organize the construction in strict accordance with the contract and make the following commitments:

1. The construction quality of doors and windows has reached GB/T8478―20xx aluminum alloy doors, GB/T8479―20xx aluminum alloy doors and windows, GB50300―20xx unified standards for construction quality acceptance of architectural engineering, and GB502 10―20xx specifications for construction quality acceptance of architectural decoration engineering.

2. The quality grade is qualified.

3. If the unqualified project is not completed, our unit will compensate Party A for all the economic losses caused thereby.

4, the project production and installation time limit for a project to cooperate with the progress of civil engineering.

5. Planned construction period: the production and installation period of this project is coordinated with the progress of civil engineering, and the date of window frame entry is coordinated with Party A according to the actual situation.

6. We will pay a penalty of 1‰ of the total contract price for each day of delay in our production and installation period. If the construction period of production and installation is delayed due to Party A's reasons and force majeure, the construction period will be postponed accordingly.

7, put an end to serious injuries and fatal accidents.

Commitment unit:

Legal representative:

Date: xx, xx, XX, XX

Duration and quality commitment letter 4 My (name) team is engaged in the work of Building X at your company's project site, and ensures that everything is subject to the arrangement and command of your company's management personnel. If the team has any of the following conditions, I voluntarily accept the following corresponding punishment:

One, the team staff is not enough, did not reach the specified node time limit for a project, I voluntarily fined yuan/time;

2. If the workers do not obey the arrangement and command of your management, I will be fined RMB/time voluntarily;

3. Ask for overtime at night, and if any worker refuses to listen, I will voluntarily fine RMB/time;

Fourth, the amount of work that should be completed that day must be completed overnight, otherwise I will be fined voluntarily.

Five, after the process of work must wait for the previous process acceptance rear can be carried out, without the contractor, supervision and acceptance of the first construction, my unit voluntarily fined yuan/time;

6. If I fail to meet the specified quality requirements or leave my hands to clean up, and fail to rectify within the specified time, I will voluntarily be fined RMB/time;

Seven, not according to the requirements of the specification construction, safety accidents caused by the workers themselves, a fine of yuan each time, all losses shall be borne by myself;

8. Workers who contradict the general contractor or supervisor without authorization shall be fined RMB each time;

Nine, the whole class of workers in the living area, such as men and women live together, each fined yuan;

Ten, class workers in the dormitory, such as unauthorized wiring, or boiling water, or cooking something to eat, a fine of yuan each time.

Commitment: xxx

Commitment time: year month day

Commitment letter on the construction period and quality of XXX Co., Ltd.;

Upon receipt of your tender documents, our company will immediately organize relevant personnel to make a careful study and prepare the tender according to the scope and requirements of the tender documents. Now, in combination with the actual situation of our company, we make the following commitments to the tenderee in terms of contract conditions, time limit, quality, safe and civilized construction, settlement data, wage payment for migrant workers, warranty and so on:

1. Commitment to contract conditions: acknowledge and accept the requirements of your tender documents and the constraints of contract conditions;

2. Time limit commitment: If our company wins the bid, our company promises to start construction within the specified time after receiving the notice of commencement, and complete all the project construction according to the contract time limit and node requirements;

3. Project quality commitment: ensure that the construction is carried out in accordance with the technical requirements and quality requirements of the bidding documents, and ensure that the project is qualified and meets the excellent engineering standards;

4. Commitment to safe and civilized construction: strictly abide by the People's Republic of China (PRC) Law on Safe Production, Regulations on Safety Production in Construction Projects, Regulations on Safety Production License and other laws and regulations to ensure that there are no major accidents and the construction site reaches the first-class safe and civilized site;

5. Commitment to submit settlement data: submit complete and effective settlement data at one time within the day after the formal handover of the project;

6. Commitment to pay migrant workers' wages: establish a roster of migrant workers, publicize the payment of migrant workers' wages on time every month, and accept the supervision and verification of the labor and social security department and your company to ensure that migrant workers' wages can be paid in full and on time;

7. Warranty commitment: Our company promises to eliminate any quality defects of this project within the warranty period stipulated in the contract.

Be responsible for the consequences caused by this and fulfill the warranty obligations in time according to the contract.

Commitment unit:

Legal representative:

Date: Year Month Day

6 China Sanye Group Co., Ltd. Project Department Duration and Quality Commitment Letter:

In order to ensure the heat source, external network and terminal system engineering of Lianhuashan Integrated Management Center in Changchun

The construction period has been effectively realized, and our obligations in the labor subcontract have been fully fulfilled. On behalf of me, I solemnly promise to guarantee the construction period:

1. Submit the construction plan and schedule meeting the requirements of the subcontract within the specified time limit, and implement it in strict accordance with the construction plan and schedule approved by the project department. In the process of implementation, when we need to change the construction plan and schedule, we must first obtain the consent of the project department.

2. Complete all the work agreed in this subcontract within the specified time limit (April 20xx 1 day to August 3 1 day 20xx).

3. Our legal representative (entrusted agent) shall live in the construction site for not less than 24 days every month. When it is necessary to leave the construction site under special circumstances, it must be approved by Party A..

4. When changing the site construction team, technicians, special types of work and operators of important key processes, Party A must first obtain the consent, otherwise it is willing to bear all the adverse consequences such as construction delay.

5. Ensure that the site construction machinery and equipment are sufficient to match the construction project, and ensure its intact rate. Without the consent of the project department, we will not withdraw any major construction machinery and equipment from the site.

6. When the owner requires the project to catch up with the construction period or dry season, ensure that after receiving the written notice from the project department, unconditionally increase the mechanical equipment, personnel and materials to meet the requirements of the construction period or dry season.

Commitment unit:

Commitment:

date month year

Time limit for a project and quality commitment letter 7 (team leader)

Sichuan Lu Xian county Hong Xin construction labor service co., ltd

My (name) team is engaged in floor (~) work at the project site of your company, ensuring that everything is subject to the arrangement and command of your company's management personnel. In any of the following circumstances, I voluntarily accept the following corresponding punishment:

One, the team staff is not enough, did not reach the specified node time limit for a project, I voluntarily fined yuan/time;

2. If the workers do not obey the arrangement and command of your management, I will be fined RMB/time voluntarily;

3. Ask for overtime at night, and if any worker refuses to listen, I will voluntarily fine RMB/time;

Fourth, the amount of work that should be completed that day must be completed overnight, otherwise I will be fined voluntarily.

Five, after the process of work must wait for the previous process acceptance rear can be carried out, without the contractor, supervision and acceptance of the first construction, my unit voluntarily fined yuan/time;

6. If I fail to meet the specified quality requirements or leave my hands to clean up, and fail to rectify within the specified time, I will voluntarily be fined RMB/time;

Seven, not according to the requirements of the specification construction, safety accidents caused by the workers themselves, a fine of yuan each time, all losses shall be borne by myself;

8. Workers who contradict the general contractor or supervisor without authorization shall be fined RMB each time;

Nine, the whole class of workers in the living area, such as men and women live together, each fined yuan;

Ten, the whole class of workers in the dormitory, such as unauthorized wiring, or boiling water, or cooking something to eat, each time fined yuan; The above fines can be deducted from the salary as long as there is a basis and I don't need to sign it. )

Commitment: Commitment time:

Time limit for a project and quality commitment letter 8 According to the agreement, sign the project quality guarantee letter. A, project quality warranty scope and content:

During the quality warranty period, the contractor shall undertake the quality warranty responsibility of this project in accordance with the management provisions of relevant laws, regulations and rules and the agreement of both parties. (mainly including the design and installation of the construction drawing of this project)

The warranty scope includes: grid structure steel structure, roof color steel enclosure, glass fiber reinforced plastic lighting belt.

Second, the quality warranty period:

According to relevant regulations, both parties agree on the quality warranty period of this project:

1. Power grid steel structure is guaranteed for 50 years. Commitment letter of engineering quality.

2. The warranty for the color steel enclosure of the roof is 5 years.

3. The warranty period of FRP daylighting belt is 3 years.

Except for the above three quality problems caused by irresistible external factors, the quality warranty period shall be calculated from the date of project completion acceptance. Third, the quality warranty responsibility:

1, which belongs to the scope and content of quality warranty, the contractor shall, after receiving the warranty.

Notice to implement the warranty within 7 days.

2. In case of emergency repair accident, the contractor shall immediately deal with it after receiving the accident notice.

Arrive at the scene of the accident for emergency maintenance.

3. For quality problems involving structural safety, safety precautions shall be taken in accordance with the regulations, and the design unit or design unit with corresponding qualification grade shall put forward the warranty scheme, and the contractor shall implement the warranty. Four, warranty costs, warranty costs shall be borne by the party that caused the quality defects. Commitment letter of engineering quality.

The quality guarantee of this project shall be signed by the employer, contractor and manufacturer of the construction contract at the time of completion acceptance, and shall be valid until the warranty period expires.

This project quality guarantee is made in triplicate, with the Employer, the Contractor and the manufacturer (design unit) holding one copy respectively. Attached; A copy of the design qualification certificate and installation qualification certificate of the design unit.

Employer (official seal): Signature:

Contractor (official seal): Signature:

Design unit and manufacturer (official seal): signature:

X year x month x day

Commitment letter to XXX Co., Ltd. on time limit for a project and quality 9:

The outdoor landscape greening project of Huali Xixi Peninsula Business Center shall be undertaken by our constructor. According to the time limit requirements put forward by the leaders attending the meeting in the morning, we will make a construction progress plan, and we will be equipped with elite soldiers to serve you in strict accordance with the construction progress plan.

Within 16 days from April 8 to April 23, the construction work shall be arranged reasonably and effectively according to the construction progress, so as to ensure the completion of the construction period before April 24. If we delay the construction period and cause losses to you, we will be liable for compensation. Hereby promise

Zhejiang bada landscape projects department

Commitment: Mr. Zhang

20xx April 7th

Letter of Commitment on Construction Period and Quality 10 to: _ _ _ _ _ _ (name of the tenderee):

According to the bidding documents and in accordance with the provisions of _ _ _ _ _ _ _ _ _ _ _ _ _

1. We are willing to contract the construction and completion of the above-mentioned projects at the quoted total bid price according to the requirements of the above-mentioned drawings, contract terms, engineering construction standards and bill of quantities, and undertake warranty responsibility for any quality defects and comprehensive unit price risk responsibility. We understand the relevant provisions on bid quotation in the bidding documents and have no intention of asking for any explanation.

2. We will send _ _ _ _ _ _ _ _ (project manager's name) as the project manager of this project subject to tender. The project manager will earnestly perform the post responsibilities of the project manager, undertake the responsibilities and obligations of overall management of the whole project construction process and the whole site, and ensure the permanent presence at the site.

3. After winning the bid, the technical personnel and management personnel who put into the project will stay at the site and will not be replaced at will. If replacement is really necessary, it must be reported to the supervision company and the owner for approval.

4. Once we win the bid, we guarantee to complete and hand over all the projects within _ _ _ _ _ days stipulated in the contract agreement, and the project quality will reach _ _ _ _. Strictly implement the relevant engineering warranty terms.

5. If we win the bid, we will voluntarily submit the project performance guarantee to the tenderer according to the requirements of the bidding documents after winning the bid.

6. We agree that the submitted bid documents are valid within _ _ _ days of the bid validity specified in "Instructions for Bidding Documents". If we win the bid within this period, we will be bound by this.

7. All the information we provided is true. If the performance data provided by us is untrue or false, we will give up the right to win the bid and bear the responsibilities arising therefrom.

8. We have carefully reviewed all the bidding documents and bill of quantities, including the revised supplementary notice, Q&A (if any) and relevant annexes, and we fully respond to and recognize all the terms of the above documents.

9. The quality of building raw materials and components put into this project are products that have passed the quality inspection.

10, our unit will carry out the construction in strict accordance with the design drawings issued by the tenderer, and will not change the design drawings for construction without authorization.

1 1, the project manager department will formulate the construction safety management organization and safety management responsibility system, equip the full-time safety officer of the construction project, and earnestly implement the management regulations of various construction safety production and civilized construction. All construction personnel have received safety education and technical operation training, and operators of special types of work must hold corresponding technical qualification certificates.

12. Commitment to implement the addition and change projects within the scope of this project, and the expenses shall be completed according to the corresponding price in the tender offer or the approved price;

13. Unless another agreement comes into effect, your bid-winning notice and this tender document will become an integral part of the contract documents and be binding on both parties.

14. We understand the calibration method in the bidding documents, and we have no intention to ask for any other explanation.

Bidder: (Seal) Company Address: _ _ _ _ _ _

Legal representative or entrusted agent: (signature or seal) Tel: Fax:

Date: xx, xx, xxxx

Xinhua Animal Husbandry Bureau Fiona Fang 1 1 Commitment Letter on Construction Period and Quality:

If our unit is lucky enough to win the bid for Bid B of the 20xx standardized scale pig farm construction project of Xinhua Animal Husbandry Bureau, in the process of project implementation, in addition to responding to all the terms of the bidding documents and the contents of the performance contract, we will also make the following commitments to meet the construction period requirements:

First, ensure that the construction is carried out in strict accordance with the drawings and relevant specifications, and reach the qualified standards.

Second, formulate the time limit for a project management organization and safety management responsibility system, equip with enough safety production equipment and personnel, and earnestly implement the regulations on accelerating construction management.

Three, all engineering construction personnel ready to speed up the construction period in advance, and do a good job in ideological work.

Five, to ensure that within the time limit for a project, safe, high quality and efficient to complete the construction task.

Six, after receiving the letter of acceptance, sign the project contract, after the construction equipment has the conditions to start, ensure that it is completed within the time limit required by the owner, and if it is postponed, it is willing to compensate 0.03%/ day of the total project cost.

Bidder: Henan Fiona Fang Construction Co., Ltd. (Seal)

Legal representative or authorized representative: (signature)

Date: 20xx65438+1October 65438+July.

Commitment letter for the construction period and quality of XXXXXX company 12.

If our company is lucky enough to win the bid for XXXXX, we will make the following commitments to your company on the construction period:

1, the tenderer accepts all the bidding conditions in this tender.

2. The bidder guarantees that if our bid is accepted, as a bidder, it is willing to implement the provisions of the contract agreement and contract conditions in the bidding documents.

Commencement time: subject to the commencement order of the owner's project department.

Completion time: the actual completion time calculated in the commencement order is accurate.

Duration: according to the requirements of the commencement order and written instructions of the bidder's project department.

3. Contact Party A's management personnel after entering the site, and cooperate with Party A's construction period and related cooperation matters. The specific construction time of each construction period shall be subject to the construction task book issued by Party A. ..

Hereby promise!

Bidder: (Seal)

Person in charge of legal person or customer:

date month year

Commitment letter of project quality and time limit for a project (Eastcom)

Commitment letter for construction period and quality 13 If our company wins the bid, we must organize the construction in strict accordance with the contract and make the following commitments:

1, the construction quality of doors and windows reaches GB/T 8478-20xx aluminum alloy doors,

GB/T 8479-20xx aluminum alloy doors and windows, GB50300—20xx Unified Standard for Acceptance of Construction Quality of Building Engineering, GB 50210-20xx-20xx Code for Acceptance of Construction Quality of Building Decoration Engineering and other latest relevant national codes, regulations and engineering design drawings and documents.

2. The quality grade is qualified.

3. If the unqualified project is not completed, our unit will compensate Party A for all the losses caused thereby.

Economic loss.

4, the project production and installation time limit for a project to cooperate with the progress of civil engineering.

5. Planned construction period: The construction and installation period of this project is consistent with the progress of civil engineering, and the window frame

The entry date shall be coordinated with Party A according to the actual situation.

6. We will pay 1‰ of the total contract price for each day of delay in the production and installation period.

Ruojin. If the construction period of production and installation is delayed due to Party A's reasons and force majeure, the construction period will be postponed accordingly.

7, put an end to serious injuries and fatal accidents.

Commitment unit:

Legal representative:

Date:

Year month day:

Commitment letter of time limit for a project and quality 14 In order to ensure the smooth progress of XXX project undertaken by this unit, the following commitments are made:

A, quality assurance:

1, strictly implement the requirements of XX project and relevant notices, and implement XXX specifications and standards. Establish and improve the project organization and quality management system, clarify the responsibilities of each post, ensure the quality of project development, and ensure the smooth progress of project development.

2. Implement the post responsibility system for project managers. The project manager and the person in charge of resource package development are fully responsible for the project quality, responsible for establishing and improving the project guarantee system, regularly checking and coordinating, holding a project review summary meeting, and strictly implementing the reward and punishment system.

3, timely report to XXX, and accept the inspection, guidance and supervision of supervision experts and project management team.

Second, the construction period guarantee:

If we win the bid, our company will complete the development task on time in strict accordance with the requirements of the Project on the premise of ensuring the quality of the project.

1, organize reasonable measures:

1) is uniformly scheduled and managed by the project management team.

2) Implement the specific tasks of each development team in time and make preparations in advance.

2, the implementation schedule management:

1) Arrange plans every week, issue development progress indicators, and clarify responsibilities and tasks.

2) Hold a weekly coordination meeting to coordinate the work and development progress with the cooperative units, and solve the factors that delay the project development cycle in time.

In case of violation of the above terms, this unit is willing to bear all the consequences. If you break the law, you will be investigated for legal responsibility.

Commitment party: XXX

Signature of legal person:

Seal: 20XX year1October 30th.

Commitment letter of time limit for a project and quality 15 If our company is lucky enough to win the bid for expressway ramp greening project (BT project) in Aksu Economic and Technological Development Zone, we will make the following commitments on project quality (time limit for a project and safety) during the project implementation:

1. construction period: it shall be completed within 60 calendar days specified by party a (20xx:1March 7-1May 7) to ensure scientific construction. Organize reasonable measures to improve, implement schedule management, and comprehensively manage other coordination processes and construction progress. Solve the factors that delay the construction period in time to ensure the construction is completed on time.

2. Quality: strictly guarantee the quality according to the drawing design and Party A's requirements.

3. Safety: No major accidents and no personal injuries.

Bidder: (official seal) XXXXX Co., Ltd.

Legal representative or authorized agent (signature)

Date: June 20xx 14