Laboratory wastewater treatment can be used to use the use of laboratory integrated wastewater treatment for processing, the specific installation method is shown below:
1. In the university research laboratory wastewater treatment equipment installation needs to be based on the installation of the floor plan, do a good job of the concrete base work, so that the average ground pressure can be up to 5t/m2, the ground in the ground concrete foundation poured after the completion of the maintenance period before Can be installed; then you can carry out the installation of university research laboratory wastewater treatment equipment.
2. Designed to connect the equipment pipeline alignment, university research laboratory wastewater treatment equipment must be in accordance with the instructions of the equipment weight, the order of installation against the installation drawings, the location of the equipment can not be put wrong, the spacing between the tank and the equipment must be reasonable.
3. Connection of the pipeline using rubber pads for confinement, water pipe interface between the use of tools to tighten, so that the connection will not produce liquid leakage.
4. University research laboratory wastewater treatment equipment in the installation is completed, the equipment and the floor between the use of screws or other items must be fastened to ensure that the equipment will not produce movement.
5. The equipment needs to be tested before formal use, the equipment operating parameters while testing and adjusting.
Wastewater treatment equipment use
1. Wastewater treatment equipment is a high degree of automation, the operator does not need to operate in every link. The design system of general sewage treatment equipment is divided into the main body of the reaction tank, dosing system, filtration system, disinfection system, electronic control system and other components.
2. The sewage treatment equipment is installed with automatic LPC controller and manual controller. Equipment managers can choose the corresponding operating system by themselves according to their needs.
3. Among all the systems, it is the dosing system that needs to be operated by the equipment management personnel, and the dosing system is mainly divided into PAC dosing system, PAM dosing system, acid dosing system and alkali dosing system.
Equipment managers need to choose the chemicals according to the sewage situation to configure. Ratio concentration is generally PAC (3% -5%), PAM (0.1% -0.2%), through the metering pump to add, if the sewage situation changes, then the configuration ratio can be changed accordingly.
4. Dosing operation: connect the dosing device, and then check each flange interface, to be fastened to avoid fluid leakage. Then connect the power supply of the metering pump, open the junction box of the electronic control cabinet, the metering pump power line into the corresponding terminals. Close the sewage valve, the liquid is poured into the liquid container. Open the dosing system valve, start the metering pump.
5. In addition to dosing, another thing to do is to maintain the equipment, equipment maintenance is a long-lasting and stable work, which needs to be done regularly and quantitatively. Specific maintenance methods can refer to other articles on the official website of Blue Membrane Water Treatment.