1, the premise that there is a plan for what they want to do.
2, there is enough money.
3, to drill deep water wells.
4, into the production of water machines, filling and packaging equipment.
5, buy a vehicle to deliver water.
6, recruiting personnel.
Second, the water plant must obtain the following "licenses"
1, "production license", "SC certification" (originally called) "QS") Quality and Technical Supervision.
2, "practitioners health license" Health Bureau.
You can apply for the following documents:
1, "business license" Bureau of Industry and Commerce.
2, "tax registration certificate" tax bureau.
Third, plant requirements
Recognized by the competent drinking water experts, and identified by the Department of Geology and Mining through the evaluation of natural mineral water, pure water and other evaluation reports as a basis for feasibility assessment, never blindly signed and blindly build a plant.
1, never build a plant far from the water source (wells, springs), the plant and the water source should be the closest distance for the best program.
2, the size of the plant should depend on the size of mineral water, pure water can be mined reserves, the source of resources, pure water plant equipment, mineral water plant equipment production capacity and the degree of financial guarantee.
Fourth, the plant decoration requirements
Plant size based on the requirements of the plant, but must accommodate filling and other equipment under the conditions of the plant as spacious as possible, comfortable as a principle. General medium-sized enterprises for the length of 20-50 meters, 10-15 meters wide, within this range of different uses of the interval, divided into bottle washing, filling, water treatment, etc.. Workshop requirements must be clean and dust-free ground with terrazzo, smooth drainage, there shall be no stagnant water, tiled walls, etc., the plant should be made airtight, more aluminum alloy doors and windows. Rinsing, filling, capping part can be made specifically closed workshop.
Fifth, the water plant equipment:
Must be approved by the relevant Ministry of Health "water-related approvals" of the "RO" secondary reverse osmosis water purification equipment.
1, the water plant equipment can choose to pure water production a little larger (at least 2 tons / hour water equipment, 150 barrels / hour or more barrel filling machine, brush barrel machine, sealing machine, aseptic workshop).
2, run a water station equipment can be smaller (1 tons / hour, about 400 barrels / day).
Six, capital:
Doing water plant at least 10 - 15 million yuan (excluding plant)
1, to the Commerce and Industry Bureau for a business license.
2, to the tax bureau for tax registration certificate.
3, to the Bureau of Technical Supervision for the production license, that is, SC certification (originally called "QS").