Engineering staff work plan

The rapidity of light, a blink of an eye will be over, our work will be busy again in the rich, in the joy of harvest, at this moment need to develop a detailed plan. Plan in the end how to draw up is appropriate? The following is my collection of engineering staff work plan 5, just for reference, I hope to be able to help you.

Engineering staff work plan Part 1

First, engineering: the store's routine repair and maintenance

1, the company's engineering staff in the stores to complete the departments reported more than 4,000 pieces of maintenance documents, oral repair more than 20xx, to deal with a number of sudden equipment, facilities failure.

2, the engineering department in last year's work, and on the basis of the development of a detailed equipment, facilities maintenance plan, the plan is broken down into quarterly, monthly, and detailed description of the maintenance content, implemented to each person, to protect the quality and efficiency of the work.

3, the year completed a large-scale maintenance and accident repair projects: ① Xuanhua store kitchen department sewer trunk thoroughly dredged and cleaned up once; ② municipal residents clogged drain wells to the kitchen department to return to the water to clean up once; ③ transformation of the roof of the smoke pipe once, to solve the problem of complaints of the residents on the top floor; ④ Xinyang store in order to alleviate the pressure of electricity, the addition of transformation of the main cable 2, not only solved the problem of electricity, but also solve the problem of hidden safety hazards; ⑤ Xinyang store in order to alleviate the pressure of electricity, additional transformation of the main cable 2, not only solve the problem of electricity, but also solved Safety hazards; ⑤ Xinyang store rear building access renovation, through the kitchen with the head of the study, in order to dish out the needs of the kitchen needs to increase the gas stove, but because of the narrow space, the difficulties, after repeated studies, measurements, and ultimately decided to make use of the rear building access, and added a new 380 kg tank, that is, to solve the procurement of the difficulties of the winter to buy oil, and also to ensure that the Department of the use of the; ⑥ Xidazhi Street store business area, bathroom, sewer trunking Area, bathroom, sewer trunk clogging, faced with the inability to operate; overnight repair ⑦ Xidazhijie the first floor of the main electric switch burned out, the entire first floor of the power outage, affecting business, overnight repair.

4, Xuanhua store renovation and transformation period, infrastructure renovation projects in line with a long-term planning for construction, based on the purpose of the front, stay strong, to overcome the short time, narrow site, the various aspects of the intricate and complex harsh environment, to complete the following: ① the overall integrated wiring design, construction; ② the indoor heating facilities for a full range of renovation, the overall design of the whole building according to the type of heating after the type of heating, after the whole building! After the overall design according to the type of household heating, the whole building does not need to be constructed indoors for household heating, and this work is completed once and for all. ③ water trunk line original distribution is unreasonable, and is iron pipe by long-term corrosion has been a number of leaks, by requesting the General Office, there are hidden dangers of indoor iron pipe all replaced with PPR thermosoluble pipe, and do a reasonable layout, to do once and for all.

④ In order to be safe and warm, two additional security doors were installed in the back hallway, a small doorway, and a 400kg fuel tank.

⑤ The overall transformation design of the air supply, exhaust, bathroom ventilation ducts and air conditioning, piping, circuit location, the rational use of space, the use of verification, good results.

5, the year completed a major repair and maintenance projects:

① Xinyang store heating boiler large-scale repair, maintenance; ② Xinyang store kitchen exhaust pipe cleaning oil (20 meters), from the exhaust hood to the exhaust fan; ③ Xidazhijie store to replace the flat plate hot air curtain; ④ Xidazhijie kitchen exhaust pipe cleaning oil (30 meters), from the exhaust hood to the exhaust fan; ⑤ completed the shop's exhaust pipe cleaning oil (30 meters), from the exhaust hood to the exhaust fan; ⑤ the shop's exhaust ducts, the exhaust fan; ⑤ the shop's exhaust ducts, the exhaust pipe, the exhaust duct, the exhaust fan. fan; ⑤ completed the stores of air conditioning, exhaust fan, external machine, annual cleaning, maintenance work.

⑥ fixed asset management: the purchase of fixed assets, management, supervision, repair, maintenance.

⑦ Xinyang store, Xidazhi Street store engineering room tool placement. Material storage environment health according to the company's requirements for the overall improvement. At the same time, the staff to strengthen the ideological education. The overall quality of the staff's thinking to a higher level. To enhance the overall quality of enterprises and long-term planning to lay a good foundation.

Second, the night duty, security, fire prevention work

1, the store night duty, security inspections totaled more than 8000 times.

2, the store night duty personnel throughout the year, no off duty, missed duty, leave and other disciplinary phenomena.

3, the store outdoor facilities protection network set up a reasonable layout, durable, no security risks.

4, complete fill in the night duty record book more than 30 books.

5, each store additional circuit inspection mechanism, no less than 8 times a day peak electricity, wires, cables, the temperature check to ensure safety.

6, the stores on time to complete a monthly joint safety inspection.

7, in the company's stores, the cooperation of various departments, to ensure that the year stores without security incidents, to the company's safe operation to lay a good foundation.

Third, the work of outreach

1, Xuanhua Street store renovation and transformation period, in order to the overall safety, convenience, health considerations, approved by the General Office, plans to cook the Department of the original use of gas tanks transformed into a gas pipe, through the declaration of the application, learned that due to the lack of gas in the old city, is now not to increase the number of new users, and by the gas company's departments to coordinate with the many. Gas company departments to coordinate, with the assistance of the engineering staff, Master Zhao, to overcome the many difficulties and difficulties, and finally successfully completed the installation task, is now used to verify that the effect is good.

2, Xuanhua store front door plaque due to the Xuanhua Street overall facade transformation affected, the construction side and the Law Enforcement Bureau jointly issued a demolition notice, I received the notice after the store and the General Office of the report, decided to try to keep the original plaque, led by the General Office of the General

General Manager Yang to the Department of Administration as the main focus of the coordination and efforts, and ultimately to make the store facade plaque to be retained for most of the company's plaques in the future! The use of the strength and social benefits.

3, Dacheng store due to the building facade renovation and reconstruction requirements of my store will be demolished and rebuilt exhaust pipe, after reporting with Mr. Yang, Mr. Yang instructed to try to keep, in the support and assistance of Mr. Yang, many times with the construction party in charge of negotiating with the upstairs neighbors, to obtain their tolerance and understanding, and ultimately to take the other way of heat preservation and modification to the company to avoid the economic losses.

4, completed the work of the stores dormitory renewed room fee, there are two conditions of the dormitory is not ideal for the replacement work.

5, the store for employees temporary residence permit and police station outreach work.

6, Xuanhua store, Xidazhijie store, Dacheng store for plaque license outreach work has been successfully completed.

After such an intense and orderly year, I feel that my work skills on a new level, do every job has a clear plan and steps, action also has a direction, the work also has a goal, really do have a bottom in mind! Basic to do a busy but not chaotic, tight but not scattered, clearly organized, things are clear, fundamentally get rid of the just joined the work only focus on hard work, do not know the phenomenon of summing up experience. In this way, I walked into this year from the infinite busy, and from the infinite easy out of this year, and, at the same time in the work, I also understand the reasoning of the people, but also understand the need to have a good state of mind, a work of enthusiasm and its sense of responsibility! In order to do a good job in a practical way. The new year is coming, the face of the catering industry is increasingly competitive reality. As well as facing the problem of aging facilities and equipment. The Ministry of Administration engineering fully combined with the existing situation of the hotel to do a good job next year's work plan to make up for the shortcomings of the previous year's work.

Engineering staff work plan Part 2

First, the main content of the work completed this month:

1. Completed the temporary work tasks assigned by the superiors.

2. Completed the installation and dismantling of holiday decorations at the clubhouse door.

3. Completed the decoration of the May 4th Youth Day party venue and the regulation of stage lights.

4. Completed the maintenance and repair of the air conditioning units of the clubhouse, driving range, and villas 1, 2, 3, 6, and 7 in Heron Park, and converted the refrigeration mode for debugging.

5. With the environmental protection team to complete the areas of grease trap and septic tank emptying.

6. With Haier after-sales service personnel to complete the clubhouse weak power plant room and strong power distribution room air-conditioning unit installation and harmonic garden 5, 6 water heater installation.

7. Completed the installation of two TV sets in No. 6 Harmony Garden and repaired the bathroom basin and bath hot and cold water switches.

8. With the road and bridge company to complete the repair of the outdoor leakage pipe between No. 6-7 Heron Park.

9. The office desk of the Ministry of Human Resources was dismantled and a telephone was installed.

10. With the cleaning company to complete the staff restaurant, the water restaurant, the harmonic garden 1 restaurant kitchen exhaust cleaning.

Second, this month's unfinished work content and reasons:

Unfinished work content: did not complete the regional air-conditioning units and indoor air conditioning unit overhaul and maintenance, only part of the unit overhaul.

Reason: due to the regional equipment units and indoor units need to overhaul the project is more, coupled with the lack of engineering and technical manpower and other reasons.

Third, this month's work problems and treatment measures:

Problems: with the depreciation of the service life of a variety of equipment units, the living area, sewage treatment station, Harmony Park 1 and other four sewage pumping pumps fail, can not be opened normally use.

Treatment measures: timely use of temporary pumping to empty the pool of sewage will be the existence of faulty pumps pulled out, after inspection, the motor coil burned, the need to rewind the coil, in the case of the coil we can not repair, reported to the leadership of the company, requesting outside the professionals to wind the coil, after obtaining the consent of the leadership, in conjunction with the purchase of the motor will be pulled out of the repair, now 3 pumps have returned to normal use.

Fourth, the next month's work plan

1. To complete the temporary work tasks assigned by the superior.

2. With the environmental protection team to complete the cleaning of grease traps and septic tanks in various areas.

3. Cooperate with the air-conditioning system installation unit to complete the repair of the air-conditioning unit and water flow switch of No. 5 Heron Park to ensure normal opening and use.

4. Continue to the Heron Garden 11 villas and the Harmony Garden 1, 2, 3 Mansion air-conditioning unit maintenance and conversion of refrigeration mode trial run debugging.

5. Completion of all the wooden houses in the Harmony Garden indoor air conditioning vent filter cleaning.

6. Control saving water, electricity, compression of water and electricity energy consumption, on time switch landscape lighting, street lights and air conditioning units.

Fifth, the need for the company or other units to cooperate with the content of the work

With the normal operation of the stadium, the depreciation of the service life of the equipment and facilities, a variety of equipment maintenance rate continues to increase, we are in short supply of engineering and technical maintenance personnel, looking to the Ministry of Human Resources to speed up the recruitment of engineering and technical personnel.

Engineering staff work plan Part 3

Thank you for the introduction of the Hou manager, XXX recognition and appreciation I entered the XX company on April 28, 20xx with a happy, yearning mood, until today has been more than 1 year and 8 months, more than a year in this time, through the total of Yuan`s `cultivation, the leaders, colleagues, care support, help, I realize that I am making progress, really for the company to do something. Do something. Combined with their own reality, my job duties company website management, daily and timely check the products of various platforms to promote the first situation, the customer's browsing situation, timely reply to customer's message information, customer mail checking and receiving, the preparation of each supplier / demand for business contracts, the purchase of products, the cycle of asking for the recent price of the products to be purchased, the sales of the products, the tracking of the customer, the company's document management, the general manager of the Yuan and the temporary affairs assigned by the colleagues. Colleagues assigned to the temporary affairs of ......

Since joining the job, I love their own work, and has always been to do the following: hard work and dedication, dedication, conscientiousness, listening to the leadership arrangements, and colleagues get along with the relationship between the more harmonious, as the company as a home idea! ...... I have some advantages, but there are many shortcomings, such as: not efficient enough to do things, consider things not long term and systematic, lack of business knowledge, customer communication is not smooth enough, not bold enough to handle things, careful ...... I believe that through my efforts I will say goodbye to these shortcomings and synchronize with the advantages ......

My future efforts are: to set up a good self-image, to become a role model for colleagues in the work, depending on his / her people's affairs as a responsibility, and to become a trusted partner of colleagues in life. Seriously arrange the specific time of the work, prioritize and prioritize the work, so as to be reasonable, orderly and effective. On time to complete the specific work assigned by the leadership, without delay, as far as possible to avoid the possibility of error, start and finish, the progress of work timely report to the leadership, so as to facilitate the leadership can coordinate the overall situation, flexible arrangements. More to the leadership, colleagues learn from the work method, more work with everyone in the coordination, communication, from the big trend, the pattern to think, to plan, to learn from all the strengths, to improve their own level of work; improve the quality of work, with a strong sense of enterprise, a high sense of responsibility. After each thing is done, think, summarize the work, really make the work of the plan, have to implement. Find out the shortcomings of the work, do good self-reflection; love and dedication, hard work and dedication, can not work for the work, daily work initiative rather than passive coping, proactive work, good planning and practical work, so that willing to do things, dare to officer, able to officer, will officer; in daily work, meetings, leadership speeches and other occasions, do have a concentrated attention, sensitive reaction, deep understanding, solid Memory, witty synthesis and superb characterization; in the process of doing things, do not say words without basis, do not do things without certainty, do not wish easily, words must be done, the line must be fruitful; to cultivate their own comprehensive qualities, improve their own business capacity, in order to XX tomorrow to dedicate themselves to the cause of their own power to make a greater contribution to this job.

Since entering the XX company, I have always regarded myself as a XX company owner of a child, the company's grass and trees have the responsibility and obligation to care, even a piece of garbage on the ground, I hope that because of my presence and become a green, environmentally friendly lawn or flowers; I am very happy to be able to learn with all of you, together with the progress, because I hope that I am exposed to the crowd of people in each one are quality, educated, capable of making progress, and I hope that I can make a contribution to the development of the company. I hope that every one of the people I have contacted is a talent with quality, cultivation and ability to bend and stretch, so that every person who has been to XX Company can feel the culture and enthusiasm of XX, and every person who has contacted XX Company can leave a deep and good impression on the other party! My life creed is: live every day fully and without regret!

I have always been grateful to Mr. Yuan and the leadership of the careful cultivation and carry, the progress of the work can not be separated from the leadership and colleagues of the point, but also thank you for the leadership of colleagues a year I do not have the experience of work or sometimes a colleague to do some things I do not enough timely enough in place, please bear with me, in the future, I will be to the punctual, high efficiency place to work.

Today I am very happy to share with all of you here in the work experience, we will work together to fight for XX company to build a better tomorrow and strive to advance in 20xx year is coming to an end at the same time, I wish you all a happy Chinese New Year, more life in 20xx years, invincible; I wish the XX company career day new, ambitious development! Thank you all!

Engineering staff work plan Part 4

xx year is the 12 standard project department engineering task heavy year, is to ensure that the schedule, on time to complete the overall goal of the key year. In order to clarify the responsibilities of the Ministry of Engineering and Technology, the implementation of the "first-class industry, to achieve customer expectations, dedication to the satisfaction of the project," the quality policy, to achieve the "completion of the project acceptance rate of 100%, the quality of reputation to reach the industry's advanced level," the goal, combined with the actual situation of the project department and the characteristics of the project. The actual situation of the project department and engineering characteristics, especially the development of engineering and technology department xx year work plan. xx year work plan mainly has the following aspects:

First, the cultivation of new trainees

Engineering and technology department of several technicians just graduated not long, the work of the initiative, initiative, technical and theoretical knowledge reserves to meet the job The need, but in the theory and practice, the construction site of the day-to-day affairs, the handling of emergencies, the details of the project quality control and key points and so on, there are still deficiencies. In the daily work of the actual need to strengthen the new trainees to help, help, bring, so that they can become a unique technical talent, while improving the overall quality of the Engineering and Technology Department. Combined with the characteristics of this project, the engineers and technicians are required to subdivide the sub-control points, so that they can have a clear idea when they are at the construction site, and can deal with the problems when they encounter them, so as to enrich their own knowledge and improve their own quality. Take the current construction of bored piles as an example, the engineers and technicians are required to master the following aspects of knowledge:

1, bored pile mud control

To master the drilling process and concrete filling before the mud control standards, different strata require different mud indicators, the construction process should be timely according to the specified test methods to determine the mud, to ensure that the specific gravity, viscosity, sand content, etc. to meet the requirements for the mud, to ensure that the mud, the mud, the mud, the mud, the mud, the mud, the mud, the mud, the mud, the mud, the mud, the mud, the mud, the mud, the mud, the mud, and the mud, Sand content and so on meet the requirements, for the smooth progress of drilling and concrete pouring to lay a good foundation.

2, drilled pile reinforcement system security

Reinforcing steel inspection to check the reinforcing steel varieties, grades, specifications and quantities; longitudinal joints, quantity, quality; cage diameter; longitudinal spacing; longitudinal length; hoop spacing; reinforcing hoops spacing, etc., such as the discovery of substandard products, timely replacement of the treatment to ensure that it does not affect the next step of the construction.

3, drilled pile concrete pouring

drilled pile before pouring, to check the mud index, the thickness of slag at the bottom of the hole, the depth of installation of reinforcing cages, concrete fall, the airtightness of the conduit, the length of the conduit and so on whether it is in line with the requirements, unqualified can not be poured; the process of pouring to pay attention to the initial amount of concrete, the depth of the conduit, the new concrete fall, the total time of pouring concrete and other controls. The main points to ensure the smooth progress of drilled pile pouring and pile quality.

4, diaphragm wall construction

The construction process of diaphragm wall is basically the same as that of bored pile, and new trainees will be trained collectively at the construction site when the site starts. Explain the points of attention and control in the construction. Other sub-projects are also the same, in the construction of the project before to master the construction methods, quality control points, in the construction site to see more, think more, more communication, responsible for sub-projects quality assessment, the delivery of the project to keep good quality. The accumulation of technical experience, in addition to their own practice, but also inseparable from the guidance of others to help. In addition to internal discussions, on-site guidance, mutual learning, the staff of the Engineering and Technology Department also plans to invite leaders to give lectures from time to time. The leaders of the project department are all technicians from the beginning, and have accumulated solid and rich construction experience, which is a valuable asset for the engineering and technical personnel. Please leaders to lecture, not only can play a role in the transfer of knowledge, but also to the younger generation to play an encouraging role.

Through lectures, it can improve the knowledge level of technical personnel, accumulate experience, and enhance confidence for construction practice. The accumulation of technical experience, the effect of training new students is not only reflected in the field construction of the actual control ability to improve, but also in the academic achievements. Through the usual QC activity group and other practical ways to accumulate materials, by the end of the year or the end of the year, through the QC activity group results, five small results, scientific and technological papers, etc., all the staff of the Department of Engineering and Technology, each person strive to complete one or two papers or results, to report to the leadership of the growth of the situation in the year xx.

II. Internal data management

In order to improve the management of the completion of the data and organize the archiving situation, so that the data is more organized, easy to manage, data collection and organization requirements, xx year to collect the information content include: 2.1, construction management records 1) unit engineering start report (overall start report) 2) testing unit qualification declaration information 3) design changes 4) records of drawing review and minutes of meetings 5) overall construction organization design and approval 6) construction plan for each important process xx special construction plan to be completed and reported in xx: ① on time to complete the four stations of the main structure and waterproofing structure of the construction program compilation and reporting work. ② On time to complete the four stations scaffolding, high supporting molds, concealed excavation, demolition, demolition, blasting engineering safety special program preparation and reporting work. Preliminary determination of the special construction program reporting time as table

Construction program reporting schedule Unit project name Preparation of the content of the main structure of the construction program waterproofing construction program Renhe station scaffolding safety special program of high support mold safety special program demolition and blasting safety special program main structure of the construction program waterproofing construction program Longqui station scaffolding safety special program of high-support mold safety special program demolition and blasting safety program Safety Special Program Demolition and Blasting Safety Special Program Main Structure Construction Program Waterproofing Construction Program Gaozeng Station Scaffolding Safety Special Program High-support Molding Safety Special Program Demolition and Blasting Safety Special Program Safety Special Program Slope Construction Above 6m Safety Special Program Main Structure Construction Program Subsidiary Enclosure Structure Earth Excavation and Supporting Special Program Waterproofing Construction Program Subsidiary Waterproofing Program for New Airport South Station Special Program for Scaffolding Safety Special Program for Demolition and Blasting Safety Special Program for Concealed Excavation Safety Special Program Completion Time xx-5-30 xx-5-30 xx-7-1 xx-7-1 xx-7-1 xx-7-15 xx-7-15 xx-8-1 xx-8-1 xx-8-30 xx-3-15 xx-3-15 xx-3-25 xx-3-25 Release check list project axis measurement (retesting) records 4) control measurement test results 5) construction measurement program 6) encryption point report 2.3, building materials quality records, structural test records (4 copies of the project department to ensure that the witness record as long as a copy of the record) 1) building materials test report 2) incoming raw materials inspection sheet and accessories (accessories include: quality certificate, raw materials inspection report), including supervision and sampling report. The 3) Witness records (as long as two sets, a set of original) 4) commercial concrete proportion design reports, notification and annexes 5) piling test data 6) all the strength of the concrete report 7) semi-finished product inspection reports (mainly for the welding of reinforcing steel) 8) commercial concrete construction batching notification, stage of the raw material inspection reports (including sand, stone, fly ash and other raw material inspection reports) concrete quality Certificate of Conformity of concrete (provided by mixing plant). 2.4 Construction records and test batches 1) Collect and fill in according to the division of sub-parts of the project. 2) construction log (only two sets, a set of original) All of the above information must ensure that the signing of the completion, do not appear to omit, omission of signing the phenomenon, and in a timely manner to organize the archives.

Third, on-site construction control

Construction control on-site includes several aspects of the content: pre-construction technical preparations, construction control, completion of the inspection and control, construction surveying and engineering tests. Among them, construction surveying and engineering test throughout the construction process, is the foundation and focus of construction. 3.1 Pre-construction technical preparatory work The pre-construction technical preparatory work stage is the next step in the deployment of engineering tasks, to understand and plan for the next step, to carry out the following work: 1, project overview, construction conditions and external environment, sorting out the information that has an impact on the construction of the project; 2, the construction of the deployment and task division; the key project to determine the construction arrangements; 3, the technical and organizational measures: including the use of new technologies, new techniques, new technologies, and new construction methods. The use of new technologies, new techniques, increase production and saving, quality and construction safety measures; 4, the number of major machinery and equipment and power supply, transportation, water supply; 5, the number of major materials and supply plans; 3.2 construction control Construction control is the key to the success or failure of the quality of the project, the construction of the inspection of the content and requirements are as follows: 1, construction surveying and placement to be correct, the precision to meet the specified requirements; 2, in strict accordance with the design documents, construction drawings and technical drawings. Design documents, construction drawings and technical specifications, operating procedures for the organization of construction; 3, materials, finished products, semi-finished products and equipment, such as factory inspection certificates, and according to the provisions of the on-site testing; 4, concrete, mortar inspection specimens, earth tamping densities in accordance with the provisions of the test and to meet the requirements; 5, the team to carry out the "three inspections" activities and records; 6, checking the completed project quality control. There are records; 6, check the completed project parts and quantity, and quality grade approval. 3.3 Inspection at the time of completion The inspection at the time of completion is to grasp and summarize the sub-projects in general, and if there is any problem, it should be solved as soon as possible so as not to affect the next step of construction. The contents and requirements of inspection at completion: 1. Check whether the position, size, elevation, quantity and quality of completed works are in accordance with the contract and requirements of design, specification and inspection standard, and if any problems are found, they should be dealt with as items and completed within a time limit. 2. 2. Whether all kinds of completion data meet the requirements. 3、Check whether the project quality assessment information is complete, and whether the approved quality grade assessment is correct. 3.4 Construction Surveying The construction surveying shall carry out and comply with the Law of the People's Republic of China on Surveying and Mapping and the regulations on surveying and mapping management of the place where the project is located, and shall strictly carry out the relevant national standards on surveying and technical specifications and the relevant regulations on quality, environment and occupational health and safety management of the project. Good or bad construction surveying is the key to the smooth implementation and quality control of construction projects. In order to provide high-quality and efficient service, ensure the quality of project measurement, and ensure the completeness and accuracy of the measurement archive data, the measurement plan for the year of xx is as follows: 1. Organize with the supervising engineers to connect the guide line and elevation measurements of the adjacent projects to ensure the correct spatial position of the project, and to ensure that the project is correctly connected with the adjacent projects and to establish a complete quality assurance system. 2. Organize the preparation of the measurement plan and the monitoring plan of the various branches. 3. Organize the work of measuring engineer of each division to review the drawings of each station 4. Organize the calculation and review of the detailed sampling data of two divisions 5. Organize the contact measurement (casting point) of each division according to the specification requirements 6. Organize the regular re-testing of the guide line points and encryption point protection of the two divisions 7. Implement the monitoring work of the two divisions according to the requirements of relevant subway specifications. To strengthen the four stations test work, to ensure the excellent quality of the project and the completion of data collection and organization, xx years of engineering test plan is as follows: 1, on the division of the test work of monitoring, guidance, management work; 2, supervise the station testers to do a good job of raw materials into the field of sampling, sampling and collection of data, and do a good job of all the records (accounts). 3, do a good job of concrete (commercial), and the concrete (commercial). 3、Do a good job of quality control of concrete (commercial concrete) construction, such as slump, compatibility, water secretion, etc., and according to the relevant norms and standards to do a good job of concrete specimen marking, maintenance, and standardized room temperature, humidity record management, timely delivery of test pressure, and timely receipt of relevant reports. 4, the development of testing, testing weekly plan and related management methods. 5, every Sunday to the stations to collect test data, archiving, filing. 6, in strict accordance with the national norms and requirements of the metro project, the implementation of the four stations of the test work.

Four, summarize

Through the training of new students, engineering and technical personnel to help each other learn, the leadership of the transmission of the practice of the construction site and other different forms, and strive to improve the overall level of technical staff of the Ministry of Engineering, to ensure that the technical staff can be competent for the work of the work of their own, the quality of the project strictly to ensure that the quality of construction works. The goal of the project is realized and new talents are transported to the enterprise. Engineering Technology Department xx year's work plan is the engineering technology department's action guide, engineering department of all technical staff in strict accordance with the work arrangements, due diligence, conscientiously carry out the implementation of the state, the group company's guidelines on quality, policy, study and implement a variety of construction specifications, standards, rules and regulations, responsible for the division, sub-projects, the quality of the project assessment for review, to keep a good technical quality, for the successful completion of the project, to realize the expected benefits and make a contribution.

Contribute to the successful completion of the project and the realization of the expected benefits.

Engineer work plan Part 5

Time like water, years like a shuttle, and in the blink of an eye to enter a new year - XX year, the New Year to have a new atmosphere, in the summary of the past at the same time I want to have a good work plan for the new year, so that we can have a greater progress and achievements in the new year.

XX is a very important year for the development of our company, for myself is also a year full of challenges, opportunities and pressures of the beginning. I want to continue to uphold the "well-designed, dedicated service" concept to do their jobs.

In the next year's work, I will continue to summarize their own work experience, analysis of their own work, to find the shortcomings to be corrected. Keep up with the general direction of enterprise development, enhance their own technical level. While completing my work wholeheartedly, I will actively participate in the engineering and construction exams related to my specialty. Strictly demanding themselves, and constantly improve their own requirements, improve the quality of work to meet the company and their own development, but also in the daily work of the implementation of the embodiment.

The new year means a new starting point, new opportunities, new challenges, the future is never because of its uncertainty and let us full of passion. I seem to have seen the light of our department to become strong, I will retain the essence, discard the dross, not purely to complete the task and work to create profits to enhance their own value. I will be more full of enthusiasm into the work of the work, and all the staff of the company *** with learning, *** build harmony, *** create brilliant!