Sewage treatment equipment before the installation of what to pay attention to

1, sewage treatment equipment installation project before construction should have the design and construction drawings or equipment technical documents, and temporary transport roads, water, power, lighting and other facilities, the main materials and machinery, labor force to make reasonable arrangements.

2, sewage treatment equipment installation project before construction, the corresponding civil engineering should be basically completed, when the installation project must be coordinated with the civil engineering construction, the equipment foundation, flooring, pipeline trench should have been completed, the concrete strength of not less than 75% of the design strength, the construction of construction sites near the construction materials, debris, etc. should be removed.

3, sewage treatment equipment using the building structure as a temporary lifting bearing point, the structural bearing capacity should be necessary calculations, and obtain the consent of the design department after use.