Flood control program

In order to ensure that things or work from a high starting point, high quality, high level of development, it is often necessary to formulate a program in advance, the content and form of the program should be centered on the theme to carry out, and ultimately to achieve the desired effect and significance. Then how to develop the program? The following is my carefully organized flood prevention and flood control program sample (general 6), welcome to read and collect.

Flood control program 1

First, the purpose

Through the flood emergency plan simulation exercise, to improve the staff in the flood after the occurrence of resilience, test the branch of the flood after the occurrence of the rescue organization ability. Through the exercise to assess the actual effect of the functional rescue team, improve the business level of the functional team members, through the exercise to verify the feasibility of the plan and shortcomings.

Second, the simulation title

Suppose we get a warning reminder, the recent rainfall is too large, easy to cause flood disaster. The project department immediately start the flood emergency plan, flood rescue.

Third, the drill time

Scheduled for June 6, 20xx 1:30 p.m. to open a preparatory meeting to explain the requirements of the drill, 2:00 p.m. immediately into the drill.

Four, drill location

Shenyang Metro Line 2, the fifteenth section of the construction site.

V. Participants

Metro Project Department flood rescue team, medical rescue team.

Sixth, the drill program

1, alarm

Flood alarm is very important, early alarm can make the flood rescue work in the beginning of the flood, timely control of the spread of flood conditions and expansion. Flood control duty personnel in the first alarm, reported to the project manager, deputy manager of security, safety and quality department.

(1) alarm content should include: the occurrence of flood time, location (location), flood control measures being taken.

(2) All personnel on the scene have the obligation to alarm, the alarm content should be accurate and clear.

2, receive the report

(1) Whether it is the project manager, deputy manager of safety, or the Department of Safety and Quality to receive the report, as soon as possible to notify the rescue team to prepare for the rescue, and rushed to the scene of the flood control in a timely manner.

(2) Understand the time, location, extent of injury range of the accident

(3) Make a record

(4) Notify the rescue team

(5) Report to the relevant departments and leaders of the higher level

3. Emergency Rescue Actions

(1) The project department's flood control and emergency command team should be in accordance with the category of the flood immediately after receiving the alarm, and according to the flood incident Disaster procedures and the scope of the situation involved, unified coordination and command, emergency mobilization of all types of rescue teams to participate in rescue rescue rescue, if necessary, please ask the relevant external forces to the scene to support.

(2) the command team responsible for each person in accordance with the requirements of the on-site command, emergency mobilization of appropriate materials, equipment, personnel to implement emergency rescue or rescue.

(3) the accident occurred in the event of power electricity, should be cut off immediately, and quickly restore the damaged roads, water, electricity and other facilities to ensure that the emergency rescue work is carried out smoothly. Prevent the occurrence of secondary accidents and disasters.

(4) safety and security team into the flood site within 5 minutes, to do a good job on-site traffic maintenance, channeling and evacuation of personnel, prevention and prevention of all kinds of destructive activities, maintenance of law and order.

(5) medical care rescue group after receiving the flood accident report, to quickly go to the scene, mobilize medical personnel and vehicles, responsible for the injured to the designated hospital to implement rescue.

(6) material and equipment protection group should ensure timely transportation of emergency ambulance supplies in place according to the order of the on-site command.

(7) other relevant personnel should also be based on the orders of the on-site command, and actively cooperate with the rescue work.

(8) In the process of rescue and relief work, the emergency call for equipment, materials, personnel and occupation of the site, etc., shall not be blocked or rejected for any reason. Reasonable compensation shall be given after the completion of the rescue and relief work.

VII, drill summary

(1) the main problems found through the drill

(2) the main body of the evaluation of the drill

(3) the contents of the drill procedures for the improvement of the contents of the plan

(4) emergency equipment and facilities to meet the requirements of the emergency

(5) through the drill to summarize the experience

(6) How to solve the problems in the exercise.

Eight, the drill please resident supervisor to participate in the guidance, and will summarize the drill reported to the Supervision Department.

Flood prevention and control program 2

Do a good job of flood control, to ensure the safety of the property of each construction site under construction and the safety of the lives of construction workers is critical. Combined with the actuality of our town, we have developed this work program.

First, the work objectives

Adhere to the "safety first and unremitting to prevent the main all-out rescue" approach to flood control, strengthen the organization and leadership of the work of production safety in the construction site flood season, strengthen the supervision and precautionary measures, and early development of precautionary measures and deployment of the work, resolutely curb the safety and security of the work of the construction site. Deployment of the work, resolutely curb the occurrence of production safety accidents, to ensure safe flooding.

Second, the organizational leadership

The establishment of the flood season in the construction site safety production leading group:

Leader:

Deputy Leader:

Members:

Third, the flood control measures

The construction site Practical measures must be taken during construction to reduce the damage caused by flooding. Flood control work to take the initiative to control early study early layout early start early implementation of prevention.

(a) strengthen organizational security, clear responsibility

The construction site should be set up to flood control leading group, combined with their own practical development of practical flood control and emergency rescue work program, develop a responsibility system, and will be responsible for the implementation of the breakdown to the individual.

(B) make material resources to prepare, build emergency rescue team

The construction site should be combined with the specific circumstances of the project, do a good job rain coat rain shoes flashlight ambulance stretcher commonly used ambulance supplies shovels bags of woven sand gravel vehicles and other supplies to buy and stockpile the work, and at the same time, we must organize the establishment of the emergency rescue team of strong personnel and ensure that the accident can be the first time into the emergency rescue work to go. The work of the rescue to go.

(C) to strengthen flood prevention and publicity, emergency rescue drills

The construction sites should make full use of banners, radio and television staff meetings and other effective ways to carry out flood prevention and knowledge of publicity and education, enhance the workers' awareness of disaster prevention, and in the pre-flood organizations to carry out an emergency rescue drills.

(D) to carry out flood safety production inspection

The construction site to carry out flood safety production self-check, one is to check the implementation of the project's main responsibility for flood safety production, the flood safety production measures and responsibility for the implementation of the specific aspects of the post and the situation of the person responsible for it; the second is to check the construction site of the construction site temporary workshop dormitory barns warehouses and other facilities of the safety and security, and to try to avoid the possibility of landslides, collapses and mudslides. By landslides, collapses, mudslides and other disasters affecting the region; three is to strengthen the construction site on the various key parts and key links of the inspection, focusing on checking the construction site drainage and transportation road slopes pit support scaffolding engineering construction electricity high template works and support systems lifting lifting and installation and dismantling of underground excavation and underwater work projects and other hazardous sub-items of the project supervision; four is to strengthen the construction of meteorological and construction monitoring, timely warning. and construction monitoring, timely warning, effective preventive measures.

(E) the implementation of the duty system, to ensure smooth information

The construction site should prepare a good flood duty schedule, to ensure that communication equipment 24 hours a day, to take the initiative to contact with the meteorological department supervision unit, timely grasp of rain and water conditions, and to do a good job before the advent of dangerous conditions of prevention and evacuation work to reduce property damage to avoid casualties. Once the danger occurs, timely report to the town flood season in the construction site safety production leading group, while organizing emergency rescue team into rescue and disaster relief, to ensure that the affected areas of construction personnel and the lives of the masses to minimize property losses. After the arrival of the emergency rescue team in the higher units, all actions to listen to the command.

Fourth, the principle of flood construction

(a) and the meteorological and hydrological departments to strengthen contact with the understanding of the local natural climate and geological conditions and the project's specific construction tasks, targeted preparation of the flood season construction organization design and technical measures, the construction of the flood season to make reasonable arrangements for the preparation of a full range of suitable construction materials and protective equipment, to avoid the difficulty of preparing materials to affect the construction of the flood season. The project will not be affected by the difficulty of preparing materials.

(b) Residential warehouses, vehicles, machinery and other production facilities should be parked above the flood level, and away from the mudslide trench alluvial pile, the construction of temporary drainage facilities, to ensure that the work site is not flooded and can be removed in a timely manner from the surface water.

(c) According to the weather forecast and the actual situation of the project, before the flood came to the machinery and equipment in batches to withdraw from the danger zone parked in a safe location, build drainage facilities in order to discharge water in a timely manner, to prevent torrential rains washout trench collapse, to ensure safety.

Fifth, the work requirements

(a) Awareness-raising, strengthen the organizational leadership

The relevant units of the construction site should attach great importance to the work of the flood safety, in-depth analysis of the situation of the sector's production safety, seriously develop the program of the flood program and the emergency rescue program, to strengthen the implementation of the responsibility of supervision and inspection, the establishment of the safety risk assessment system. Safety risk assessment system hidden trouble investigation and rectification system and accountability system for accidents. Timely and comprehensive flood inspection, eliminate all kinds of accidents and hidden dangers, to ensure the safety of people's lives and property.

(B) the implementation of measures, strict supervision and law enforcement

Each unit should implement its own production safety responsibilities staffing emergency plans hidden rectification and other safety production situation of self-check and self-correction. Problems and hidden dangers found in the inspection, to supervise the rectification and elimination, and in a timely manner, "look back", the discovery of major hidden dangers, resolutely supervised, poor rectification or refusal to rectify the project or unit, resolutely from the heavy and strict punishment.

(C) strengthen the duty, timely reporting of information

To strengthen the flood watch work, the strict implementation of the 24-hour duty system, the duty officer should remain at their posts, to ensure smooth communication, do a good job on the analysis of the relevant information research and judgment, in the event of an urgent and important situation or major emergencies above major disaster risk, we must immediately report to the report and take effective measures to deal with the organization of timely Carry out advance emergency rescue work. False reporting and concealment of accidents of enterprises and individuals, will be severely punished according to law.

Flood prevention and control program 3

In order to effectively do a good job in 20xx county transportation system flood relief work, to ensure the safety of the smooth flow of traffic, effective control and lifting of dangerous situations, to maximize the degree of avoidance and reduction of casualties and property losses, according to the spirit of the county government's flood control work conference and the municipal bureau of the work of the flood control guidance, combined with the actual county transportation system, the development of the 20xx year flood control work program.

First, the overall requirements

Flood control work is related to the safety of people's lives and property, related to economic construction and social stability. To fully understand the severity of flooding, resolutely overcome the weak awareness of flooding, paralysis and the mentality of chance, enhance the sense of responsibility, sense of urgency. In case of excessive flooding, we should make every effort to rescue and protect the main facilities to ensure the safety of transportation, and have emergency measures to minimize the loss of flooding. Once the flood threat and damage, complete the repair task, to ensure the normal passage of the highway. Adhere to the flood prevention and flood prevention, flood control and drought control, to ensure the completion of the transportation sector flood control and drought control work tasks.

Second, the work of

In accordance with the county flood control headquarters member unit duties are defined, the traffic system units of flood control duties are as follows:

Highway Bureau: responsible for the county national highways, provincial highways and other trunk highway traffic flood safety, timely organization of manpower, materials and resources on the flood-damaged highways, bridges and culverts to repair to ensure smooth roads. The road is smooth.

Rural Highway Management Office: responsible for the county's rural highway traffic flood safety, timely organization of manpower, material resources on rural roads, water damaged roads, bridges and culverts to repair, to ensure smooth roads.

Transportation Bureau: responsible for organizing and coordinating the delivery of rescue and relief materials and evacuees in the big flood.

Law enforcement: responsible for maintaining the order of the flood disaster site; to assist the public security department to ensure that the dangerous sections of the road open.

The county steam transport company, the city transport passenger transport company: responsible for organizing flood control and rescue, disaster relief and key flood engineering materials transportation.

Bureau: responsible for flood control during the communication between the members of the team liaison and transportation system within the flood control management and coordination work.

Third, the organizational leadership and division of labor

In order to clarify the responsibilities, strengthen the inspection and supervision, against the responsibilities of the units, the Bureau of Flood Control Command members of the division of labor is as follows:

xxx: the Bureau of Flood Control is responsible for the work of the whole bureau, the unified command of the whole Bureau of Flood Control work.

xxx: the bureau in charge of flood control work, responsible for the daily work of the Bureau of Flood Control Command, to assist the Secretary to coordinate the system-wide flood control work.

xxx: responsible for highway bureau flood control.

xxx: responsible for transportation development company flood control work.

xxx: subdivided into the Transportation Bureau, the county steamship company, the city transport Guangshan company flood control work.

xxx: in charge of rural highway management flood control work.

xxx: in charge of law enforcement flood control work.

The administrative director of each unit is the first person responsible for the unit's flood control work.

Fourth, rescue personnel, vehicle arrangements

The system is prepared for flood control rescue personnel 120 people, 40 vehicles. Among them: Highway Bureau 30 people, car 10; Transportation Bureau 20 people, the organization of social vehicles 10; law enforcement 30 people; county steamship company 30 people, car 10; city passenger transport company 30 people, 10 buses. In the event of a major flood or dangerous situation, the unit personnel by the unit's first person in charge of the team, the vehicle by the unit in charge of the leadership team to participate in the rescue mission (each unit of the list of rescue personnel reported to the Bureau of Flood Control Office, the Office is located in the Bureau of Business Unit).

Fifth, the work requirements

1, strengthen the awareness of flood control. The units should effectively strengthen the leadership of flood control work, carefully organized, and actively prepare for the full implementation of the "Flood Control Act" duties and obligations, enhance the awareness of flooding, firmly establish the peace and security, the idea of constant preparedness, proactive flood control work.

2, the strict implementation of the flood control responsibility system. The full implementation of the administrative system of responsibility, to achieve the idea in place, work in place, command in place, input in place. Team members and related personnel should be clear responsibilities, clear tasks, each in its own way, each responsible for their own responsibilities, and work closely together.

3, strict flood control work discipline. Flood control work is a great responsibility, all units should be from the overall height, from the people's lives and property safety, fully understand the importance of flood control work, strictly abide by the relevant provisions, obey orders, follow the command. Where the work of malfeasance, passivity, shirking responsibilities and other work caused by losses, we must resolutely pursue the leadership and the responsibility of the parties concerned.

4, each unit should be in the flood season before the arrival of the unit of infrastructure, highways, bridges, production workshops, fields, stations, construction sites, vehicle safety conditions comprehensively conducted a check, found that the hidden dangers of timely rectification of potential accidents will be eliminated in the embryonic state, the flood control and "safety month", The "safe production year" and the production safety special rectification activities closely combined to ensure that the flood control and safe production of both, to ensure safe flooding.

5, during the flood control units, a hand for business, private outings, must be to the main leadership of the Bureau of leave, otherwise, according to disciplinary action. All units should adhere to the 24-hour duty system. In case of emergency rescue personnel, vehicles to ensure that on-call, to ensure that nothing is wrong.

Flood control program 4

My town is located in the mountains, complex terrain, more ponds and reservoirs, coupled with the decline in forest cover in recent years, affecting the balance of the forest ecology, resulting in more serious soil erosion, so that floods are frequent, endangering the normal life of the people and the safety of life and property. In order to do a good job of prevention, reduce losses, especially the development of militia flood rescue program.

First, sound organization, strengthen leadership.

The town set up a flood rescue command post, by the mayor of the town xxx as commander, the town armed forces officer xxx.

Deputy commander, set up by the town water conservancy station, broadcasting station, postal branch, telecommunication branch and the town of the town supply and marketing agencies and other units of the person in charge of broadcasting the Yangzhen Flood Control Command Leadership Group, mainly responsible for the command of the flood control rescue and flood control during the week. The main responsibility is to command the flood control and the usual flood control work.

The second, to raise awareness, to prevent.

All units should be put on the agenda of flood control and rescue work, relying on the masses to do a good job of flood control and rescue work. First, to understand the region's topography and changes in the flood situation over the years, combined with the actual development of flood control, rescue plans and action plans, emergency preparedness, to reduce the losses caused by floods; Second, to strengthen the management of the affiliated mountain reservoirs, to determine the person responsible for strict compliance with the provisions of the management of reservoirs, the implementation of the reservoir safety inspection system, and found that the problem is promptly reported to the treatment.

Three, flood control and rescue when the measures.

1, to the town of wired communications as the main contact tool, if necessary, to cell phones as auxiliary communication tools. Flood season by the telecommunications branch opened a special line of telephone, to determine the person on duty, in order to grasp and inform the flood situation in a timely manner;

2, the town militia emergency detachment as a rescue and relief of the sharp force, at any time to listen to the town of the flood control command center of the dispatch, xx, xx, xx, xx four villages of the militia emergency detachment, in the town of the command center of the command, we must quickly arrive at the designated 'assembly area, received rescue Tasks. To implement the determination of transportation vehicles, once the traffic is blocked, instead of walking to the assembly area, the other village militia is mainly responsible for the village group range of flood control and rescue tasks.

3, to strengthen the important goal of flood control and rescue work. xx, xx villagers soldiers (including emergency detachment) in addition to bear the village disaster relief tasks, good to bear the town units of the rescue and relief tasks.

4, disaster rescue procedures. Town leaders to organize the transfer of personnel, and then rescue important targets and warehouses.

5, vigilance, to prevent criminals from taking advantage of the opportunity to destroy.

6, do a good job in the post-disaster victims of life resettlement, and actively organize post-disaster production self-help, rebuild their homes.

Fourth, the requirements:

1, all the militia should put the interests of the country and the people in the first place, to have the idea of sacrificing a small family to care for the big one, always ready to put into the rescue and relief work;

2, obey orders, follow the command;

3, the villages, especially the village of the emergency detachment, flood season to determine the special person duty

Flood control program 5

In order to ensure that the jurisdiction of the flood control work properly carried out to create a safe social environment, to maintain stability, development, and service of the overall situation, especially the development of the annual flood control work plan (arrangement) is as follows:

First, raise awareness, to overcome paralysis, and seriously do a good job in preparation for flood control

In accordance with the district flood control office unified deployment, based on the prevention of major floods, the flood control office will be able to provide the necessary information and support for the flood control program. Office of the unified deployment, based on flood control, flood resistance, early preparation. Insist on flood prevention and flooding, to do active prevention focus. 618 drains are flowing through my jurisdiction, the flood water level in previous years is higher, the threat to my jurisdiction is greater. In addition to the jurisdiction of the drainage pipe is not smooth, the river siltation is serious, flood control project is not perfect, therefore, the street flood control work pressure task is arduous, the villages, communities, resident enterprises and institutions and institutions of the departments must overcome the paralysis and the mentality of chance, be sure to from the ideological, organizational, and measures to be fully prepared to be always ready to do, be prepared for any trouble.

Second, a clear task, the implementation of measures to ensure flood safety

This year, the streets of the flood control work resolutely implement the "safety first, unremitting, prevention-oriented, all-out rescue" policy, specific tasks and measures are:

1, Villages, communities, resident enterprises and institutions, street departments should be seriously in accordance with the "Flood Control Act" requirements, the full implementation of the leadership of the flood control system, the main leader of the unit's overall responsibility for flood control work.

2, according to the unified deployment of the district, combined with the situation of my street to the village (community) as a unit, in the village (community) area by the village (community) is specifically responsible for the area units are responsible for flood control in the region. Street Flood Control Office is responsible for organizing the preparation of flood control materials for rescue. Street justice with the Tanjia police station is responsible for maintaining the order of flood control, organizing the evacuation and transfer of people to combat the theft of flood control materials, destruction of flood control projects, communication circuits of criminals.

3, to establish a "prevention-oriented, prevention is more important than robbery" approach to carry out pre-flood inspection: (1) villages, communities, resident enterprises and institutions should be on the flood control facilities, school classrooms, material warehouses, workers, the masses of housing for a serious pre-flood inspection. (2) the streets of the village (community) leaders of the village (community) is responsible for the village (community). (3) organs of the departments of the village (community) to carry out a comprehensive inspection of the problems identified must be rectified within a time limit. Requirements for all units to clean and dredge drainage facilities in a timely manner to ensure smooth drainage. The low-lying flood-prone land to strengthen the management of drainage facilities, arrange for specialists to be responsible for, give full play to its drainage capacity, the division of labor responsible for the leadership and units not only to do a good job of pre-flood inspection and precautionary measures, but also for the entire process of flood control is responsible for in the end.

Third, the organization of the rescue team, do a good job of material reserves

The street organization of a militia emergency detachment of flood rescue, militia emergency battalion personnel *** 40 people, flood season directly by the streets of the Armed Forces Department of the unified organization of the command, responsible for the work of the rescue; villages, communities, and the public security members of the joint security forces, according to the village (community) size to form no less than 10 people rescue commandos, the village (community). than 10 people rescue commando, by the street flood control office unified deployment, unified command. Street units should be based on the size of the unit and the weight of the task, set up a flood control office and rescue commando, street protection is responsible for organizing a 10-person rescue squad, responsible for flood rescue in the medical rescue work and the organization of the health epidemic prevention work.

Before the flood, the units should carry out the necessary technical training to ensure that the emergence of dangerous situations when pulling out, grabbing, guarding, ready for the flood rescue.

The villages, communities, resident units of the required flood control materials and tools, in line with adhere to the principle of self-reliance, the principle of local materials, to take the collective reserve and the masses of the combination of reserves, early reserves, special custodian; with the use of the take, do not miss the rescue.

Fourth, the establishment of the duty system, strengthen the information contact and reporting system

The villages, communities, resident enterprises and institutions from now on by the leadership of the implementation of the day and night duty, and will be on duty arrangements reported to the street flood control office. Heavy rain is an order, heavy rain during the flood season if it lasts more than half an hour, all units of emergency crews are on duty in place, such as in case of danger, timely instructions, timely reporting.

Fifth, strengthen the organizational leadership, the establishment of a sound flood control institutions

Flood control, flood control, the overall situation, the responsibility is heavier than Mount Tai. The villages, communities, resident units must be from the stability, development, service of the overall situation, and effectively strengthen the leadership of the flood control work, we must conscientiously implement the system of responsibility for the core of a variety of flood control responsibility system. Street set up a flood control leading group and office, to improve the street flood control work. Villages, communities and resident units should also set up a flood control leadership group, headed by the main leader.

Six, strict discipline, flood control according to law

All units should establish a global perspective, strict implementation of flood control discipline, obey the scheduling command, cooperation, close coordination, unity against floods, and must not be allowed to do things on their own. In the flood emergency, the street flood control office according to the needs of flood control, the right to call materials and equipment, transportation and manpower, as well as take other necessary emergency measures. To further implement the "Water Law", "Flood Control Law", "River Management Regulations" and other flood control laws and regulations, disobedience to mob interference with project management and flood control order, refused to clear the barricades or set up new barricades, unauthorized digging in the dangerous section of the river sand extraction, do not listen to dissuasion, destruction, theft of flood control works and flood control materials and flood control facilities, embezzlement, misappropriation of flood relief materials and funds, as well as negligence, unauthorized operation resulting in losses The direct leadership and the parties involved shall be held responsible according to the law. Flood control and flood prevention, rescue and relief work in the contribution of the unit or individual, to give recognition.

Flood prevention and control program 6

First, the guiding ideology of flood control

attach great importance to strengthening leadership, close monitoring, timely forecasting, accurate strikes, in order to ensure that the national property and people's lives for the purpose of the purpose of rescue and relief, the disaster caused by the loss of a minimum degree.

Second, the goal of this year's flood control work and the main measures

The goal of this year's flood control work is: to implement the "safety first, prevention-oriented, unremitting, all-out rescue" prevention policy, based on the prevention of floods, disasters, for the various types of floods that may occur. Flood disaster, from the organization, system, personnel, materials and other aspects of the development of programs, countermeasures and measures. The main measures taken:

(a) Awareness-raising, and further strengthen the leadership of the flood control work.

I want to fully realize that the flood is a devastating natural disaster, which not only destroys the natural forest project, the return of farmland to forest project has achieved results, damage to the ecological environment, but also cause huge economic losses and people's lives and property losses, but also affects the social stability of the country on the realization of the strategy of sustainable development. According to the requirements of the Party's mass line education and practice activities and the spirit of high responsibility to the people, from the overall situation of reform, development and stability, the flood control work on the important agenda.

(2) seriously do a good job of flood control publicity, and effectively improve the awareness of flood control.

The forest station should regularly go into the forest, pasture, village, combined with the "Flood Control Law", "Flood Control Regulations" and other laws and regulations, to carry out a variety of forms of publicity activities, to take the centralized publicity and decentralized combination of fixed-point publicity and the combination of the flow of publicity, so that the flood control into the forest area of the hearts of every one of the masses, so that the vast majority of cadres and masses of the forest area to enhance the enthusiasm of the flood control and conscientiousness.

(C) Strengthen the inspection, eliminate the flood control hazards.

The cadres and workers of the forestry station and the township rangers should effectively fulfill their duties, increase the jurisdiction of the river, mountain disaster-prone areas to exclude, so as to predict the warning in advance, to prevent the occurrence of flood disasters and landslides.

(d) Strengthen the duty and flood control reporting system.

During the flood control period, the Bureau to adhere to the 24-hour duty system, the leadership must personally take the shift, timely handling of related matters, to effectively strengthen the sense of mission and responsibility, and adhere to the post, so that the situation is clear, the data is accurate.

(E) to further improve the supply of flood control and disaster timber, and actively improve the ability to respond.

I will do a good job in the supply of flood control timber, reserve a certain amount of timber, such as once the flood occurred, timber transfer location arrangements in the county of the Golden Soup timber processing plant, can be provided at any time to the disaster area of the required timber.